Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Lê Lợi as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 7 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 381,133,000 VND, of which the total winning bid value is: 381,133,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Lê Lợi as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 381,133,000 VND, in which the total winning value is: 381,133,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm non Lê Lợi are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 6 contractor selection plans, of which 3 were self-published, and 3 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Mầm non Lê Lợi publishes the plan Contractor selection plan for Procurement Estimate: Procurement of food, raw materials, and fuel inputs to provide meals for boarding children at Le Loi Kindergarten July and August 2026 with 2 bidding package .
29/06/2026 14:42
Trường Mầm non Lê Lợi publishes the plan Contractor selection plan for Procurement Estimate: Procurement of food, raw materials, and fuel inputs to provide meals for boarding children at Le Loi Kindergarten July and August 2026 with 2 bidding package .
29/06/2026 09:13
Trường Mầm non Lê Lợi announced the results of the bid package Package 02: Procurement of input fuel to provide meals for students in the school year 2025-2026 of Le Loi Kindergarten .
- Winning bidder: Công ty TNHH MTV PETROLIMEX Bắc Ninh
09/10/2025 15:06
Trường Mầm non Lê Lợi announced the results of the bid package Package 01: Procurement of food and input materials to provide meals for students in the school year 2025-2026 of Le Loi Kindergarten .
- Winning bidder: Liên danh cung cấp thực phẩm trường Mầm non Lê Lợi
09/10/2025 15:04
Trường Mầm non Lê Lợi publishes the plan Contractor selection plan for shopping estimates: Food procurement, raw materials, and input fuel to provide meals for semi-boarding students at Le Loi Kindergarten in the school year 2025-2026 with 2 bidding package .
05/10/2025 17:51
The Bid solicitor CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA has posted the results of the bidding package Civil Works of the investor Trường Mầm non Lê Lợi.
- Winning bidder: MANH HUNG CUONG CONSTRUCTION AND TRADING COMPANY LIMITED
14/08/2025 10:55
Bid solicitor CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA has posted Tender Notice Civil Works of the investor Trường Mầm non Lê Lợi with the form Open bidding.
02/07/2025 18:27
The Bid solicitor Trường Mầm non Lê Lợi has posted the results of the bidding package Construction insurance of the investor Trường Mầm non Lê Lợi.
- Winning bidder: BaoViet Insurance Corporation
26/06/2025 17:02
The Bid solicitor Trường Mầm non Lê Lợi has posted the results of the bidding package Construction supervision consultant of the investor Trường Mầm non Lê Lợi.
- Winning bidder: CÔNG TY TNHH CƠ ĐIỆN VÀ PCCC NAM SƠN
26/06/2025 17:00
Bid solicitor CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA has posted Tender Notice Civil Works of the investor Trường Mầm non Lê Lợi with the form Open bidding.
26/06/2025 14:41
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non Lê Lợi announced the results of the bid package Construction insurance .
- Winning bidder: BaoViet Insurance Corporation
26/06/2025 17:02
Trường Mầm non Lê Lợi announced the results of the bid package Construction supervision consultant .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG HƯƠNG GIÁN 68, CÔNG TY TNHH CƠ ĐIỆN VÀ PCCC NAM SƠN
26/06/2025 17:00
Trường Mầm non Lê Lợi announced the results of the bid package Consulting on evaluation of Bidding Documents, HSYC, results of construction and installation .
- Winning bidder: Công ty TNHH tư vấn và xây dựng Hùng Anh BG
19/06/2025 21:27
Trường Mầm non Lê Lợi announced the results of the bid package Consulting on setting up bidding documents, evaluating bids for construction and installation bidding packages .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA
19/06/2025 10:45
Trường Mầm non Lê Lợi publishes the plan Project contractor selection plan: renovating and repairing facilities of Le Loi Kindergarten, Bac Giang City with 5 bidding package .
19/06/2025 10:42
Trường Mầm non Lê Lợi announced the results of the bid package Package 2: Consulting on verification of KT-KT report .
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC VÀ XÂY DỰNG THÀNH ĐẠT
13/06/2025 14:28
Trường Mầm non Lê Lợi publishes the plan Supplementing the plan to select contractors of construction consultancy packages: renovating and repairing facilities of Le Loi Kindergarten, Bac Giang City with 1 bidding package .
09/06/2025 09:53
Trường Mầm non Lê Lợi announced the results of the bid package Bidding package No. 01: Consulting on preparing construction investment KT-KT reports .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ XÂY DỰNG ATK
23/05/2025 16:37
Trường Mầm non Lê Lợi publishes the plan Plan to select contractor for construction consultancy package: Renovating and repairing facilities of Le Loi Kindergarten, Bac Giang City with 1 bidding package .
23/05/2025 16:35
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non Lê Lợi publishes the plan Contractor selection plan for Procurement Estimate: Procurement of food, raw materials, and fuel inputs to provide meals for boarding children at Le Loi Kindergarten July and August 2026 with 2 bidding package .
29/06/2026 14:42
Trường Mầm non Lê Lợi publishes the plan Contractor selection plan for Procurement Estimate: Procurement of food, raw materials, and fuel inputs to provide meals for boarding children at Le Loi Kindergarten July and August 2026 with 2 bidding package .
29/06/2026 09:13
Trường Mầm non Lê Lợi announced the results of the bid package Package 02: Procurement of input fuel to provide meals for students in the school year 2025-2026 of Le Loi Kindergarten .
- Winning bidder: Công ty TNHH MTV PETROLIMEX Bắc Ninh
09/10/2025 15:06
Trường Mầm non Lê Lợi announced the results of the bid package Package 01: Procurement of food and input materials to provide meals for students in the school year 2025-2026 of Le Loi Kindergarten .
- Winning bidder: Liên danh cung cấp thực phẩm trường Mầm non Lê Lợi
09/10/2025 15:04
Trường Mầm non Lê Lợi publishes the plan Contractor selection plan for shopping estimates: Food procurement, raw materials, and input fuel to provide meals for semi-boarding students at Le Loi Kindergarten in the school year 2025-2026 with 2 bidding package .
05/10/2025 17:51
The Bid solicitor CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA has posted the results of the bidding package Civil Works of the investor Trường Mầm non Lê Lợi.
- Winning bidder: MANH HUNG CUONG CONSTRUCTION AND TRADING COMPANY LIMITED
14/08/2025 10:55
Bid solicitor CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA has posted Tender Notice Civil Works of the investor Trường Mầm non Lê Lợi with the form Open bidding.
02/07/2025 18:27
The Bid solicitor Trường Mầm non Lê Lợi has posted the results of the bidding package Construction insurance of the investor Trường Mầm non Lê Lợi.
- Winning bidder: BaoViet Insurance Corporation
26/06/2025 17:02
The Bid solicitor Trường Mầm non Lê Lợi has posted the results of the bidding package Construction supervision consultant of the investor Trường Mầm non Lê Lợi.
- Winning bidder: CÔNG TY TNHH CƠ ĐIỆN VÀ PCCC NAM SƠN
26/06/2025 17:00
Bid solicitor CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA has posted Tender Notice Civil Works of the investor Trường Mầm non Lê Lợi with the form Open bidding.
26/06/2025 14:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm non Lê Lợi has posted 3 of the contractor selection plan, which contains 7 of the bidding package. See full list here
Summary: The Bid solicitor Trường Mầm non Lê Lợi has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Mầm non Lê Lợi has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Mầm non Lê Lợi has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects