Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON TÂN PHONG 2 as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 10 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 194,562,338 VND, of which the total winning bid value is: 194,562,338 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON TÂN PHONG 2 as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 194,562,338 VND, in which the total winning value is: 194,562,338 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON TÂN PHONG 2 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 11 contractor selection plans, of which 7 were self-published, and 4 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON TÂN PHONG 2 announced the results of the bid package Organize a summer travel tour program in 2026 for officials - teachers - staff .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ DU LỊCH PHÚC LỢI VIỆT
20/05/2026 15:38
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Organize a summer travel tour program in 2026 for officials - teachers - staff with 1 bidding package .
14/05/2026 16:07
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan The plan to select contractors to supply goods- semi-boarding equipment- supply of food, raw materials, fuel, pure drinking water input to perform semi-boarding cooking for students of Tan Phong 2 Kindergarten 2025-2026 with 1 bidding package .
06/10/2025 10:00
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Provide food, ingredients, fuel, pure water input to perform semi -boarding cooking for students with 1 bidding package .
19/09/2025 20:16
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Provide food, ingredients, fuel, pure water input to perform semi -boarding cooking for students with 1 bidding package .
14/09/2025 14:10
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG HOÀNG PHÚC THÀNH has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON TÂN PHONG 2.
- Winning bidder: CONTRUCTION AND TRADING COOPERATIVE OF DISTRICT 7, HOCHIMINH CITY
24/09/2024 16:44
The Bid solicitor TRƯỜNG MẦM NON TÂN PHONG 2 has posted the results of the bidding package Construction supervision of the investor TRƯỜNG MẦM NON TÂN PHONG 2.
- Winning bidder: HUY KHOI CONSTRUCTION JOINT STOCK COMPANY
24/09/2024 15:13
Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG HOÀNG PHÚC THÀNH has posted Tender Notice Civil Works of the investor TRƯỜNG MẦM NON TÂN PHONG 2 with the form Competitive Offer.
28/08/2024 00:29
The Bid solicitor TRƯỜNG MẦM NON TÂN PHONG 2 has posted the results of the bidding package Appraisal of HSYC and results of contractor selection for construction packages of the investor TRƯỜNG MẦM NON TÂN PHONG 2.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI DỊCH VỤ THIÊN LỘC GIA
26/08/2024 17:28
The Bid solicitor TRƯỜNG MẦM NON TÂN PHONG 2 has posted the results of the bidding package Prepare Bidding Documents, evaluate Proposals for construction bidding packages of the investor TRƯỜNG MẦM NON TÂN PHONG 2.
15/08/2024 15:50
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON TÂN PHONG 2 announced the results of the bid package Construction supervision .
- Winning bidder: HUY KHOI CONSTRUCTION JOINT STOCK COMPANY
24/09/2024 15:13
TRƯỜNG MẦM NON TÂN PHONG 2 announced the results of the bid package Appraisal of HSYC and results of contractor selection for construction packages .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI DỊCH VỤ THIÊN LỘC GIA
26/08/2024 17:28
TRƯỜNG MẦM NON TÂN PHONG 2 announced the results of the bid package Prepare Bidding Documents, evaluate Proposals for construction bidding packages .
- Winning bidder:
15/08/2024 15:50
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Plan for selecting contractors for the repair of Tan Phong 2 Kindergarten (Project implementation phase) with 5 bidding package .
15/08/2024 15:43
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Plan for selecting contractors for the repair of Tan Phong 2 Kindergarten (Project implementation phase) with 5 bidding package .
15/08/2024 15:36
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Repair Tan Phong 2 Kindergarten with 5 bidding package .
15/08/2024 15:34
TRƯỜNG MẦM NON TÂN PHONG 2 announced the results of the bid package Verification of construction drawing design and cost estimate .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ KIẾN TRÚC VÀ XÂY DỰNG NGHI HÂN
09/07/2024 09:27
TRƯỜNG MẦM NON TÂN PHONG 2 announced the results of the bid package Design construction drawings and cost estimates .
- Winning bidder: TRUNG MY CONSTRUCTION & INVESTMENT CONSULTING CO., LTD
05/07/2024 14:29
TRƯỜNG MẦM NON TÂN PHONG 2 announced the results of the bid package Project management consultancy .
- Winning bidder: Ban Quản lý dự án đầu tư xây dựng khu vực quận 7
03/07/2024 15:07
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Plan for selecting contractors for the repair of Tan Phong 2 Kindergarten (Project preparation phase) with 3 bidding package .
25/06/2024 15:00
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON TÂN PHONG 2 announced the results of the bid package Organize a summer travel tour program in 2026 for officials - teachers - staff .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ DU LỊCH PHÚC LỢI VIỆT
20/05/2026 15:38
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Organize a summer travel tour program in 2026 for officials - teachers - staff with 1 bidding package .
14/05/2026 16:07
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan The plan to select contractors to supply goods- semi-boarding equipment- supply of food, raw materials, fuel, pure drinking water input to perform semi-boarding cooking for students of Tan Phong 2 Kindergarten 2025-2026 with 1 bidding package .
06/10/2025 10:00
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Provide food, ingredients, fuel, pure water input to perform semi -boarding cooking for students with 1 bidding package .
19/09/2025 20:16
TRƯỜNG MẦM NON TÂN PHONG 2 publishes the plan Provide food, ingredients, fuel, pure water input to perform semi -boarding cooking for students with 1 bidding package .
14/09/2025 14:10
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG HOÀNG PHÚC THÀNH has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON TÂN PHONG 2.
- Winning bidder: CONTRUCTION AND TRADING COOPERATIVE OF DISTRICT 7, HOCHIMINH CITY
24/09/2024 16:44
The Bid solicitor TRƯỜNG MẦM NON TÂN PHONG 2 has posted the results of the bidding package Construction supervision of the investor TRƯỜNG MẦM NON TÂN PHONG 2.
- Winning bidder: HUY KHOI CONSTRUCTION JOINT STOCK COMPANY
24/09/2024 15:13
Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG HOÀNG PHÚC THÀNH has posted Tender Notice Civil Works of the investor TRƯỜNG MẦM NON TÂN PHONG 2 with the form Competitive Offer.
28/08/2024 00:29
The Bid solicitor TRƯỜNG MẦM NON TÂN PHONG 2 has posted the results of the bidding package Appraisal of HSYC and results of contractor selection for construction packages of the investor TRƯỜNG MẦM NON TÂN PHONG 2.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI DỊCH VỤ THIÊN LỘC GIA
26/08/2024 17:28
The Bid solicitor TRƯỜNG MẦM NON TÂN PHONG 2 has posted the results of the bidding package Prepare Bidding Documents, evaluate Proposals for construction bidding packages of the investor TRƯỜNG MẦM NON TÂN PHONG 2.
15/08/2024 15:50
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON TÂN PHONG 2 has posted 8 of the contractor selection plan, which contains 10 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON TÂN PHONG 2 has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON TÂN PHONG 2 has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON TÂN PHONG 2 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects