Data analysis results of DauThau.info software for bid solicitors Phòng kinh tế xã Khánh Hoà as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 5 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng kinh tế xã Khánh Hoà as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Phòng kinh tế xã Khánh Hoà are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 7 contractor selection plans, of which 0 were self-published, and 7 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Phòng kinh tế xã Khánh Hoà publishes the plan Plan for selecting contractors for the project Repairing traffic works: Embankment to prevent stream bank erosion in Lang Khuong village; Build an embankment and re-fill the underground surface of village 1; Construction of culvert walls and embankments to protect village 2 road; Embankment to prevent landslides in Cua Hoc village, Khanh Hoa commune with 4 bidding package .
31/07/2026 11:03
Phòng kinh tế xã Khánh Hoà publishes the plan Contractor selection plan for construction investment preparation packages: Repair of traffic works: Embankment to prevent stream bank erosion in Lang Khuong village; Build an embankment and re-fill the underground surface of village 1; Construction of culvert walls and embankments to protect village 2 road; Embankment to prevent landslides in Cua Hoc village, Khanh Hoa commune with 4 bidding package .
31/07/2026 10:30
Investor Phòng kinh tế xã Khánh Hoà has posted an investment and development project Repair of traffic works: Embankment to prevent landslides on stream banks in Lang Khuong village; Build an embankment and re-fill the underground surface of village 1; Construction of culvert walls and embankments to protect village 2 road; Embankment to prevent landslides in Cua Hoc village, Khanh Hoa commune..
31/07/2026 10:10
Phòng kinh tế xã Khánh Hoà announced the results of the bid package Construction of road from village 13 to village 11, Khanh Hoa commune, Lao Cai province .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN XDTM PHÚC VINH
13/06/2026 22:05
Phòng kinh tế xã Khánh Hoà announced the results of the bid package Construction of the road connecting the two sides of the bridge in Lang Chap village, Khanh Hoa commune, Lao Cai province .
13/06/2026 22:05
Phòng kinh tế xã Khánh Hoà publishes the plan Plan for selecting contractors for the project Road from village 13 to village 11, Khanh Hoa commune, Lao Cai province with 3 bidding package .
29/05/2026 00:50
Phòng kinh tế xã Khánh Hoà announced the results of the bid package Construction work: Expanding and concreting the road (Khe Y to Khe Rieng) from village 7 to village 11, Khanh Hoa commune, Lao Cai province .
- Winning bidder: DAI LUC COMPANY LIMITED
29/05/2026 00:43
Phòng kinh tế xã Khánh Hoà publishes the plan Contractor selection plan for road expansion and concreting project (Khe Y to Khe Rieng) village 7 to village 11, Khanh Hoa commune, Lao Cai province with 3 bidding package .
29/05/2026 00:41
Phòng kinh tế xã Khánh Hoà announced the results of the bid package Construction of the road connecting village 7 to the stream bank to village 5, Khanh Hoa commune, Lao Cai province .
- Winning bidder: DAI LUC COMPANY LIMITED
29/05/2026 00:30
Phòng kinh tế xã Khánh Hoà publishes the plan Plan for selecting contractors for the project Road connecting village 7 to the stream bank to village 5, Khanh Hoa commune, Lao Cai province with 3 bidding package .
29/05/2026 00:28
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects