Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON AN NHƠN as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 9 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 263,790,394 VND, of which the total winning bid value is: 263,790,394 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON AN NHƠN as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 263,790,394 VND, in which the total winning value is: 263,790,394 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON AN NHƠN are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 6 contractor selection plans, of which 3 were self-published, and 3 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON AN NHƠN publishes the plan Procurement of equipment for teaching activities at An Nhon Kindergarten in 2026 with 1 bidding package .
21/08/2026 10:22
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Organize staff, teachers and employees to visit Summer 2026 in Vung Tau .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ DU LỊCH VẬN TẢI LỮ HÀNH QUỐC TẾ
19/05/2026 09:25
TRƯỜNG MẦM NON AN NHƠN publishes the plan Organize staff, teachers and employees to visit Summer 2026 in Vung Tau with 1 bidding package .
19/05/2026 09:20
TRƯỜNG MẦM NON AN NHƠN publishes the plan "Providing cooking foods (vegetables, tubers, fruits, meat, fish, seafood eggs of all kinds); yogurt, Vinamilk yogurt ice cream for children at school in the 2025-2026 school year" with 1 bidding package .
09/10/2025 14:36
The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted the results of the bidding package Organize for staff-GV-NV to visit the summer of 2025 in Quy Nhon-Phu Yen of the investor TRƯỜNG MẦM NON AN NHƠN.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ DU LỊCH VẬN TẢI LỮ HÀNH QUỐC TẾ
23/05/2025 12:06
The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted the request Organize for staff-GV-NV to visit the summer of 2025 in Quy Nhon-Phu Yen of the investor TRƯỜNG MẦM NON AN NHƠN with 1 bidding package.
23/05/2025 12:01
The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted the results of the bidding package Supervision of construction work of the investor TRƯỜNG MẦM NON AN NHƠN.
- Winning bidder: TPCO CONSULTANCY CONSTRUCTION COMPANY LIMITED
20/06/2024 15:28
The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted the results of the bidding package Construction insurance of the investor TRƯỜNG MẦM NON AN NHƠN.
- Winning bidder: AAA INSURANCE CORPORATION
20/06/2024 15:19
The Bid solicitor MINH PHAM COMPANY LIMITED has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON AN NHƠN.
- Winning bidder: KIEN TAO VIET COMPANY LIMITED
20/06/2024 15:10
Bid solicitor MINH PHAM COMPANY LIMITED has posted Tender Notice Civil Works of the investor TRƯỜNG MẦM NON AN NHƠN with the form Open bidding.
30/05/2024 06:11
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Organize for staff-GV-NV to visit the summer of 2025 in Quy Nhon-Phu Yen .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ DU LỊCH VẬN TẢI LỮ HÀNH QUỐC TẾ
23/05/2025 12:06
TRƯỜNG MẦM NON AN NHƠN publishes the plan Organize for staff-GV-NV to visit the summer of 2025 in Quy Nhon-Phu Yen with 1 bidding package .
23/05/2025 12:01
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Supervision of construction work .
- Winning bidder: TPCO CONSULTANCY CONSTRUCTION COMPANY LIMITED
20/06/2024 15:28
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Construction insurance .
- Winning bidder: AAA INSURANCE CORPORATION
20/06/2024 15:19
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Evaluate bidding documents; Evaluate the results of selecting construction contractors .
- Winning bidder: ATUS ANH TU COMPANY LIMITED
22/05/2024 15:55
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Consultancy on preparation of bidding documents, evaluation of construction bids .
- Winning bidder: MINH PHAM COMPANY LIMITED
22/05/2024 15:53
TRƯỜNG MẦM NON AN NHƠN publishes the plan Project LCNT plan: Repair and renovation of An Nhon Kindergarten with 5 bidding package .
22/05/2024 15:52
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Consultancy and verification of construction drawing design and total cost estimate .
- Winning bidder: TPCO CONSULTANCY CONSTRUCTION COMPANY LIMITED
01/04/2024 15:43
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Expenses for making economic and technical reports for construction works .
- Winning bidder: DUC THINH CONSTRUCTION CORPORATION
06/03/2024 14:29
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Project management consultancy .
- Winning bidder: VINH KHUE CONSULTANCY CONSTRUCTION COMPANY LIMITED
06/03/2024 14:28
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON AN NHƠN publishes the plan Procurement of equipment for teaching activities at An Nhon Kindergarten in 2026 with 1 bidding package .
21/08/2026 10:22
TRƯỜNG MẦM NON AN NHƠN announced the results of the bid package Organize staff, teachers and employees to visit Summer 2026 in Vung Tau .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ DU LỊCH VẬN TẢI LỮ HÀNH QUỐC TẾ
19/05/2026 09:25
TRƯỜNG MẦM NON AN NHƠN publishes the plan Organize staff, teachers and employees to visit Summer 2026 in Vung Tau with 1 bidding package .
19/05/2026 09:20
TRƯỜNG MẦM NON AN NHƠN publishes the plan "Providing cooking foods (vegetables, tubers, fruits, meat, fish, seafood eggs of all kinds); yogurt, Vinamilk yogurt ice cream for children at school in the 2025-2026 school year" with 1 bidding package .
09/10/2025 14:36
The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted the results of the bidding package Organize for staff-GV-NV to visit the summer of 2025 in Quy Nhon-Phu Yen of the investor TRƯỜNG MẦM NON AN NHƠN.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ DU LỊCH VẬN TẢI LỮ HÀNH QUỐC TẾ
23/05/2025 12:06
The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted the request Organize for staff-GV-NV to visit the summer of 2025 in Quy Nhon-Phu Yen of the investor TRƯỜNG MẦM NON AN NHƠN with 1 bidding package.
23/05/2025 12:01
The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted the results of the bidding package Supervision of construction work of the investor TRƯỜNG MẦM NON AN NHƠN.
- Winning bidder: TPCO CONSULTANCY CONSTRUCTION COMPANY LIMITED
20/06/2024 15:28
The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted the results of the bidding package Construction insurance of the investor TRƯỜNG MẦM NON AN NHƠN.
- Winning bidder: AAA INSURANCE CORPORATION
20/06/2024 15:19
The Bid solicitor MINH PHAM COMPANY LIMITED has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON AN NHƠN.
- Winning bidder: KIEN TAO VIET COMPANY LIMITED
20/06/2024 15:10
Bid solicitor MINH PHAM COMPANY LIMITED has posted Tender Notice Civil Works of the investor TRƯỜNG MẦM NON AN NHƠN with the form Open bidding.
30/05/2024 06:11
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON AN NHƠN has posted 3 of the contractor selection plan, which contains 9 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON AN NHƠN has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON AN NHƠN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects