Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THPT AN LÃO as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 4 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 20 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 11 packages that have not fully posted the contractor selection results. Of these 11 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 25.00%, Construction 75.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,265,233,000 VND, of which the total winning bid value is: 5,236,878,000 VND.
- The savings rate is: 0.54%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THPT AN LÃO as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 25.00%, Construction 75.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,265,233,000 VND, in which the total winning value is: 5,236,878,000 VND.
- The savings rate is: 0.54%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THPT AN LÃO are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 8 contractor selection plans, of which 5 were self-published, and 3 were published by other entities.
- Is the investor of 5 Tender Notices, of which 4 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THPT AN LÃO announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED
20/08/2026 11:21
TRƯỜNG THPT AN LÃO announced the results of the bid package Consultancy and verification of construction drawing design and cost estimate .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐK
20/08/2026 11:18
TRƯỜNG THPT AN LÃO announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐK
20/08/2026 11:13
TRƯỜNG THPT AN LÃO publishes the plan Procurement plan for the investment preparation phase of the An Lao High School renovation, repair, and new construction project (HM: construction of student restrooms; three-story classroom building in Zone B and restroom facilities). with 3 bidding package .
20/08/2026 11:09
TRƯỜNG THPT AN LÃO announced the results of the bid package Purchase a 4m long 2-layer horizontal sliding board for use in schools .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI & DỊCH VỤ, SẢN XUẤT HUY HƯNG
04/08/2026 15:00
TRƯỜNG THPT AN LÃO publishes the plan Purchase a 4m long 2-layer horizontal sliding board for use in schools with 1 bidding package .
30/07/2026 11:25
TRƯỜNG THPT AN LÃO announced the results of the bid package Procurement and installation of LED screens at An Lao High School .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI ĐIỆN TỬ VÀ TỔ CHỨC SỰ KIỆN LED VIỆT
31/12/2025 19:35
TRƯỜNG THPT AN LÃO publishes the plan Procurement and installation of LED screens at An Lao High School with 1 bidding package .
28/12/2025 10:39
The Bid solicitor TRƯỜNG THPT AN LÃO has posted the results of the bidding package Civil Works of the investor TRƯỜNG THPT AN LÃO.
- Winning bidder: KIEN THIET TRADING JOINT STOCK COMPANY
04/04/2025 10:29
Bid solicitor TRƯỜNG THPT AN LÃO has posted Tender Notice Civil Works of the investor TRƯỜNG THPT AN LÃO with the form Open bidding.
19/03/2025 14:31
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THPT AN LÃO announced the results of the bid package Civil Works .
- Winning bidder: KIEN THIET TRADING JOINT STOCK COMPANY
04/04/2025 10:29
TRƯỜNG THPT AN LÃO announced the results of the bidding package Civil Works with 1 participating contractors .
29/03/2025 10:04
TRƯỜNG THPT AN LÃO publishes the plan Repair and overcome damage after typhoon No. 3 in 2024 at An Lao High School (category: Housing of set A, Classroom Building Area B and Library Area; Drainage system, walls and trees; door systems, electrical systems, cables) with 5 bidding package .
17/03/2025 11:16
TRƯỜNG THPT AN LÃO announced the results of the bid package Civil Works .
- Winning bidder: Công ty cổ phần đầu tư xây lắp điện Việt Cường
18/09/2024 11:09
TRƯỜNG THPT AN LÃO announced the results of the bidding package Civil Works with 1 participating contractors .
12/09/2024 10:52
TRƯỜNG THPT AN LÃO publishes Tender Notice Civil Works in the form Competitive Offer .
30/08/2024 15:42
TRƯỜNG THPT AN LÃO publishes the plan Project contractor selection plan: Installing the electrical system at An Lao High School with 3 bidding package .
30/08/2024 14:48
TRƯỜNG THPT AN LÃO announced the results of the bid package Project management consultancy .
- Winning bidder: B.I.C.O CONSULTANT AND CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
08/07/2024 17:20
TRƯỜNG THPT AN LÃO announced the results of the bid package Construction supervision consultancy .
- Winning bidder: Xưởng Kiến Trúc Tạo Hình
08/07/2024 17:15
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THPT AN LÃO announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED
20/08/2026 11:21
TRƯỜNG THPT AN LÃO announced the results of the bid package Consultancy and verification of construction drawing design and cost estimate .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐK
20/08/2026 11:18
TRƯỜNG THPT AN LÃO announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐK
20/08/2026 11:13
TRƯỜNG THPT AN LÃO publishes the plan Procurement plan for the investment preparation phase of the An Lao High School renovation, repair, and new construction project (HM: construction of student restrooms; three-story classroom building in Zone B and restroom facilities). with 3 bidding package .
20/08/2026 11:09
TRƯỜNG THPT AN LÃO announced the results of the bid package Purchase a 4m long 2-layer horizontal sliding board for use in schools .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI & DỊCH VỤ, SẢN XUẤT HUY HƯNG
04/08/2026 15:00
TRƯỜNG THPT AN LÃO publishes the plan Purchase a 4m long 2-layer horizontal sliding board for use in schools with 1 bidding package .
30/07/2026 11:25
TRƯỜNG THPT AN LÃO announced the results of the bid package Procurement and installation of LED screens at An Lao High School .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI ĐIỆN TỬ VÀ TỔ CHỨC SỰ KIỆN LED VIỆT
31/12/2025 19:35
TRƯỜNG THPT AN LÃO publishes the plan Procurement and installation of LED screens at An Lao High School with 1 bidding package .
28/12/2025 10:39
The Bid solicitor TRƯỜNG THPT AN LÃO has posted the results of the bidding package Civil Works of the investor TRƯỜNG THPT AN LÃO.
- Winning bidder: KIEN THIET TRADING JOINT STOCK COMPANY
04/04/2025 10:29
Bid solicitor TRƯỜNG THPT AN LÃO has posted Tender Notice Civil Works of the investor TRƯỜNG THPT AN LÃO with the form Open bidding.
19/03/2025 14:31
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THPT AN LÃO has posted 5 of the contractor selection plan, which contains 20 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRƯỜNG THPT AN LÃO has posted 4 Tender Notices in 4 bidding packages. Among these, 4 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THPT AN LÃO has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THPT AN LÃO has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THPT AN LÃO has a relationship with 12 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THPT AN LÃO has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects