Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON 12 as follows:
- Has relationships with 1 project owners.
- Has relationships with 13 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 8 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 447,131,615 VND, of which the total winning bid value is: 447,131,615 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON 12 as follows:
- Has relationships with 13 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 447,131,615 VND, in which the total winning value is: 447,131,615 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON 12 are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 4 contractor selection plans, of which 2 were self-published, and 2 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON 12 announced the results of the bid package Package 03: Construction cost .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NHẬT MINH LÂM ĐỒNG
17/12/2025 19:26
TRƯỜNG MẦM NON 12 announced the results of the bid package Package 02: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGUYỄN PHONG NĐ
17/12/2025 19:24
TRƯỜNG MẦM NON 12 announced the results of the bid package Tender package No 01: Project management consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG ĐĂNG KHOA GROUP
17/12/2025 19:22
TRƯỜNG MẦM NON 12 publishes the plan Repair and renovate the toilet area, septic tank and water ditch behind the 6-classroom block of Kindergarten 12 with 3 bidding package .
17/12/2025 19:18
TRƯỜNG MẦM NON 12 announced the results of the bid package Ferment yogurt, flan cream .
17/09/2025 09:34
TRƯỜNG MẦM NON 12 announced the results of the bid package Ellac Grow milk powder .
17/09/2025 09:33
TRƯỜNG MẦM NON 12 announced the results of the bid package Wet towel .
- Winning bidder: Công ty TNHH Tân Gia Nguyên
17/09/2025 09:31
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON 12 publishes the plan Kindergarten 12; Category: Repairing teacher's garage with 5 bidding package .
12/12/2024 19:58
TRƯỜNG MẦM NON 12 announced the results of the bid package Tender package No 03: Construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NHẬT MINH LÂM ĐỒNG
29/10/2024 16:34
TRƯỜNG MẦM NON 12 announced the results of the bid package Package No. 01: Cost of Project Management Consulting .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGUYỄN PHONG NĐ
29/10/2024 16:32
TRƯỜNG MẦM NON 12 announced the results of the bid package Package 02: Cost of construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG ĐĂNG KHOA GROUP
29/10/2024 16:30
TRƯỜNG MẦM NON 12 publishes the plan Kindergarten 12; Category: Making a stage canopy with 3 bidding package .
23/10/2024 19:39
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON 12 announced the results of the bid package Package 03: Construction cost .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NHẬT MINH LÂM ĐỒNG
17/12/2025 19:26
TRƯỜNG MẦM NON 12 announced the results of the bid package Package 02: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGUYỄN PHONG NĐ
17/12/2025 19:24
TRƯỜNG MẦM NON 12 announced the results of the bid package Tender package No 01: Project management consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG ĐĂNG KHOA GROUP
17/12/2025 19:22
TRƯỜNG MẦM NON 12 publishes the plan Repair and renovate the toilet area, septic tank and water ditch behind the 6-classroom block of Kindergarten 12 with 3 bidding package .
17/12/2025 19:18
TRƯỜNG MẦM NON 12 announced the results of the bid package Ferment yogurt, flan cream .
17/09/2025 09:34
TRƯỜNG MẦM NON 12 announced the results of the bid package Ellac Grow milk powder .
17/09/2025 09:33
TRƯỜNG MẦM NON 12 announced the results of the bid package Wet towel .
- Winning bidder: Công ty TNHH Tân Gia Nguyên
17/09/2025 09:31
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON 12 has posted 2 of the contractor selection plan, which contains 8 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG MẦM NON 12 has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON 12 has a relationship with 13 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON 12 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects