Data analysis results of DauThau.info software for bid solicitors Power Grid Project Management Board as follows:
- Has relationships with 1 project owners.
- Has relationships with 189 contractor.
- Announced 134 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 80 contractor selection plans with a total of 142 bidding packages, of which 26 prequalification documents have not found the investment project.
- Has invited bids for 301 packages (with 333 tender notices), and conducted prequalification for 0 packages.
- There are 40 bidding packages with content that needs clarification.
- Announced the results of 304 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 9 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 58 packages that have not fully posted the contractor selection results. Of these 57 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.11 contractors.
- Breakdown by bidding field: Goods 18.32%, Construction 12.31%, Consultancy 46.25%, Non-consultancy 23.12%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,031,068,611,006 VND, of which the total winning bid value is: 1,795,949,765,505 VND.
- The savings rate is: 11.58%.
Data analysis results of DauThau.info software for bid solicitors Power Grid Project Management Board as follows:
- Has relationships with 189 contractor.
- The average number of contractors participating in each bidding package is: 2.11 contractors.
- Proportion of bidding fields: Goods 18.32%, Construction 12.31%, Consulting 46.25%, Non-consulting 23.12%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,031,068,611,006 VND, in which the total winning value is: 1,795,949,765,505 VND.
- The savings rate is: 11.58%.
This Bid solicitor is also an investor. The analysis results of data for the investor Power Grid Project Management Board are as follows:
- Is the investor of 134 development investment projects.
- Is the investor of 149 contractor selection plans, of which 80 were self-published, and 69 were published by other entities.
- Is the investor of 254 Tender Notices, of which 78 were self-invited, and 176 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Power Grid Project Management Board announced the results of the bid package Package NPCBA1.T2YM.110kV.G06: Construction insurance .
- Winning bidder: Vietinbank Insurance
07/01/2026 09:37
Power Grid Project Management Board announced the results of the bid package NPCBA1.TT110.G13: Construction insurance .
- Winning bidder: Tổng Công ty cổ phần bảo hiểm Petrolimex
07/01/2026 09:21
Power Grid Project Management Board publishes Tender Notice NPCBA1.T2SĐ.110KV.G05: Providing VTTB and construction services for installation and installation in the form Open bidding .
31/12/2025 21:20
Power Grid Project Management Board announced the results of the bid package Providing software control system software, correction experiments, configuration and connection of SCADA signal full TBA and Line parameters .
- Winning bidder: GCOM TECHNOLOGY JOINT STOCK COMPANY
30/12/2025 10:24
Power Grid Project Management Board announced the results of the bid package Npcba1.t2k2.110kv.g07: Experimental correction experiments, configuration and SCADA signal connection .
- Winning bidder: TNG VIET NAM TECHNOLOGY JOINT STOCK COMPANY
30/12/2025 10:23
Power Grid Project Management Board announced the results of the bid package NPCBA1.T2SĐ.110KV.G08: Construction insurance .
- Winning bidder: BAO MINH INSURANCE CORPORATION
29/12/2025 15:00
Power Grid Project Management Board announced the results of the bid package Package NPCBA1.ĐVPL.220kV.G02: Survey and prepare construction investment feasibility study report; Survey, prepare technical design, construction design and construction design .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1
26/12/2025 16:43
Power Grid Project Management Board announced the results of the bid package Npcba1.t2cl.110kv.g08: Construction insurance .
- Winning bidder: Post - Telecommunication Joint - Stock Insurance Corporation
23/12/2025 13:42
Power Grid Project Management Board publishes Tender Notice NPCBA1.ĐZ110GLBD.08: Construction insurance in the form Open bidding .
20/12/2025 10:45
Power Grid Project Management Board announced the results of the bid package Package NPCBA1.T2YM.110kV.G03: Providing VTTB and construction services for installation and operation .
- Winning bidder: HA NOI INDUSTRIAL ELECTRICITY JOINT STOCK COMPANY
20/12/2025 10:40
The data sheet has been partially hidden, to see the full information please Login or Register
Power Grid Project Management Board announced the results of the bid package No. G09: Consulting on Surveying, preparing technical plans, and estimating mine and explosive ordnance clearance .
- Winning bidder: 319 BOM, MINS, UXO ONE MEMBER COMPANY LIMITED
10/10/2025 17:13
Power Grid Project Management Board announced the results of the bid package No. G10: Construction of clearance of bombs, mines and explosives .
- Winning bidder: LUNG LO CONSTRUCTION CORPORATION
10/10/2025 17:09
Power Grid Project Management Board announced the results of the bid package NPC-KFW3-110ĐM-W02: DZ and TBA 110 kV Line and TBA 110 KV Line Projects and TBA .
- Winning bidder: SONG DA ENERGY INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY, DONG A ELECTRICITY INSTALLATION AND TRADING INVESTMENT JOINT STOCK COMPANY
24/09/2025 11:30
Power Grid Project Management Board announced the results of the bid package Npcba1.qc3.110kv.g07: Supply, transport and install 110kV MBA .
- Winning bidder: EEMC Electrical Designing and Manufacturing Company Limited
21/08/2025 09:54
Power Grid Project Management Board announced the results of the bid package Package No. 07: Construction of 110kV line from Thac Ba TBA - Doan Hung Station 110kV .
- Winning bidder: THAI BINH DUONG CONSTRUCTION AND INSTALLTION AND INVESTMENT JOINT STOCK COMPANY, VIET POWER DEVELOPMENT JOINT STOCK COMPANY
21/08/2025 09:48
Power Grid Project Management Board announced the results of the bid package NPCBA1. QC3.110KV.G09: Construction and installation of Quang Chau 30kV transformer and transformer station .
- Winning bidder: VIET LINH STAR TRADING COMPANY LIMITED
19/08/2025 14:09
Power Grid Project Management Board announced the results of the bidding package NPC-KFW3-110ĐM-W02: DZ and TBA 110 kV Line and TBA 110 KV Line Projects and TBA with 2 participating contractors .
14/08/2025 10:00
Power Grid Project Management Board announced the results of the bid package Package 07: Supply, transport and install VTTB 110kV . substation .
- Winning bidder: TOJI GROUP JOINT STOCK COMPANY
07/08/2025 10:57
Power Grid Project Management Board announced the results of the bidding package NPCBA1. QC3.110KV.G09: Construction and installation of Quang Chau 30kV transformer and transformer station with 4 participating contractors .
16/07/2025 10:05
Power Grid Project Management Board announced the results of the bid package Bidding package NPCBA1.SL.110KV.G09: Construction insurance .
- Winning bidder: PVI Insurance
14/07/2025 21:26
The data sheet has been partially hidden, to see the full information please Login or Register
Power Grid Project Management Board announced the results of the bid package Package NPCBA1.T2YM.110kV.G06: Construction insurance .
- Winning bidder: Vietinbank Insurance
07/01/2026 09:37
Power Grid Project Management Board announced the results of the bid package NPCBA1.TT110.G13: Construction insurance .
- Winning bidder: Tổng Công ty cổ phần bảo hiểm Petrolimex
07/01/2026 09:21
Power Grid Project Management Board publishes Tender Notice NPCBA1.T2SĐ.110KV.G05: Providing VTTB and construction services for installation and installation in the form Open bidding .
31/12/2025 21:20
Power Grid Project Management Board announced the results of the bid package Providing software control system software, correction experiments, configuration and connection of SCADA signal full TBA and Line parameters .
- Winning bidder: GCOM TECHNOLOGY JOINT STOCK COMPANY
30/12/2025 10:24
Power Grid Project Management Board announced the results of the bid package Npcba1.t2k2.110kv.g07: Experimental correction experiments, configuration and SCADA signal connection .
- Winning bidder: TNG VIET NAM TECHNOLOGY JOINT STOCK COMPANY
30/12/2025 10:23
Power Grid Project Management Board announced the results of the bid package NPCBA1.T2SĐ.110KV.G08: Construction insurance .
- Winning bidder: BAO MINH INSURANCE CORPORATION
29/12/2025 15:00
Power Grid Project Management Board announced the results of the bid package Package NPCBA1.ĐVPL.220kV.G02: Survey and prepare construction investment feasibility study report; Survey, prepare technical design, construction design and construction design .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1
26/12/2025 16:43
Power Grid Project Management Board announced the results of the bid package Npcba1.t2cl.110kv.g08: Construction insurance .
- Winning bidder: Post - Telecommunication Joint - Stock Insurance Corporation
23/12/2025 13:42
Power Grid Project Management Board publishes Tender Notice NPCBA1.ĐZ110GLBD.08: Construction insurance in the form Open bidding .
20/12/2025 10:45
Power Grid Project Management Board announced the results of the bid package Package NPCBA1.T2YM.110kV.G03: Providing VTTB and construction services for installation and operation .
- Winning bidder: HA NOI INDUSTRIAL ELECTRICITY JOINT STOCK COMPANY
20/12/2025 10:40
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Power Grid Project Management Board has posted 80 of the contractor selection plan, which contains 142 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Power Grid Project Management Board has posted 333 Tender Notices in 301 bidding packages. Among these, 88 Tender Notices were self-invited, and 245 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Grid Project Management Board has posted 304 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 304 package, canceled the bid 0 package (among the bidding packages above).
- There are 9 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Power Grid Project Management Board has a relationship with 189 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Grid Project Management Board has a relationship with 116 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Power Grid Project Management Board has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects