Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng tỉnh Hòa Bình as follows:
- Has relationships with 2 project owners.
- Has relationships with 5 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 37 contractor selection plans with a total of 87 bidding packages, of which 16 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 33 packages that have not fully posted the contractor selection results. Of these 31 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 100.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 19,734,870,000 VND, of which the total winning bid value is: 19,700,508,000 VND.
- The savings rate is: 0.17%.
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng tỉnh Hòa Bình as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 100.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 19,734,870,000 VND, in which the total winning value is: 19,700,508,000 VND.
- The savings rate is: 0.17%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Xây dựng tỉnh Hòa Bình are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 31 contractor selection plans, of which 31 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Project contractor selection plan: Handling traffic loss points Km0 (Bai Lang junction of NH.6); Repairing road surface, supplementing with drainage grooves with segment Km0+00 - km5+00; Km11+050 -KM20+00/TSA (BL -BC), Hoa Binh province of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
27/06/2025 23:06
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Approving the project contractor selection plan: Executive repair of damaged locations on Truong Son A route (Bai Lang-Bai Chang), Hoa Binh province due to the impact of storm No. 3 (YAGI) of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
16/06/2025 14:19
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Project contractor selection plan: Unexpected repair of damaged locations on Highway 70B, Hoa Binh Province due to the impact of storm No. 3 (YAGI) of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
11/06/2025 16:15
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Project contractor selection plan: irregularly repairing the damaged position on the X2 route, Hoa Binh province due to the impact of storm No. 3 (YAGI) of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
11/06/2025 15:39
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Project contractor selection plan: Surveying a dossier of the announcement of opening, route and installation of local inland waterway signaling systems of Hoa Binh province (branch streams on Hoa Binh Lake) of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
11/06/2025 11:15
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Approving the plan for project contractor selection: Repairing damage to the road surface, water drainage works Km3+930-Km4+600, Provincial Road 440 of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
06/06/2025 08:48
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request The plan for contractor selection, bidding package: Survey consultancy, Economic and technical report on construction investment and bidding packages to supervise the survey work under the replacement project, supplement signs according to QC41/2019 on provincial roads; Reflective paint DT.431; DT.433 of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
29/05/2025 16:42
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request The plan for contractor selection, bidding package: Survey consultancy, construction reporting report on construction investment and bidding package: Supervising the survey work of the work: Expanding and improving the potential position of traffic accidents Km6+850 (P); Km6+900 (t); Km7+600 (t); Km7+680; Km7+900 (t); Km8+500 (t); Km8+750 (P); Km9+030; Km9+600; Km9+840, Provincial Road 444 of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
22/05/2025 20:46
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request The plan for contractor selection, survey consultancy package, Economic and technical report on construction investment and bidding packages to supervise the survey work, under the irregular repair project of damaged locations on route C, Hoa Binh province due to the impact of storm No. 3 (YAGI) of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
14/05/2025 08:35
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Contractor selection plan, survey consultancy package, Economic and technical reports for construction investment and works: TE KM9+873; Smooth bridge Km20+860, DT.439; Tram Bridge Km7+229, Km7+873 bridge, DT.444 and Chi Ne Cau Km0+300, DT.438 of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
12/05/2025 11:18
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng tỉnh Hòa Bình publishes the plan Project contractor selection plan: Handling traffic loss points Km0 (Bai Lang junction of NH.6); Repairing road surface, supplementing with drainage grooves with segment Km0+00 - km5+00; Km11+050 -KM20+00/TSA (BL -BC), Hoa Binh province with 3 bidding package .
27/06/2025 23:06
Sở Xây dựng tỉnh Hòa Bình publishes the plan Approving the project contractor selection plan: Executive repair of damaged locations on Truong Son A route (Bai Lang-Bai Chang), Hoa Binh province due to the impact of storm No. 3 (YAGI) with 3 bidding package .
16/06/2025 14:19
Sở Xây dựng tỉnh Hòa Bình publishes the plan Project contractor selection plan: Unexpected repair of damaged locations on Highway 70B, Hoa Binh Province due to the impact of storm No. 3 (YAGI) with 3 bidding package .
11/06/2025 16:15
Sở Xây dựng tỉnh Hòa Bình publishes the plan Project contractor selection plan: irregularly repairing the damaged position on the X2 route, Hoa Binh province due to the impact of storm No. 3 (YAGI) with 3 bidding package .
11/06/2025 15:39
Sở Xây dựng tỉnh Hòa Bình publishes the plan Project contractor selection plan: Surveying a dossier of the announcement of opening, route and installation of local inland waterway signaling systems of Hoa Binh province (branch streams on Hoa Binh Lake) with 2 bidding package .
11/06/2025 11:15
Sở Xây dựng tỉnh Hòa Bình publishes the plan Approving the plan for project contractor selection: Repairing damage to the road surface, water drainage works Km3+930-Km4+600, Provincial Road 440 with 3 bidding package .
06/06/2025 08:48
Sở Xây dựng tỉnh Hòa Bình publishes the plan The plan for contractor selection, bidding package: Survey consultancy, Economic and technical report on construction investment and bidding packages to supervise the survey work under the replacement project, supplement signs according to QC41/2019 on provincial roads; Reflective paint DT.431; DT.433 with 2 bidding package .
29/05/2025 16:42
Sở Xây dựng tỉnh Hòa Bình publishes the plan The plan for contractor selection, bidding package: Survey consultancy, construction reporting report on construction investment and bidding package: Supervising the survey work of the work: Expanding and improving the potential position of traffic accidents Km6+850 (P); Km6+900 (t); Km7+600 (t); Km7+680; Km7+900 (t); Km8+500 (t); Km8+750 (P); Km9+030; Km9+600; Km9+840, Provincial Road 444 with 2 bidding package .
22/05/2025 20:46
Sở Xây dựng tỉnh Hòa Bình publishes the plan The plan for contractor selection, survey consultancy package, Economic and technical report on construction investment and bidding packages to supervise the survey work, under the irregular repair project of damaged locations on route C, Hoa Binh province due to the impact of storm No. 3 (YAGI) with 2 bidding package .
14/05/2025 08:35
Sở Xây dựng tỉnh Hòa Bình publishes the plan Contractor selection plan, survey consultancy package, Economic and technical reports for construction investment and works: TE KM9+873; Smooth bridge Km20+860, DT.439; Tram Bridge Km7+229, Km7+873 bridge, DT.444 and Chi Ne Cau Km0+300, DT.438 with 2 bidding package .
12/05/2025 11:18
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Project contractor selection plan: Handling traffic loss points Km0 (Bai Lang junction of NH.6); Repairing road surface, supplementing with drainage grooves with segment Km0+00 - km5+00; Km11+050 -KM20+00/TSA (BL -BC), Hoa Binh province of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
27/06/2025 23:06
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Approving the project contractor selection plan: Executive repair of damaged locations on Truong Son A route (Bai Lang-Bai Chang), Hoa Binh province due to the impact of storm No. 3 (YAGI) of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
16/06/2025 14:19
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Project contractor selection plan: Unexpected repair of damaged locations on Highway 70B, Hoa Binh Province due to the impact of storm No. 3 (YAGI) of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
11/06/2025 16:15
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Project contractor selection plan: irregularly repairing the damaged position on the X2 route, Hoa Binh province due to the impact of storm No. 3 (YAGI) of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
11/06/2025 15:39
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Project contractor selection plan: Surveying a dossier of the announcement of opening, route and installation of local inland waterway signaling systems of Hoa Binh province (branch streams on Hoa Binh Lake) of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
11/06/2025 11:15
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Approving the plan for project contractor selection: Repairing damage to the road surface, water drainage works Km3+930-Km4+600, Provincial Road 440 of the investor Sở Xây dựng tỉnh Hòa Bình with 3 bidding package.
06/06/2025 08:48
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request The plan for contractor selection, bidding package: Survey consultancy, Economic and technical report on construction investment and bidding packages to supervise the survey work under the replacement project, supplement signs according to QC41/2019 on provincial roads; Reflective paint DT.431; DT.433 of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
29/05/2025 16:42
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request The plan for contractor selection, bidding package: Survey consultancy, construction reporting report on construction investment and bidding package: Supervising the survey work of the work: Expanding and improving the potential position of traffic accidents Km6+850 (P); Km6+900 (t); Km7+600 (t); Km7+680; Km7+900 (t); Km8+500 (t); Km8+750 (P); Km9+030; Km9+600; Km9+840, Provincial Road 444 of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
22/05/2025 20:46
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request The plan for contractor selection, survey consultancy package, Economic and technical report on construction investment and bidding packages to supervise the survey work, under the irregular repair project of damaged locations on route C, Hoa Binh province due to the impact of storm No. 3 (YAGI) of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
14/05/2025 08:35
The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted the request Contractor selection plan, survey consultancy package, Economic and technical reports for construction investment and works: TE KM9+873; Smooth bridge Km20+860, DT.439; Tram Bridge Km7+229, Km7+873 bridge, DT.444 and Chi Ne Cau Km0+300, DT.438 of the investor Sở Xây dựng tỉnh Hòa Bình with 2 bidding package.
12/05/2025 11:18
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Xây dựng tỉnh Hòa Bình has posted 37 of the contractor selection plan, which contains 87 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has posted 5 Tender Notices in 5 bidding packages. Among these, -1 Tender Notices were self-invited, and 6 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng tỉnh Hòa Bình has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Xây dựng tỉnh Hòa Bình has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects