Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Bình Đức as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Bình Đức as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm non Bình Đức are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 5 contractor selection plans, of which 0 were self-published, and 5 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Mầm non Bình Đức announced the results of the bid package Package No. 03: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG QHT
19/08/2026 16:01
Trường Mầm non Bình Đức announced the results of the bid package Tender package No 02: Construction work .
- Winning bidder: Công ty TNHH Xây dựng Hoàng Nam CĐ
19/08/2026 15:56
Trường Mầm non Bình Đức announced the results of the bid package Tender package No 01: Project management consulting .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ THƯƠNG MẠI XÂY DỰNG TC PHƯƠNG ĐÔNG
19/08/2026 15:51
Trường Mầm non Bình Đức publishes the plan Project contractor selection plan: Roof for Bình Đức Kindergarten with 3 bidding package .
19/08/2026 15:42
Trường Mầm non Bình Đức announced the results of the bid package Package No. 02: Consulting on estimation, construction design .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG ĐAN NGUYÊN
19/08/2026 14:40
Investor Trường Mầm non Bình Đức has posted an investment and development project Roof for Bình Đức Kindergarten.
19/08/2026 14:14
Trường Mầm non Bình Đức announced the results of the bid package Consultancy for design verification and estimation .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TÀI PHÁT
29/07/2026 15:18
Investor Trường Mầm non Bình Đức has posted an investment and development project Binh Duc Kindergarten; Category: Construction of a play area with sand and water, vegetable garden, fairy garden, animal statues.....
29/07/2026 15:15
Trường Mầm non Bình Đức announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: CÔNG TY TNHH TM DV XÂY DỰNG ĐẠI THỐNG
29/07/2026 15:13
Trường Mầm non Bình Đức announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI KỸ THUẬT QUỐC TIẾN
29/07/2026 15:12
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects