Data analysis results of DauThau.info software for bid solicitors Tuyen Quang Hydro Power Company as follows:
- Has relationships with 2 project owners.
- Has relationships with 276 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 324 contractor selection plans with a total of 373 bidding packages, of which 318 prequalification documents have not found the investment project.
- Has invited bids for 305 packages (with 310 tender notices), and conducted prequalification for 0 packages.
- There are 5 bidding packages with content that needs clarification.
- Announced the results of 245 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 9 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 87 packages that have not fully posted the contractor selection results. Of these 80 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.75 contractors.
- Breakdown by bidding field: Goods 64.19%, Construction 12.26%, Consultancy 5.48%, Non-consultancy 18.06%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 490,770,559,956 VND, of which the total winning bid value is: 448,993,049,555 VND.
- The savings rate is: 8.51%.
Data analysis results of DauThau.info software for bid solicitors Tuyen Quang Hydro Power Company as follows:
- Has relationships with 276 contractor.
- The average number of contractors participating in each bidding package is: 2.75 contractors.
- Proportion of bidding fields: Goods 64.19%, Construction 12.26%, Consulting 5.48%, Non-consulting 18.06%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 490,770,559,956 VND, in which the total winning value is: 448,993,049,555 VND.
- The savings rate is: 8.51%.
This Bid solicitor is also an investor. The analysis results of data for the investor Tuyen Quang Hydro Power Company are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 249 contractor selection plans, of which 226 were self-published, and 23 were published by other entities.
- Is the investor of 195 Tender Notices, of which 191 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Tuyen Quang Hydro Power Company publishes the plan Domestic wastewater collection, transportation and treatment service in Na Hang area in 2026 with 1 bidding package .
08/01/2026 15:10
Tuyen Quang Hydro Power Company publishes the plan Providing materials for regular repairs in the first phase of 2026 and consumables for regular repairs in 2026 with 2 bidding package .
17/12/2025 17:16
Tuyen Quang Hydro Power Company publishes the plan Shopping for a laptop for work with 1 bidding package .
12/12/2025 09:42
Tuyen Quang Hydro Power Company publishes the plan Renovating the tennis court into a pickleball court at the Production Operations Center with 1 bidding package .
03/12/2025 07:18
Tuyen Quang Hydro Power Company publishes the plan Outsourcing service bidding packages in 2026 with 4 bidding package .
26/11/2025 15:31
Tuyen Quang Hydro Power Company publishes the plan Contractor selection plan for the package Providing intensive testing services for MBA T3 Tuyen Quang Hydropower Plant in 2025 with 1 bidding package .
20/10/2025 08:24
Tuyen Quang Hydro Power Company publishes the plan Bidding packages for shopping for personal protection and office uniforms in 2025 with 2 bidding package .
16/10/2025 07:32
Tuyen Quang Hydro Power Company publishes the plan Review the gap and test the control network (OT) in 2025 with 1 bidding package .
01/10/2025 07:19
Tuyen Quang Hydro Power Company publishes the plan Shopping supplies and supplements for major repair of H3's groups in 2025 with 1 bidding package .
24/09/2025 20:34
Tuyen Quang Hydro Power Company publishes the plan Shopping supplies and supplements for major repair of H3's groups in 2025 with 1 bidding package .
24/09/2025 20:31
The data sheet has been partially hidden, to see the full information please Login or Register
Tuyen Quang Hydro Power Company publishes the plan Assessment of quality management system monitoring according to ISO 9001: 2015 & Monitoring, Safety and Safety System Conversion, Safety and Security according to ISO/IEC 27001: 2013 to ISO/IEC 27001: 2022 with 1 bidding package .
26/06/2025 13:38
Tuyen Quang Hydro Power Company publishes the plan Renovating and upgrading the souvenir building of Tuyen Quang Hydroelectric Plant with 1 bidding package .
17/06/2025 07:37
Tuyen Quang Hydro Power Company publishes the plan Providing equipment and technical services and the installation of the cabinet and the cutting machine, the rod to use the door to receive water 03 units and AC/DC cabinets with 1 bidding package .
12/06/2025 16:20
Tuyen Quang Hydro Power Company publishes the plan Providing equipment and equipment for technical options and repair work in the last 6 months of 2025 with 1 bidding package .
09/06/2025 10:27
Tuyen Quang Hydro Power Company publishes the plan Providing supplies and equipment and technical services to repair the automatic gas supply system of H2 with 1 bidding package .
29/05/2025 20:30
Tuyen Quang Hydro Power Company publishes the plan Processing 220kV Porcelain flanges for the main transformer with 1 bidding package .
19/05/2025 09:22
Tuyen Quang Hydro Power Company publishes the plan Monitoring and deformation of Tuyen Quang hydroelectric project items in 2025 with 1 bidding package .
08/05/2025 15:48
Tuyen Quang Hydro Power Company publishes the plan Purchase equipment for domestic wastewater treatment systems with 1 bidding package .
07/05/2025 08:53
Tuyen Quang Hydro Power Company publishes the plan Bidding packages for construction and supervision consultancy on Fire Prevention and Fighting System of Tuyen Quang Hydroelectric Company with 2 bidding package .
06/05/2025 15:15
Tuyen Quang Hydro Power Company publishes the plan Regularly repairing the operating center system in 2025 with 1 bidding package .
24/04/2025 20:06
The data sheet has been partially hidden, to see the full information please Login or Register
Tuyen Quang Hydro Power Company publishes the plan Domestic wastewater collection, transportation and treatment service in Na Hang area in 2026 with 1 bidding package .
08/01/2026 15:10
Tuyen Quang Hydro Power Company publishes the plan Providing materials for regular repairs in the first phase of 2026 and consumables for regular repairs in 2026 with 2 bidding package .
17/12/2025 17:16
Tuyen Quang Hydro Power Company publishes the plan Shopping for a laptop for work with 1 bidding package .
12/12/2025 09:42
Tuyen Quang Hydro Power Company publishes the plan Renovating the tennis court into a pickleball court at the Production Operations Center with 1 bidding package .
03/12/2025 07:18
Tuyen Quang Hydro Power Company publishes the plan Outsourcing service bidding packages in 2026 with 4 bidding package .
26/11/2025 15:31
Tuyen Quang Hydro Power Company publishes the plan Contractor selection plan for the package Providing intensive testing services for MBA T3 Tuyen Quang Hydropower Plant in 2025 with 1 bidding package .
20/10/2025 08:24
Tuyen Quang Hydro Power Company publishes the plan Bidding packages for shopping for personal protection and office uniforms in 2025 with 2 bidding package .
16/10/2025 07:32
Tuyen Quang Hydro Power Company publishes the plan Review the gap and test the control network (OT) in 2025 with 1 bidding package .
01/10/2025 07:19
Tuyen Quang Hydro Power Company publishes the plan Shopping supplies and supplements for major repair of H3's groups in 2025 with 1 bidding package .
24/09/2025 20:34
Tuyen Quang Hydro Power Company publishes the plan Shopping supplies and supplements for major repair of H3's groups in 2025 with 1 bidding package .
24/09/2025 20:31
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Tuyen Quang Hydro Power Company has posted 324 of the contractor selection plan, which contains 373 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Tuyen Quang Hydro Power Company has posted 310 Tender Notices in 305 bidding packages. Among these, 225 Tender Notices were self-invited, and 85 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Tuyen Quang Hydro Power Company has posted 245 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 245 package, canceled the bid 0 package (among the bidding packages above).
- There are 9 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Tuyen Quang Hydro Power Company has a relationship with 276 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Tuyen Quang Hydro Power Company has a relationship with 1 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Tuyen Quang Hydro Power Company has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects