Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất tỉnh Ninh Bình as follows:
- Has relationships with 1 project owners.
- Has relationships with 0 contractor.
- Announced 14 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 31 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 30 packages that have not fully posted the contractor selection results. Of these 28 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm phát triển quỹ đất tỉnh Ninh Bình as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trung tâm phát triển quỹ đất tỉnh Ninh Bình are as follows:
- Is the investor of 14 development investment projects.
- Is the investor of 30 contractor selection plans, of which 3 were self-published, and 27 were published by other entities.
- Is the investor of 18 Tender Notices, of which 0 were self-invited, and 18 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 2 bidding packages with 3 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan Supplement to the bidding plan for the packages of contracts within the project: Construction and reinforcement of the KN11 drainage canal and a section of the KN canal (Kinh Thanh River) in Thanh Nguyen commune, Thanh Liem district. with 4 bidding package .
26/08/2026 18:12
Investor Trung tâm phát triển quỹ đất tỉnh Ninh Bình has posted an investment and development project Investment in the construction of reinforced canals KN11 and a section of the KN drainage canal (Kin Thanh River) in Thanh Nguyen commune, Thanh Liem district..
26/08/2026 17:17
Trung tâm phát triển quỹ đất tỉnh Ninh Bình announced the results of the bid package Package 08: Construction and equipment installation .
- Winning bidder: DINH HUNG DUNG COMPANY LIMITED
26/08/2026 10:48
Trung tâm phát triển quỹ đất tỉnh Ninh Bình announced the results of the bid package Package No. 09: Consulting on construction supervision and equipment installation .
- Winning bidder: Công ty cổ phần tư vấn xây dựng công nghiệp Trần Hoàng
26/08/2026 09:32
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes Tender Notice Package 17: Specialized experiment in the form Open bidding .
26/08/2026 09:08
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes Tender Notice Contract No. 16:
Construction and installation of facilities (including equipment installation). in the form Open bidding .
25/08/2026 17:33
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes Tender Notice Tender package No 18: Construction work (including equipment installation) in the form Open bidding .
24/08/2026 17:04
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan The plan for selecting a contractor includes an amendment to the detailed planning for the Ninh Khanh urban area, specifically for lots HH02 and HH03. with 1 bidding package .
22/08/2026 15:13
Trung tâm phát triển quỹ đất tỉnh Ninh Bình announced the results of the bid package Package 13: Project quality testing .
- Winning bidder: HA NOI CONSULTANCY EXPERIMENTS AND CONSTRUCTION ELECTRICAL-MECHANICAL JOINT STOCK COMPANY
21/08/2026 18:15
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan Amendment to the Procurement Plan for Contract No. 16 under the project: Investment in Technical Infrastructure for Land Use Auction Area at Tan Thanh Town (Lot HH16 according to Thanh Liem District's planning), Thanh Liem District. with 1 bidding package .
20/08/2026 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan Adjustment of the contractor selection plan for investment in construction of the eastern vertical axis of Cau Gie - Ninh Binh expressway (section from Chau river to the end of Phu Ly city) with 16 bidding package .
11/04/2026 16:56
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan Plan to select contractors for investment in construction of the eastern longitudinal axis of Cau Gie - Ninh Binh expressway (section from Chau river to the end of Phu Ly city) with 15 bidding package .
11/04/2026 16:32
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan Contractor selection plan Project to invest in building overpasses on local roads across T4 road (at the intersection of QL21, DT.495, DT.499B, DH.13), Thanh Liem district, Ha Nam province. with 15 bidding package .
11/04/2026 13:34
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan Supplement to the bidding plan for the packages of contracts within the project: Construction and reinforcement of the KN11 drainage canal and a section of the KN canal (Kinh Thanh River) in Thanh Nguyen commune, Thanh Liem district. with 4 bidding package .
26/08/2026 18:12
Investor Trung tâm phát triển quỹ đất tỉnh Ninh Bình has posted an investment and development project Investment in the construction of reinforced canals KN11 and a section of the KN drainage canal (Kin Thanh River) in Thanh Nguyen commune, Thanh Liem district..
26/08/2026 17:17
Trung tâm phát triển quỹ đất tỉnh Ninh Bình announced the results of the bid package Package 08: Construction and equipment installation .
- Winning bidder: DINH HUNG DUNG COMPANY LIMITED
26/08/2026 10:48
Trung tâm phát triển quỹ đất tỉnh Ninh Bình announced the results of the bid package Package No. 09: Consulting on construction supervision and equipment installation .
- Winning bidder: Công ty cổ phần tư vấn xây dựng công nghiệp Trần Hoàng
26/08/2026 09:32
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes Tender Notice Package 17: Specialized experiment in the form Open bidding .
26/08/2026 09:08
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes Tender Notice Contract No. 16:
Construction and installation of facilities (including equipment installation). in the form Open bidding .
25/08/2026 17:33
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes Tender Notice Tender package No 18: Construction work (including equipment installation) in the form Open bidding .
24/08/2026 17:04
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan The plan for selecting a contractor includes an amendment to the detailed planning for the Ninh Khanh urban area, specifically for lots HH02 and HH03. with 1 bidding package .
22/08/2026 15:13
Trung tâm phát triển quỹ đất tỉnh Ninh Bình announced the results of the bid package Package 13: Project quality testing .
- Winning bidder: HA NOI CONSULTANCY EXPERIMENTS AND CONSTRUCTION ELECTRICAL-MECHANICAL JOINT STOCK COMPANY
21/08/2026 18:15
Trung tâm phát triển quỹ đất tỉnh Ninh Bình publishes the plan Amendment to the Procurement Plan for Contract No. 16 under the project: Investment in Technical Infrastructure for Land Use Auction Area at Tan Thanh Town (Lot HH16 according to Thanh Liem District's planning), Thanh Liem District. with 1 bidding package .
20/08/2026 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm phát triển quỹ đất tỉnh Ninh Bình has posted 3 of the contractor selection plan, which contains 31 of the bidding package. See full list here
Summary: The procuring entity Trung tâm phát triển quỹ đất tỉnh Ninh Bình has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects