Data analysis results of DauThau.info software for bid solicitors UBND xã Sơn Kim 2 as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 6 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 7 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 244,510,000 VND, of which the total winning bid value is: 244,510,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Sơn Kim 2 as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 244,510,000 VND, in which the total winning value is: 244,510,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Sơn Kim 2 are as follows:
- Is the investor of 6 development investment projects.
- Is the investor of 22 contractor selection plans, of which 2 were self-published, and 20 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
UBND xã Sơn Kim 2 announced the results of the bid package Procurement of rescue and disaster relief equipment in 2026 .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ PHÁT TRIỂN DOANH NHÂN
26/08/2026 08:45
UBND xã Sơn Kim 2 publishes the plan Procurement of rescue and disaster relief equipment in 2026 with 1 bidding package .
20/08/2026 15:33
UBND xã Sơn Kim 2 announced the results of the bid package 02. Road maintenance: Regular maintenance of the main road in Thon 02, Chế Biến Village, Son Kim 2 Commune. .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CÔNG TRÌNH HTP
20/08/2026 09:56
UBND xã Sơn Kim 2 announced the results of the bid package 03. Regular maintenance of the main road in Thon 02, Chế Biến Village, Son Kim 2 Commune .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI DŨNG SƠN
19/08/2026 07:57
UBND xã Sơn Kim 2 announced the results of the bid package 01. XL: Regular maintenance and repair of the main road in Thon 02, Chế Biến Village, Son Kim 2 Commune. .
- Winning bidder: CÔNG TY CP TẬP ĐOÀN HẢI ĐĂNG
19/08/2026 07:53
UBND xã Sơn Kim 2 publishes the plan The bidding plan outlines the tasks for selecting a contractor to perform: Regular maintenance of the main road in Thon 02, Son Kim 2 Village. with 3 bidding package .
17/08/2026 14:13
UBND xã Sơn Kim 2 announced the results of the bid package 02. Sports Training (Private)
Assessment and Design
Drafting and Planning .
- Winning bidder: FANT CONSULTANT INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
10/08/2026 11:13
UBND xã Sơn Kim 2 announced the results of the bid package 01. Consulting Services:
Economic and technical feasibility studies, report preparation .
- Winning bidder: CÔNG TY CP XÂY DỰNG THƯƠNG MẠI TỔNG HỢP NGỌC VIỆT
10/08/2026 11:05
UBND xã Sơn Kim 2 publishes the plan Plan for selecting a contractor: Preparation phase for project investment:
Regular maintenance of the main road in Thon 02, Che Bien Village, Son Kim 2 Commune. with 2 bidding package .
06/08/2026 07:46
UBND xã Sơn Kim 2 announced the results of the bid package Package 09.BH: Insurance for works Repairing and upgrading Khe Da dam, Thuong Kim Village, Son Kim 2 commune .
- Winning bidder: BaoViet Insurance Corporation
30/07/2026 10:16
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Sơn Kim 2 announced the results of the bid package Cement shopping implements the plan to build roads and drainage ditches in 2025 in Son Kim 2 commune .
- Winning bidder: QUANG THANG CONSTRUCTION TRADING TRANSPORT COMPANY LIMITED
18/04/2025 04:47
UBND xã Sơn Kim 2 publishes the plan Selecting the contractor for estimating cement shopping to implement the plan to build roads and drainage ditches in 2025 in Son Kim 2 commune with 1 bidding package .
16/04/2025 15:05
UBND xã Sơn Kim 2 publishes the plan Contractor selection plan Project: Repairing and overcoming rural roads in Ha Vang village, Son Kim 2 commune with 6 bidding package .
06/09/2024 09:44
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Sơn Kim 2 announced the results of the bid package Procurement of rescue and disaster relief equipment in 2026 .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ PHÁT TRIỂN DOANH NHÂN
26/08/2026 08:45
UBND xã Sơn Kim 2 publishes the plan Procurement of rescue and disaster relief equipment in 2026 with 1 bidding package .
20/08/2026 15:33
UBND xã Sơn Kim 2 announced the results of the bid package 02. Road maintenance: Regular maintenance of the main road in Thon 02, Chế Biến Village, Son Kim 2 Commune. .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CÔNG TRÌNH HTP
20/08/2026 09:56
UBND xã Sơn Kim 2 announced the results of the bid package 03. Regular maintenance of the main road in Thon 02, Chế Biến Village, Son Kim 2 Commune .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI DŨNG SƠN
19/08/2026 07:57
UBND xã Sơn Kim 2 announced the results of the bid package 01. XL: Regular maintenance and repair of the main road in Thon 02, Chế Biến Village, Son Kim 2 Commune. .
- Winning bidder: CÔNG TY CP TẬP ĐOÀN HẢI ĐĂNG
19/08/2026 07:53
UBND xã Sơn Kim 2 publishes the plan The bidding plan outlines the tasks for selecting a contractor to perform: Regular maintenance of the main road in Thon 02, Son Kim 2 Village. with 3 bidding package .
17/08/2026 14:13
UBND xã Sơn Kim 2 announced the results of the bid package 02. Sports Training (Private)
Assessment and Design
Drafting and Planning .
- Winning bidder: FANT CONSULTANT INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
10/08/2026 11:13
UBND xã Sơn Kim 2 announced the results of the bid package 01. Consulting Services:
Economic and technical feasibility studies, report preparation .
- Winning bidder: CÔNG TY CP XÂY DỰNG THƯƠNG MẠI TỔNG HỢP NGỌC VIỆT
10/08/2026 11:05
UBND xã Sơn Kim 2 publishes the plan Plan for selecting a contractor: Preparation phase for project investment:
Regular maintenance of the main road in Thon 02, Che Bien Village, Son Kim 2 Commune. with 2 bidding package .
06/08/2026 07:46
UBND xã Sơn Kim 2 announced the results of the bid package Package 09.BH: Insurance for works Repairing and upgrading Khe Da dam, Thuong Kim Village, Son Kim 2 commune .
- Winning bidder: BaoViet Insurance Corporation
30/07/2026 10:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND xã Sơn Kim 2 has posted 2 of the contractor selection plan, which contains 7 of the bidding package. See full list here
Summary: The Bid solicitor UBND xã Sơn Kim 2 has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND xã Sơn Kim 2 has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND xã Sơn Kim 2 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects