Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Hanoi Housing Management Center as follows:
- Has relationships with 3 project owners.
- Has relationships with 158 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 102 contractor selection plans with a total of 217 bidding packages, of which 102 prequalification documents have not found the investment project.
- Has invited bids for 98 packages (with 124 tender notices), and conducted prequalification for 1 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 169 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 86 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 141 packages that have not fully posted the contractor selection results. Of these 136 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.66 contractors.
- Breakdown by bidding field: Goods 16.94%, Construction 1.61%, Consultancy 12.90%, Non-consultancy 68.55%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 212,539,687,080 VND, of which the total winning bid value is: 197,635,591,238 VND.
- The savings rate is: 7.01%.
Data analysis results of DauThau.info software for bid solicitors Hanoi Housing Management Center as follows:
- Has relationships with 158 contractor.
- The average number of contractors participating in each bidding package is: 1.66 contractors.
- Proportion of bidding fields: Goods 16.94%, Construction 1.61%, Consulting 12.90%, Non-consulting 68.55%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 212,539,687,080 VND, in which the total winning value is: 197,635,591,238 VND.
- The savings rate is: 7.01%.
This Bid solicitor is also an investor. The analysis results of data for the investor Hanoi Housing Management Center are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 137 contractor selection plans, of which 92 were self-published, and 45 were published by other entities.
- Is the investor of 126 Tender Notices, of which 118 were self-invited, and 8 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Construction repair, equipment replacement Unit 5 and outdoor infrastructure My Dinh II student housing area, Tu Liem ward, Hanoi city in the form Open bidding .
14/01/2026 10:53
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Construction repair, equipment replacement Unit 3, 4 My Dinh II student housing area, Tu Liem ward, Hanoi city in the form Open bidding .
14/01/2026 10:53
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Construction repair, equipment replacement Unit 1,2 My Dinh II student housing area, Tu Liem ward, Hanoi city in the form Open bidding .
14/01/2026 10:52
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Construction repair, equipment replacement Project: Renovation of house A6 and outdoor infrastructure Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city in the form Open bidding .
14/01/2026 10:52
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Repairing works, replacing home equipment A5 Unit 1,2 Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city in the form Open bidding .
14/01/2026 10:50
Hanoi Housing Management Center announced the results of the bid package Providing mandatory fire and explosion insurance services in 2025 My Dinh II student housing area, Tu Liem ward, Hanoi city .
10/01/2026 10:53
Hanoi Housing Management Center announced the results of the bid package Providing mandatory fire and explosion insurance services in 2025 Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city .
- Winning bidder: BaoViet Insurance Corporation
10/01/2026 10:51
Hanoi Housing Management Center announced the results of the bid package Providing mandatory fire and explosion insurance services in 2025 CT19A social housing area Viet Hung urban area, Viet Hung ward, Hanoi city .
- Winning bidder: BaoViet Insurance Corporation
10/01/2026 10:49
Hanoi Housing Management Center announced the results of the bid package Package No. 03: Consulting on appraisal of environmental documents and appraisal of NTFP Package No. 04: Repair of works, replacement of home equipment A5 Unit 1,2 Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city .
10/01/2026 10:34
Hanoi Housing Management Center announced the results of the bid package Package No. 03: Consulting on appraisal of environmental documents and appraisal of NTFP Package No. 04 Construction repair, equipment replacement Project Renovating house A6 and outdoor infrastructure Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city .
- Winning bidder: CAPITAL CONSULTANT INVESTMENT CONSTRUCTION AND TRADING COMPANY LIMITED
10/01/2026 10:31
The data sheet has been partially hidden, to see the full information please Login or Register
Hanoi Housing Management Center announced the results of the bid package Consulting on verifying technical and economic reports on the task of building villa management software .
- Winning bidder: IVT INVESTMENT CONSULTING AND TECHNOLOGY DEVELOPMENT SUPPORT JOINT STOCK COMPANY
17/12/2025 14:43
Hanoi Housing Management Center announced the results of the bid package Consulting on verifying technical and economic reports for the task of 3D digitization of group 1 villas .
- Winning bidder: B-SMART JOINT STOCK COMPANY
17/12/2025 14:38
Hanoi Housing Management Center announced the results of the bid package Consulting on verification of technical and economic reports, tasks of establishing management records and villa database .
- Winning bidder: B-SMART JOINT STOCK COMPANY
17/12/2025 14:29
Hanoi Housing Management Center publishes the plan Consulting on verifying technical and economic reports on the task of building villa management software (investment preparation phase) with 1 bidding package .
17/12/2025 14:25
Hanoi Housing Management Center publishes the plan Consulting on verification of technical and economic reports for the task of 3D digitization of group 1 villas (Investment preparation phase) with 1 bidding package .
17/12/2025 14:20
Hanoi Housing Management Center publishes the plan Consulting on verification of economic and technical reports, tasks of establishing management records and villa database (Investment preparation phase) with 1 bidding package .
17/12/2025 14:16
Hanoi Housing Management Center announced the results of the bid package GT06 (NV3) .
- Winning bidder: VAN AN - HA NOI VALUATION AND AUDITING COMPANY LIMITED
11/11/2025 15:21
Hanoi Housing Management Center announced the results of the bid package GT06 (NV2) .
- Winning bidder: VAN AN - HA NOI VALUATION AND AUDITING COMPANY LIMITED
11/11/2025 15:19
Hanoi Housing Management Center announced the results of the bid package GT06 (NV1) .
- Winning bidder: VAN AN - HA NOI VALUATION AND AUDITING COMPANY LIMITED
11/11/2025 15:17
Hanoi Housing Management Center announced the results of the bid package GT03 (NV2) .
- Winning bidder: DATATECH DATA TECHNOLOGY COMPANY LIMITED
04/09/2025 17:35
The data sheet has been partially hidden, to see the full information please Login or Register
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Construction repair, equipment replacement Unit 5 and outdoor infrastructure My Dinh II student housing area, Tu Liem ward, Hanoi city in the form Open bidding .
14/01/2026 10:53
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Construction repair, equipment replacement Unit 3, 4 My Dinh II student housing area, Tu Liem ward, Hanoi city in the form Open bidding .
14/01/2026 10:53
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Construction repair, equipment replacement Unit 1,2 My Dinh II student housing area, Tu Liem ward, Hanoi city in the form Open bidding .
14/01/2026 10:52
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Construction repair, equipment replacement Project: Renovation of house A6 and outdoor infrastructure Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city in the form Open bidding .
14/01/2026 10:52
Hanoi Housing Management Center publishes Tender Notice Tender package No 04: Repairing works, replacing home equipment A5 Unit 1,2 Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city in the form Open bidding .
14/01/2026 10:50
Hanoi Housing Management Center announced the results of the bid package Providing mandatory fire and explosion insurance services in 2025 My Dinh II student housing area, Tu Liem ward, Hanoi city .
10/01/2026 10:53
Hanoi Housing Management Center announced the results of the bid package Providing mandatory fire and explosion insurance services in 2025 Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city .
- Winning bidder: BaoViet Insurance Corporation
10/01/2026 10:51
Hanoi Housing Management Center announced the results of the bid package Providing mandatory fire and explosion insurance services in 2025 CT19A social housing area Viet Hung urban area, Viet Hung ward, Hanoi city .
- Winning bidder: BaoViet Insurance Corporation
10/01/2026 10:49
Hanoi Housing Management Center announced the results of the bid package Package No. 03: Consulting on appraisal of environmental documents and appraisal of NTFP Package No. 04: Repair of works, replacement of home equipment A5 Unit 1,2 Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city .
10/01/2026 10:34
Hanoi Housing Management Center announced the results of the bid package Package No. 03: Consulting on appraisal of environmental documents and appraisal of NTFP Package No. 04 Construction repair, equipment replacement Project Renovating house A6 and outdoor infrastructure Phap Van Tu Hiep student housing area, Yen So ward, Hanoi city .
- Winning bidder: CAPITAL CONSULTANT INVESTMENT CONSTRUCTION AND TRADING COMPANY LIMITED
10/01/2026 10:31
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Hanoi Housing Management Center has posted 102 of the contractor selection plan, which contains 217 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hanoi Housing Management Center posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Hanoi Housing Management Center has posted 124 Tender Notices in 98 bidding packages. Among these, 117 Tender Notices were self-invited, and 7 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hanoi Housing Management Center has posted 169 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 169 package, canceled the bid 0 package (among the bidding packages above).
- There are 86 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Hanoi Housing Management Center has a relationship with 158 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hanoi Housing Management Center has a relationship with 21 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Hanoi Housing Management Center has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects