Data analysis results of DauThau.info software for bid solicitors Sở Giao thông vận tải Kon Tum as follows:
- Has relationships with 3 project owners.
- Has relationships with 38 contractor.
- Announced 10 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 119 contractor selection plans with a total of 417 bidding packages, of which 112 prequalification documents have not found the investment project.
- Has invited bids for 91 packages (with 106 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 140 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 63 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 307 packages that have not fully posted the contractor selection results. Of these 305 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.05 contractors.
- Breakdown by bidding field: Goods 1.89%, Construction 77.36%, Consultancy 14.15%, Non-consultancy 2.83%, Mixed 0%, Other fields 3.77%.
- The total value according to the packages with valid contractor selection results is: 608,849,291,888 VND, of which the total winning bid value is: 606,355,560,278 VND.
- The savings rate is: 0.41%.
Data analysis results of DauThau.info software for bid solicitors Sở Giao thông vận tải Kon Tum as follows:
- Has relationships with 38 contractor.
- The average number of contractors participating in each bidding package is: 1.05 contractors.
- Proportion of bidding fields: Goods 1.89%, Construction 77.36%, Consulting 14.15%, Non-consulting 2.83%, Mixed 0%, Other 3.77%.
- The total value according to the bidding package with valid IMP is: 608,849,291,888 VND, in which the total winning value is: 606,355,560,278 VND.
- The savings rate is: 0.41%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Giao thông vận tải Kon Tum are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 129 contractor selection plans, of which 113 were self-published, and 16 were published by other entities.
- Is the investor of 136 Tender Notices, of which 88 were self-invited, and 48 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A of the investor Sở Giao thông vận tải Kon Tum.
19/09/2022 14:47
The Bid solicitor PMU of investment in transportation construction of Kon Tum province has posted the request Plan to select contractor for the project of repairing foundation, road surface, drainage works, traffic safety section Km30 -Km39+930, resettlement road for Plei Krong hydropower plant of the investor Sở Giao thông vận tải Kon Tum with 2 bidding package.
13/09/2022 15:27
Bid solicitor Sở Giao thông vận tải Kon Tum has posted Tender Notice Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A of the investor Sở Giao thông vận tải Kon Tum with the form National shortened competitive bidding.
17/08/2022 09:24
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the request Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A of the investor Sở Giao thông vận tải Kon Tum with 1 bidding package.
10/08/2022 08:00
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Kon Tum.
29/07/2022 08:26
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Kon Tum.
29/07/2022 08:10
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Package No. 01: Survey consultancy, preparation of feasibility study report of the investor Sở Giao thông vận tải Kon Tum.
29/07/2022 07:58
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Kon Tum.
28/07/2022 16:43
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Construct of the investor Sở Giao thông vận tải Kon Tum.
- Winning bidder: CÔNG TY CỔ PHẦN TRƯỜNG LONG
28/07/2022 16:14
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Kon Tum.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN XÂY DỰNG SỐ 6 KONTUM
28/07/2022 15:47
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Giao thông vận tải Kon Tum announced the results of the bid package Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN SỬA CHỮA VÀ XÂY DỰNG CẦU ĐƯỜNG SỐ 1
19/09/2022 14:47
Sở Giao thông vận tải Kon Tum announced the results of the bidding package Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A with 2 participating contractors .
22/08/2022 15:11
Sở Giao thông vận tải Kon Tum publishes Tender Notice Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A in the form National shortened competitive bidding .
17/08/2022 09:24
Sở Giao thông vận tải Kon Tum publishes the plan Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A with 1 bidding package .
10/08/2022 08:00
Sở Giao thông vận tải Kon Tum announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN SỬA CHỮA VÀ XÂY DỰNG CẦU ĐƯỜNG SỐ 1
29/07/2022 08:26
Sở Giao thông vận tải Kon Tum announced the results of the bid package Civil Works .
- Winning bidder: Công ty TNHH quản lý sửa chữa và xây dựng giao thông Đắk Bình
29/07/2022 08:10
Sở Giao thông vận tải Kon Tum announced the results of the bid package Package No. 01: Survey consultancy, preparation of feasibility study report .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CẦU ĐƯỜNG KON TUM
29/07/2022 07:58
Sở Giao thông vận tải Kon Tum announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN SỬA CHỮA VÀ XÂY DỰNG CẦU ĐƯỜNG SỐ 1
28/07/2022 16:43
Sở Giao thông vận tải Kon Tum announced the results of the bid package Construct .
- Winning bidder: CÔNG TY CỔ PHẦN TRƯỜNG LONG
28/07/2022 16:14
Sở Giao thông vận tải Kon Tum announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY CỔ PHẦN BẮC NGUYÊN, CÔNG TY TRÁCH NHIỆM HỮU HẠN XÂY DỰNG SỐ 6 KONTUM
28/07/2022 15:47
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A of the investor Sở Giao thông vận tải Kon Tum.
19/09/2022 14:47
The Bid solicitor PMU of investment in transportation construction of Kon Tum province has posted the request Plan to select contractor for the project of repairing foundation, road surface, drainage works, traffic safety section Km30 -Km39+930, resettlement road for Plei Krong hydropower plant of the investor Sở Giao thông vận tải Kon Tum with 2 bidding package.
13/09/2022 15:27
Bid solicitor Sở Giao thông vận tải Kon Tum has posted Tender Notice Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A of the investor Sở Giao thông vận tải Kon Tum with the form National shortened competitive bidding.
17/08/2022 09:24
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the request Package: Dismantling and relocating the temporary bridge over Ya Doy stream at the explanation Km49+069 Provincial road 675A of the investor Sở Giao thông vận tải Kon Tum with 1 bidding package.
10/08/2022 08:00
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Kon Tum.
29/07/2022 08:26
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Kon Tum.
29/07/2022 08:10
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Package No. 01: Survey consultancy, preparation of feasibility study report of the investor Sở Giao thông vận tải Kon Tum.
29/07/2022 07:58
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Kon Tum.
28/07/2022 16:43
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Construct of the investor Sở Giao thông vận tải Kon Tum.
- Winning bidder: CÔNG TY CỔ PHẦN TRƯỜNG LONG
28/07/2022 16:14
The Bid solicitor Sở Giao thông vận tải Kon Tum has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Kon Tum.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN XÂY DỰNG SỐ 6 KONTUM
28/07/2022 15:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Giao thông vận tải Kon Tum has posted 119 of the contractor selection plan, which contains 417 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Giao thông vận tải Kon Tum has posted 106 Tender Notices in 91 bidding packages. Among these, 83 Tender Notices were self-invited, and 23 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông vận tải Kon Tum has posted 140 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 140 package, canceled the bid 0 package (among the bidding packages above).
- There are 63 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Giao thông vận tải Kon Tum has a relationship with 38 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông vận tải Kon Tum has a relationship with 9 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Giao thông vận tải Kon Tum has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects