Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Tiểu học Kim Đồng as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường Tiểu học Kim Đồng as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Tiểu học Kim Đồng are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 10 contractor selection plans, of which 0 were self-published, and 10 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Tiểu học Kim Đồng announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG HƯNG THỊNH QUẢNG NAM
22/08/2026 17:35
Trường Tiểu học Kim Đồng announced the results of the bid package Construction supervision consultant .
- Winning bidder: KIEN THUC TRADING AND CONSTRUCTION COMPANY LIMITED
22/08/2026 17:31
Trường Tiểu học Kim Đồng announced the results of the bid package Project management consultancy .
- Winning bidder: NHAN LOC QUANG NAM CONSTRUCTION TECHNOLOGY COMPANY LIMITED
22/08/2026 17:28
Trường Tiểu học Kim Đồng publishes the plan Kim Dong Primary School facilities repair project with 3 bidding package .
22/08/2026 17:23
Trường Tiểu học Kim Đồng announced the results of the bid package Consulting design verification - cost estimate .
- Winning bidder: KIEN THUC TRADING AND CONSTRUCTION COMPANY LIMITED
22/08/2026 17:13
Trường Tiểu học Kim Đồng announced the results of the bid package Consulting on preparing financial protection equipment documents and estimates .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN XÂY DỰNG THĂNG PHÚ QUẢNG NAM
22/08/2026 17:10
Trường Tiểu học Kim Đồng publishes the plan Approve the cost estimates and procurement plans for works to be carried out during the investment preparation phase, including design and estimation. with 2 bidding package .
22/08/2026 17:06
Trường Tiểu học Kim Đồng publishes the plan Provide fuel (gas) and food to operate the school cafeteria for students in the 2026-2027 academic year. with 2 bidding package .
22/08/2026 16:43
Trường Tiểu học Kim Đồng announced the results of the bid package Pasteurized fresh milk with sugar 180ml/box .
- Winning bidder: VIETNAM DAIRY PRODUCTS JOINT STOCK COMPANY
24/02/2026 14:44
Trường Tiểu học Kim Đồng publishes the plan Buy milk in school meals for students of Kim Dong Primary School according to Resolution No. 17/2023/NQ-HDND dated September 22, 2023 of the Provincial People's Council for the 2nd semester of the 2025-2026 school year with 1 bidding package .
16/02/2026 07:34
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Tiểu học Kim Đồng has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Tiểu học Kim Đồng has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Tiểu học Kim Đồng has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects