Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG PTTH HIỆP ĐỨC as follows:
- Has relationships with 1 project owners.
- Has relationships with 0 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 2 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG PTTH HIỆP ĐỨC as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG PTTH HIỆP ĐỨC are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 7 contractor selection plans, of which 2 were self-published, and 5 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Construction investment project management consulting .
- Winning bidder: IHI CONSTRUCTION JOIN STOCK COMPANY
26/08/2026 13:50
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Consultancy on verification of economic and technical reports .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG HẠ TẦNG TRUNG VIỆT
27/07/2026 15:47
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN XÂY DỰNG CHÂU GIA
25/07/2026 08:40
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Purchase minimum teaching equipment in 2026 with 1 bidding package .
22/07/2026 15:42
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Approve the contractor selection plan (phase 1)
Mission: Renovate and repair Hiep Duc High School with 3 bidding package .
22/07/2026 14:15
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Purchase minimum teaching equipment in 2026 .
- Winning bidder: CENPOWER JOINSTOCK CO,
30/05/2026 09:07
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Purchase minimum teaching equipment in 2026 with 1 bidding package .
26/05/2026 14:57
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Purchase minimum teaching equipment in 2026 with 1 bidding package .
22/05/2026 09:38
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Procurement of equipment and tables and chairs for teaching in 2025 .
- Winning bidder: LONG PHAT COMPUTER AND ELECTRONIC CO., LTD
08/12/2025 15:14
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Procurement of teaching equipment, tables and chairs in 2025 with 1 bidding package .
01/12/2025 14:39
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Procurement of equipment for teaching with 2 bidding package .
28/11/2024 09:33
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Procurement of equipment for teaching with 1 bidding package .
08/11/2024 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Construction investment project management consulting .
- Winning bidder: IHI CONSTRUCTION JOIN STOCK COMPANY
26/08/2026 13:50
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Consultancy on verification of economic and technical reports .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG HẠ TẦNG TRUNG VIỆT
27/07/2026 15:47
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN XÂY DỰNG CHÂU GIA
25/07/2026 08:40
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Purchase minimum teaching equipment in 2026 with 1 bidding package .
22/07/2026 15:42
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Approve the contractor selection plan (phase 1)
Mission: Renovate and repair Hiep Duc High School with 3 bidding package .
22/07/2026 14:15
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Purchase minimum teaching equipment in 2026 .
- Winning bidder: CENPOWER JOINSTOCK CO,
30/05/2026 09:07
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Purchase minimum teaching equipment in 2026 with 1 bidding package .
26/05/2026 14:57
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Purchase minimum teaching equipment in 2026 with 1 bidding package .
22/05/2026 09:38
TRƯỜNG PTTH HIỆP ĐỨC announced the results of the bid package Procurement of equipment and tables and chairs for teaching in 2025 .
- Winning bidder: LONG PHAT COMPUTER AND ELECTRONIC CO., LTD
08/12/2025 15:14
TRƯỜNG PTTH HIỆP ĐỨC publishes the plan Procurement of teaching equipment, tables and chairs in 2025 with 1 bidding package .
01/12/2025 14:39
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG PTTH HIỆP ĐỨC has posted 2 of the contractor selection plan, which contains 2 of the bidding package. See full list here
Summary: The procuring entity TRƯỜNG PTTH HIỆP ĐỨC has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects