Data analysis results of DauThau.info software for bid solicitors ThuyLoi University as follows:
- Has relationships with 120 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 195 contractor selection plans with a total of 344 bidding packages, of which 191 prequalification documents have not found the investment project.
- Has invited bids for 191 packages (with 198 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 184 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 51 packages with results that do not have tender notice or prequalification notice.
- There are 110 packages that have not fully posted the contractor selection results. Of these 104 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.54 contractors.
- Breakdown by bidding field: Goods 63.64%, Construction 15.66%, Consultancy 2.02%, Non-consultancy 18.69%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 299,837,015,652 VND, of which the total winning bid value is: 292,015,706,974 VND.
- The savings rate is: 2.61%.
Data analysis results of DauThau.info software for bid solicitors ThuyLoi University as follows:
- Has relationships with 120 contractor.
- The average number of contractors participating in each bidding package is: 1.54 contractors.
- Proportion of bidding fields: Goods 63.64%, Construction 15.66%, Consulting 2.02%, Non-consulting 18.69%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 299,837,015,652 VND, in which the total winning value is: 292,015,706,974 VND.
- The savings rate is: 2.61%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 3 investment and development projects.
- As the owner of 189 Contractor selection plan in which 189 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 130 bidding packages in which 130 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor ThuyLoi University has posted the request Approve the contractor selection plan for procurement estimates: Buy gifts for key officials of the investor ThuyLoi University with 1 bidding package.
24/10/2024 09:35
The Bid solicitor ThuyLoi University has posted the request Approve the list, package price and contractor selection plan for the package of providing equipment, components, materials and internet network installation
on the 2nd floor - Library building of the investor ThuyLoi University with 1 bidding package.
21/10/2024 16:31
The Bid solicitor ThuyLoi University has posted the request Demolish the filter pump station, re-plaster the clean water pump station, repair the floor of the filter tank area; Repair the 1st floor of the A2-A3 bridge house, install waiting pipes for the fountain electrical system of the investor ThuyLoi University with 1 bidding package.
21/10/2024 10:52
The Bid solicitor ThuyLoi University has posted the request Supply and installation of plastic flooring for room 5 of dormitory K1 and plastic steps to the stage of Hall T45 of the investor ThuyLoi University with 1 bidding package.
17/10/2024 16:03
The Bid solicitor ThuyLoi University has posted the request Maintenance and repair of roof and ceiling of hall T45 of the investor ThuyLoi University with 3 bidding package.
15/10/2024 15:53
The Bid solicitor ThuyLoi University has posted the request Pumping 02 septic tanks in house A5 of the investor ThuyLoi University with 1 bidding package.
14/10/2024 09:39
The Bid solicitor ThuyLoi University has posted the request Flooring the gable yard of house B5 and house A3; Paint the bridge connecting A2-A3; Paint the exterior of the first floor behind house A2 of the investor ThuyLoi University with 1 bidding package.
14/10/2024 09:38
The Bid solicitor ThuyLoi University has posted the request Replace roof drainage system B5 of the investor ThuyLoi University with 1 bidding package.
11/10/2024 11:09
The Bid solicitor ThuyLoi University has posted the request Flooring the gable yard of house B5 and house A3; Paint the bridge connecting A2-A3; Paint the exterior of the first floor behind house A2 of the investor ThuyLoi University with 1 bidding package.
10/10/2024 14:46
The Bid solicitor ThuyLoi University has posted the request Supply and installation of stage plastic flooring at hall T45 of the investor ThuyLoi University with 1 bidding package.
10/10/2024 14:24
The data sheet has been partially hidden, to see the full information please Login or Register
ThuyLoi University publishes the plan Approve the contractor selection plan for procurement estimates: Buy gifts for key officials with 1 bidding package .
24/10/2024 09:35
ThuyLoi University publishes the plan Approve the list, package price and contractor selection plan for the package of providing equipment, components, materials and internet network installation
on the 2nd floor - Library building with 1 bidding package .
21/10/2024 16:31
ThuyLoi University publishes the plan Demolish the filter pump station, re-plaster the clean water pump station, repair the floor of the filter tank area; Repair the 1st floor of the A2-A3 bridge house, install waiting pipes for the fountain electrical system with 1 bidding package .
21/10/2024 10:52
ThuyLoi University publishes the plan Supply and installation of plastic flooring for room 5 of dormitory K1 and plastic steps to the stage of Hall T45 with 1 bidding package .
17/10/2024 16:03
ThuyLoi University publishes the plan Maintenance and repair of roof and ceiling of hall T45 with 3 bidding package .
15/10/2024 15:53
ThuyLoi University publishes the plan Pumping 02 septic tanks in house A5 with 1 bidding package .
14/10/2024 09:39
ThuyLoi University publishes the plan Flooring the gable yard of house B5 and house A3; Paint the bridge connecting A2-A3; Paint the exterior of the first floor behind house A2 with 1 bidding package .
14/10/2024 09:38
ThuyLoi University publishes the plan Replace roof drainage system B5 with 1 bidding package .
11/10/2024 11:09
ThuyLoi University publishes the plan Flooring the gable yard of house B5 and house A3; Paint the bridge connecting A2-A3; Paint the exterior of the first floor behind house A2 with 1 bidding package .
10/10/2024 14:46
ThuyLoi University publishes the plan Supply and installation of stage plastic flooring at hall T45 with 1 bidding package .
10/10/2024 14:24
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ThuyLoi University has posted the request Approve the contractor selection plan for procurement estimates: Buy gifts for key officials of the investor ThuyLoi University with 1 bidding package.
24/10/2024 09:35
The Bid solicitor ThuyLoi University has posted the request Approve the list, package price and contractor selection plan for the package of providing equipment, components, materials and internet network installation
on the 2nd floor - Library building of the investor ThuyLoi University with 1 bidding package.
21/10/2024 16:31
The Bid solicitor ThuyLoi University has posted the request Demolish the filter pump station, re-plaster the clean water pump station, repair the floor of the filter tank area; Repair the 1st floor of the A2-A3 bridge house, install waiting pipes for the fountain electrical system of the investor ThuyLoi University with 1 bidding package.
21/10/2024 10:52
The Bid solicitor ThuyLoi University has posted the request Supply and installation of plastic flooring for room 5 of dormitory K1 and plastic steps to the stage of Hall T45 of the investor ThuyLoi University with 1 bidding package.
17/10/2024 16:03
The Bid solicitor ThuyLoi University has posted the request Maintenance and repair of roof and ceiling of hall T45 of the investor ThuyLoi University with 3 bidding package.
15/10/2024 15:53
The Bid solicitor ThuyLoi University has posted the request Pumping 02 septic tanks in house A5 of the investor ThuyLoi University with 1 bidding package.
14/10/2024 09:39
The Bid solicitor ThuyLoi University has posted the request Flooring the gable yard of house B5 and house A3; Paint the bridge connecting A2-A3; Paint the exterior of the first floor behind house A2 of the investor ThuyLoi University with 1 bidding package.
14/10/2024 09:38
The Bid solicitor ThuyLoi University has posted the request Replace roof drainage system B5 of the investor ThuyLoi University with 1 bidding package.
11/10/2024 11:09
The Bid solicitor ThuyLoi University has posted the request Flooring the gable yard of house B5 and house A3; Paint the bridge connecting A2-A3; Paint the exterior of the first floor behind house A2 of the investor ThuyLoi University with 1 bidding package.
10/10/2024 14:46
The Bid solicitor ThuyLoi University has posted the request Supply and installation of stage plastic flooring at hall T45 of the investor ThuyLoi University with 1 bidding package.
10/10/2024 14:24
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ThuyLoi University has posted 195 of the contractor selection plan, which contains 344 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ThuyLoi University has posted 198 Tender Notice in the 191 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ThuyLoi University has posted 184 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 184 package, canceled the bid 0 package (among the bidding packages above).
- There are 51 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ThuyLoi University has a relationship with 120 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ThuyLoi University has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ThuyLoi University is the investor of 130 package, of which 130 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ThuyLoi University is the owner of 189 contractor selection plan. In which, they self-invite 189 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor ThuyLoi University is an investor with 120 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ThuyLoi University is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code