Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã An Bình as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 25 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 16 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 86,755,000 VND, of which the total winning bid value is: 86,755,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã An Bình as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 86,755,000 VND, in which the total winning value is: 86,755,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Uỷ ban nhân dân xã An Bình are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 4 contractor selection plans, of which 4 were self-published, and 0 were published by other entities.
- Is the investor of 8 Tender Notices, of which 0 were self-invited, and 8 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted the results of the bidding package Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XÂY DỰNG SONG NGỌC ĐỒNG THÁP
05/12/2024 15:36
The Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted the results of the bidding package Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH MTV TV - ĐẦU TƯ XÂY DỰNG TRƯỜNG PHÁT ĐỒNG THÁP
05/12/2024 15:23
Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted Tender Notice Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình with the form Competitive Offer.
25/11/2024 08:59
Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted Tender Notice Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình with the form Competitive Offer.
21/11/2024 16:27
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the request Upgrading and renovating the garden of the Cultural House in An Dinh hamlet, An Binh commune of the investor Uỷ ban nhân dân xã An Bình with 5 bidding package.
20/11/2024 11:29
Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted Tender Notice Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình with the form Competitive Offer.
18/11/2024 11:21
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the request Overcoming landslides and subsidence of Dinh bridge - Ba Cho mountain (section of Mr. Nguyen Khac Nguyen's house - Be Em), An Binh commune of the investor Uỷ ban nhân dân xã An Bình with 5 bidding package.
15/11/2024 16:50
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the results of the bidding package Package 04: Construction supervision consultancy of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HÒA PHÚ ĐỒNG THÁP
19/08/2024 16:52
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the results of the bidding package Bidding package 03: Preparation of appraisal of bidding documents, results of selection of construction contractors of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐỒNG TIẾN
19/08/2024 16:50
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the results of the bidding package Bidding package 02: Prepare bidding documents and evaluate construction bids of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG
19/08/2024 16:46
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ ban nhân dân xã An Bình publishes the plan Upgrading and renovating the garden of the Cultural House in An Dinh hamlet, An Binh commune with 5 bidding package .
20/11/2024 11:29
Uỷ ban nhân dân xã An Bình publishes the plan Overcoming landslides and subsidence of Dinh bridge - Ba Cho mountain (section of Mr. Nguyen Khac Nguyen's house - Be Em), An Binh commune with 5 bidding package .
15/11/2024 16:50
Uỷ ban nhân dân xã An Bình announced the results of the bid package Package 04: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HÒA PHÚ ĐỒNG THÁP
19/08/2024 16:52
Uỷ ban nhân dân xã An Bình announced the results of the bid package Bidding package 03: Preparation of appraisal of bidding documents, results of selection of construction contractors .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐỒNG TIẾN
19/08/2024 16:50
Uỷ ban nhân dân xã An Bình announced the results of the bid package Bidding package 02: Prepare bidding documents and evaluate construction bids .
- Winning bidder: CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG
19/08/2024 16:46
Uỷ ban nhân dân xã An Bình announced the results of the bid package Package 01: Project management costs .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HÒA PHÚ ĐỒNG THÁP
19/08/2024 16:44
Uỷ ban nhân dân xã An Bình publishes the plan Plan to select contractors for Dong My Road (section from Binh Dinh bridge to Tan Truong bridge) with 5 bidding package .
25/06/2024 16:38
Uỷ ban nhân dân xã An Bình publishes the plan Plan to select contractors for Dong My Road (section from Binh Dinh bridge to Tan Truong bridge) with 5 bidding package .
30/05/2024 13:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted the results of the bidding package Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XÂY DỰNG SONG NGỌC ĐỒNG THÁP
05/12/2024 15:36
The Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted the results of the bidding package Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH MTV TV - ĐẦU TƯ XÂY DỰNG TRƯỜNG PHÁT ĐỒNG THÁP
05/12/2024 15:23
Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted Tender Notice Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình with the form Competitive Offer.
25/11/2024 08:59
Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted Tender Notice Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình with the form Competitive Offer.
21/11/2024 16:27
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the request Upgrading and renovating the garden of the Cultural House in An Dinh hamlet, An Binh commune of the investor Uỷ ban nhân dân xã An Bình with 5 bidding package.
20/11/2024 11:29
Bid solicitor CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG has posted Tender Notice Tender package No 02: Construction and installation of the investor Uỷ ban nhân dân xã An Bình with the form Competitive Offer.
18/11/2024 11:21
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the request Overcoming landslides and subsidence of Dinh bridge - Ba Cho mountain (section of Mr. Nguyen Khac Nguyen's house - Be Em), An Binh commune of the investor Uỷ ban nhân dân xã An Bình with 5 bidding package.
15/11/2024 16:50
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the results of the bidding package Package 04: Construction supervision consultancy of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HÒA PHÚ ĐỒNG THÁP
19/08/2024 16:52
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the results of the bidding package Bidding package 03: Preparation of appraisal of bidding documents, results of selection of construction contractors of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐỒNG TIẾN
19/08/2024 16:50
The Bid solicitor Uỷ ban nhân dân xã An Bình has posted the results of the bidding package Bidding package 02: Prepare bidding documents and evaluate construction bids of the investor Uỷ ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN CÔNG NGHỆ CHÂU GIANG
19/08/2024 16:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Uỷ ban nhân dân xã An Bình has posted 8 of the contractor selection plan, which contains 25 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã An Bình has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Uỷ ban nhân dân xã An Bình has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Uỷ ban nhân dân xã An Bình has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects