Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường THCS Lê Quý Đôn as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 13,432,000 VND, of which the total winning bid value is: 13,400,000 VND.
- The savings rate is: 0.24%.
Data analysis results of DauThau.info software for bid solicitors Trường THCS Lê Quý Đôn as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 13,432,000 VND, in which the total winning value is: 13,400,000 VND.
- The savings rate is: 0.24%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THCS Lê Quý Đôn are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 6 contractor selection plans, of which 0 were self-published, and 6 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường THCS Lê Quý Đôn announced the results of the bid package Bidding package No. 1: Procurement of property and equipment .
- Winning bidder: BIEN HUE FURNITURE COMPANY LIMITED
11/08/2026 18:12
Trường THCS Lê Quý Đôn announced the results of the bid package Package 2: Project management consulting .
- Winning bidder: Ban quản lý dự án xây dựng Bắc Giang
11/08/2026 16:53
Trường THCS Lê Quý Đôn publishes the plan Purchasing school supplies and equipment for Le Quy Don Primary School with 2 bidding package .
10/08/2026 17:48
Trường THCS Lê Quý Đôn announced the results of the bid package Package No. 3: Construction works .
- Winning bidder: MANH HUNG CUONG CONSTRUCTION AND TRADING COMPANY LIMITED
03/08/2026 16:50
Trường THCS Lê Quý Đôn announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA
03/08/2026 15:10
Trường THCS Lê Quý Đôn publishes the plan Renovating and repairing Le Quy Don Secondary School with 2 bidding package .
03/08/2026 11:43
Investor Trường THCS Lê Quý Đôn has posted an investment and development project Renovating and repairing Le Quy Don Secondary School.
30/07/2026 11:11
Trường THCS Lê Quý Đôn announced the results of the bid package Package 2: Project management consulting .
- Winning bidder: Ban quản lý dự án xây dựng Bắc Giang
02/07/2026 22:36
Trường THCS Lê Quý Đôn publishes the plan Supplementing the contractor selection plan for the package: Renovating and repairing Le Quy Don Secondary School with 1 bidding package .
02/07/2026 22:31
Trường THCS Lê Quý Đôn announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC VÀ XÂY DỰNG THÀNH ĐẠT
29/06/2026 22:25
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THCS Lê Quý Đôn announced the results of the bid package Consultancy on appraisal of bidding documents, results of construction and installation LCNT .
- Winning bidder: BAO ANH TRADING AND CONSULTING CONSTRUCTION LIMITED COMPANY
09/05/2023 16:13
Trường THCS Lê Quý Đôn announced the results of the bid package Consulting on setting up bidding documents, evaluating bids for construction and installation bidding packages .
- Winning bidder: Ban Quản lý dự án đầu tư xây dựng thành phố Bắc Giang
09/05/2023 16:07
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THCS Lê Quý Đôn announced the results of the bid package Bidding package No. 1: Procurement of property and equipment .
- Winning bidder: BIEN HUE FURNITURE COMPANY LIMITED
11/08/2026 18:12
Trường THCS Lê Quý Đôn announced the results of the bid package Package 2: Project management consulting .
- Winning bidder: Ban quản lý dự án xây dựng Bắc Giang
11/08/2026 16:53
Trường THCS Lê Quý Đôn publishes the plan Purchasing school supplies and equipment for Le Quy Don Primary School with 2 bidding package .
10/08/2026 17:48
Trường THCS Lê Quý Đôn announced the results of the bid package Package No. 3: Construction works .
- Winning bidder: MANH HUNG CUONG CONSTRUCTION AND TRADING COMPANY LIMITED
03/08/2026 16:50
Trường THCS Lê Quý Đôn announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN VÀ ĐẦU TƯ GSA
03/08/2026 15:10
Trường THCS Lê Quý Đôn publishes the plan Renovating and repairing Le Quy Don Secondary School with 2 bidding package .
03/08/2026 11:43
Investor Trường THCS Lê Quý Đôn has posted an investment and development project Renovating and repairing Le Quy Don Secondary School.
30/07/2026 11:11
Trường THCS Lê Quý Đôn announced the results of the bid package Package 2: Project management consulting .
- Winning bidder: Ban quản lý dự án xây dựng Bắc Giang
02/07/2026 22:36
Trường THCS Lê Quý Đôn publishes the plan Supplementing the contractor selection plan for the package: Renovating and repairing Le Quy Don Secondary School with 1 bidding package .
02/07/2026 22:31
Trường THCS Lê Quý Đôn announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC VÀ XÂY DỰNG THÀNH ĐẠT
29/06/2026 22:25
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THCS Lê Quý Đôn has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường THCS Lê Quý Đôn has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường THCS Lê Quý Đôn has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects