Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ủy ban nhân dân xã Tịnh Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 27 contractor.
- Announced 32 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 44 contractor selection plans with a total of 153 bidding packages, of which 11 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 11 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 79 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 71 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 74 packages that have not fully posted the contractor selection results. Of these 73 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.88 contractors.
- Breakdown by bidding field: Goods 54.55%, Construction 45.45%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 10,751,985,873 VND, of which the total winning bid value is: 10,531,274,845 VND.
- The savings rate is: 2.05%.
Data analysis results of DauThau.info software for bid solicitors ủy ban nhân dân xã Tịnh Sơn as follows:
- Has relationships with 27 contractor.
- The average number of contractors participating in each bidding package is: 1.88 contractors.
- Proportion of bidding fields: Goods 54.55%, Construction 45.45%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 10,751,985,873 VND, in which the total winning value is: 10,531,274,845 VND.
- The savings rate is: 2.05%.
This Bid solicitor is also an investor. The analysis results of data for the investor ủy ban nhân dân xã Tịnh Sơn are as follows:
- Is the investor of 32 development investment projects.
- Is the investor of 41 contractor selection plans, of which 41 were self-published, and 0 were published by other entities.
- Is the investor of 11 Tender Notices, of which 10 were self-invited, and 1 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Works: repair and maintenance of the inner field route from B6-2-Rang channel Ong Uu-Dong Chau elected, 4, Phuoc Loc Dong village, Tinh Son commune of the investor ủy ban nhân dân xã Tịnh Sơn with 3 bidding package.
27/05/2025 14:23
Investor ủy ban nhân dân xã Tịnh Sơn has posted an investment and development project Works: repair and maintenance of the inner field route from B6-2-Rang channel Ong Uu-Dong Chau elected, 4, Phuoc Loc Dong village, Tinh Son commune.
27/05/2025 14:14
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Works: Upgrading and repairing the route of ĐX11 commune (bordering National Highway 24B - Ong Nghia Alley) and route of DX13 commune (Mr. Phuoc - Cong lane through the canal of Cay Dau pumping station) of the investor ủy ban nhân dân xã Tịnh Sơn with 3 bidding package.
24/05/2025 17:57
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Works: Upgrading and repairing the route of Village DTH1 (adjacent to Phuoc Loc Street - Cho Dinh - Alley Ong Chuong) of the investor ủy ban nhân dân xã Tịnh Sơn with 3 bidding package.
24/05/2025 17:48
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Works: Upgrading and solidifying Cho Tong Pumping Station Station (section from the Commune Police Working House - Ong Chuan Alley) of the investor ủy ban nhân dân xã Tịnh Sơn with 4 bidding package.
24/05/2025 17:04
Investor ủy ban nhân dân xã Tịnh Sơn has posted an investment and development project Works: Upgrading and repairing the route of DX11 commune (bordering Highway 24B - Ong Nghia Alley) and the route of ĐX13 commune (Mr. Phuoc - sewer through the canal of Tree Pumping Station).
24/05/2025 16:16
Investor ủy ban nhân dân xã Tịnh Sơn has posted an investment and development project Works: Upgrading and repairing Village route ĐTH1 (bordering Phuoc Loc - Cho Dinh - Alley Ong Chuong).
24/05/2025 16:16
Investor ủy ban nhân dân xã Tịnh Sơn has posted an investment and development project Works: Upgrading and solidifying Cho Tong Pumping Station Station (section from the Commune Police Working House - Ong Chuan Alley).
24/05/2025 16:16
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Bidding package: Performance model applies new varieties, technical advances, new technologies in summer -autumn rice production in 2025 under the funding for rice and development of rice cultivation in Tinh Son commune of the investor ủy ban nhân dân xã Tịnh Sơn with 1 bidding package.
23/05/2025 14:58
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Work: Upgrading and repairing the alley route of Ong Duong - Team 20 - Team 23 (Mr. Duong's alley to the BTXM Road of Team 20 has upgraded in 2023) and the alley route of Ong Phat - Alley Ong Nam Trinh (the section from Ong Son Alley to Ong Nam Trinh Alley) of the investor ủy ban nhân dân xã Tịnh Sơn with 3 bidding package.
23/05/2025 14:39
The data sheet has been partially hidden, to see the full information please Login or Register
ủy ban nhân dân xã Tịnh Sơn publishes the plan Works: repair and maintenance of the inner field route from B6-2-Rang channel Ong Uu-Dong Chau elected, 4, Phuoc Loc Dong village, Tinh Son commune with 3 bidding package .
27/05/2025 14:23
ủy ban nhân dân xã Tịnh Sơn publishes the plan Works: Upgrading and repairing the route of ĐX11 commune (bordering National Highway 24B - Ong Nghia Alley) and route of DX13 commune (Mr. Phuoc - Cong lane through the canal of Cay Dau pumping station) with 3 bidding package .
24/05/2025 17:57
ủy ban nhân dân xã Tịnh Sơn publishes the plan Works: Upgrading and repairing the route of Village DTH1 (adjacent to Phuoc Loc Street - Cho Dinh - Alley Ong Chuong) with 3 bidding package .
24/05/2025 17:48
ủy ban nhân dân xã Tịnh Sơn publishes the plan Works: Upgrading and solidifying Cho Tong Pumping Station Station (section from the Commune Police Working House - Ong Chuan Alley) with 4 bidding package .
24/05/2025 17:04
ủy ban nhân dân xã Tịnh Sơn publishes the plan Bidding package: Performance model applies new varieties, technical advances, new technologies in summer -autumn rice production in 2025 under the funding for rice and development of rice cultivation in Tinh Son commune with 1 bidding package .
23/05/2025 14:58
ủy ban nhân dân xã Tịnh Sơn publishes the plan Work: Upgrading and repairing the alley route of Ong Duong - Team 20 - Team 23 (Mr. Duong's alley to the BTXM Road of Team 20 has upgraded in 2023) and the alley route of Ong Phat - Alley Ong Nam Trinh (the section from Ong Son Alley to Ong Nam Trinh Alley) with 3 bidding package .
23/05/2025 14:39
ủy ban nhân dân xã Tịnh Sơn publishes the plan Building a new lighting line along the roads of DX.3 commune; ĐX.5; DX.5A and DX.22 belong to the plan: Implementation of content 05 - Content component No. 07: "Support and replication of villages and hamlets of Sang - Green - Clean - Beautiful, Safe, model residential area" in Phuoc Loc Dong village, Tinh Son commune, Son Tinh district, Quang Ngai province, Quang Ngai province with 4 bidding package .
22/04/2025 14:47
ủy ban nhân dân xã Tịnh Sơn publishes the plan Xây dựng mới tuyến điện chiếu sáng dọc 02 tuyến đường xã ĐX.14 và ĐX.15 (đoạn từ giáp Quốc lộ 24B – Mỏ đá Ba Gia; đoạn Đội 23 – Đội 20) thuộc Phương án: Thực hiện Nội dung 05 - Nội dung thành phần số 07: “Hỗ trợ và nhân rộng các mô hình thôn, xóm sáng - xanh - sạch - đẹp, an toàn, khu dân cư kiểu mẫu” tại thôn Diên Niên, xã Tịnh Sơn, huyện Sơn Tịnh, tỉnh Quảng Ngãi with 4 bidding package .
22/04/2025 14:33
ủy ban nhân dân xã Tịnh Sơn publishes the plan Tree Tree Pumping Station (extended) with 5 bidding package .
18/03/2025 15:02
ủy ban nhân dân xã Tịnh Sơn announced the results of the bid package Tender package No 05: Construction work .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG MIỀN TRUNG
19/12/2024 20:02
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Works: repair and maintenance of the inner field route from B6-2-Rang channel Ong Uu-Dong Chau elected, 4, Phuoc Loc Dong village, Tinh Son commune of the investor ủy ban nhân dân xã Tịnh Sơn with 3 bidding package.
27/05/2025 14:23
Investor ủy ban nhân dân xã Tịnh Sơn has posted an investment and development project Works: repair and maintenance of the inner field route from B6-2-Rang channel Ong Uu-Dong Chau elected, 4, Phuoc Loc Dong village, Tinh Son commune.
27/05/2025 14:14
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Works: Upgrading and repairing the route of ĐX11 commune (bordering National Highway 24B - Ong Nghia Alley) and route of DX13 commune (Mr. Phuoc - Cong lane through the canal of Cay Dau pumping station) of the investor ủy ban nhân dân xã Tịnh Sơn with 3 bidding package.
24/05/2025 17:57
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Works: Upgrading and repairing the route of Village DTH1 (adjacent to Phuoc Loc Street - Cho Dinh - Alley Ong Chuong) of the investor ủy ban nhân dân xã Tịnh Sơn with 3 bidding package.
24/05/2025 17:48
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Works: Upgrading and solidifying Cho Tong Pumping Station Station (section from the Commune Police Working House - Ong Chuan Alley) of the investor ủy ban nhân dân xã Tịnh Sơn with 4 bidding package.
24/05/2025 17:04
Investor ủy ban nhân dân xã Tịnh Sơn has posted an investment and development project Works: Upgrading and repairing the route of DX11 commune (bordering Highway 24B - Ong Nghia Alley) and the route of ĐX13 commune (Mr. Phuoc - sewer through the canal of Tree Pumping Station).
24/05/2025 16:16
Investor ủy ban nhân dân xã Tịnh Sơn has posted an investment and development project Works: Upgrading and repairing Village route ĐTH1 (bordering Phuoc Loc - Cho Dinh - Alley Ong Chuong).
24/05/2025 16:16
Investor ủy ban nhân dân xã Tịnh Sơn has posted an investment and development project Works: Upgrading and solidifying Cho Tong Pumping Station Station (section from the Commune Police Working House - Ong Chuan Alley).
24/05/2025 16:16
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Bidding package: Performance model applies new varieties, technical advances, new technologies in summer -autumn rice production in 2025 under the funding for rice and development of rice cultivation in Tinh Son commune of the investor ủy ban nhân dân xã Tịnh Sơn with 1 bidding package.
23/05/2025 14:58
The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted the request Work: Upgrading and repairing the alley route of Ong Duong - Team 20 - Team 23 (Mr. Duong's alley to the BTXM Road of Team 20 has upgraded in 2023) and the alley route of Ong Phat - Alley Ong Nam Trinh (the section from Ong Son Alley to Ong Nam Trinh Alley) of the investor ủy ban nhân dân xã Tịnh Sơn with 3 bidding package.
23/05/2025 14:39
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ủy ban nhân dân xã Tịnh Sơn has posted 44 of the contractor selection plan, which contains 153 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted 11 Tender Notices in 9 bidding packages. Among these, 10 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has posted 79 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 79 package, canceled the bid 0 package (among the bidding packages above).
- There are 71 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has a relationship with 27 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ủy ban nhân dân xã Tịnh Sơn has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ủy ban nhân dân xã Tịnh Sơn has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects