Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Vạn Thắng as follows:
- Has relationships with 3 project owners.
- Has relationships with 9 contractor.
- Announced 7 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 34 contractor selection plans with a total of 93 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 10 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 24 packages that have not fully posted the contractor selection results. Of these 21 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.17 contractors.
- Breakdown by bidding field: Goods 0%, Construction 80.00%, Consultancy 0%, Non-consultancy 20.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 14,265,211,827 VND, of which the total winning bid value is: 14,210,619,000 VND.
- The savings rate is: 0.38%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Vạn Thắng as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 1.17 contractors.
- Proportion of bidding fields: Goods 0%, Construction 80.00%, Consulting 0%, Non-consulting 20.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 14,265,211,827 VND, in which the total winning value is: 14,210,619,000 VND.
- The savings rate is: 0.38%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân xã Vạn Thắng are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 35 contractor selection plans, of which 28 were self-published, and 7 were published by other entities.
- Is the investor of 9 Tender Notices, of which 4 were self-invited, and 5 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Plan for selecting construction contractors: Phu Hoi 2 street (from Mr. Cuong's house to Mr. Thuong's house; from Mr. Dinh's house to Mrs. The's house). of the investor Ủy ban nhân dân xã Vạn Thắng with 2 bidding package.
26/05/2025 22:13
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Phu Hoi 2 Street (from Mr. Cuong's house to Mr. Thuong's house; from Mr. Dinh's house to Mrs. The's house). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
26/05/2025 22:08
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Plan for selecting construction contractors: Upgrading branch roads in Phu Hoi 3. of the investor Ủy ban nhân dân xã Vạn Thắng with 2 bidding package.
02/04/2025 21:36
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Upgrading branch roads in Phu Hoi 3. of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
02/04/2025 21:32
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
Works: The electricity system lights from the gate of Suoi Co village to the overflow dam (phase 1). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
31/03/2025 19:59
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: The electricity system lights from the gate of Suoi Co village to the overflow dam (phase 1). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
31/03/2025 19:51
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
Works: Solar lighting system of Phu Hoi 2 village (from Nguyen Hue junction to the sea). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
31/03/2025 19:38
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Solar lighting system of Phu Hoi 2 village (from Nguyen Hue junction to the sea). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
31/03/2025 19:32
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Plan for selecting construction contractors: Building militia houses, repairing fence gates and warehouses of the commune committee. of the investor Ủy ban nhân dân xã Vạn Thắng with 2 bidding package.
31/03/2025 19:19
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Building militia houses, repairing fence gates and warehouses of the commune committee. of the investor Ủy ban nhân dân xã Vạn Thắng with 2 bidding package.
31/03/2025 19:12
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Vạn Thắng publishes the plan Plan for selecting construction contractors: Phu Hoi 2 street (from Mr. Cuong's house to Mr. Thuong's house; from Mr. Dinh's house to Mrs. The's house). with 2 bidding package .
26/05/2025 22:13
Ủy ban nhân dân xã Vạn Thắng publishes the plan Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Phu Hoi 2 Street (from Mr. Cuong's house to Mr. Thuong's house; from Mr. Dinh's house to Mrs. The's house). with 3 bidding package .
26/05/2025 22:08
Ủy ban nhân dân xã Vạn Thắng publishes the plan Plan for selecting construction contractors: Upgrading branch roads in Phu Hoi 3. with 2 bidding package .
02/04/2025 21:36
Ủy ban nhân dân xã Vạn Thắng publishes the plan Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Upgrading branch roads in Phu Hoi 3. with 3 bidding package .
02/04/2025 21:32
Ủy ban nhân dân xã Vạn Thắng publishes the plan Contractor selection plan
Works: The electricity system lights from the gate of Suoi Co village to the overflow dam (phase 1). with 3 bidding package .
31/03/2025 19:59
Ủy ban nhân dân xã Vạn Thắng publishes the plan Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: The electricity system lights from the gate of Suoi Co village to the overflow dam (phase 1). with 3 bidding package .
31/03/2025 19:51
Ủy ban nhân dân xã Vạn Thắng publishes the plan Contractor selection plan
Works: Solar lighting system of Phu Hoi 2 village (from Nguyen Hue junction to the sea). with 3 bidding package .
31/03/2025 19:38
Ủy ban nhân dân xã Vạn Thắng publishes the plan Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Solar lighting system of Phu Hoi 2 village (from Nguyen Hue junction to the sea). with 3 bidding package .
31/03/2025 19:32
Ủy ban nhân dân xã Vạn Thắng publishes the plan Plan for selecting construction contractors: Building militia houses, repairing fence gates and warehouses of the commune committee. with 2 bidding package .
31/03/2025 19:19
Ủy ban nhân dân xã Vạn Thắng publishes the plan Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Building militia houses, repairing fence gates and warehouses of the commune committee. with 2 bidding package .
31/03/2025 19:12
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Plan for selecting construction contractors: Phu Hoi 2 street (from Mr. Cuong's house to Mr. Thuong's house; from Mr. Dinh's house to Mrs. The's house). of the investor Ủy ban nhân dân xã Vạn Thắng with 2 bidding package.
26/05/2025 22:13
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Phu Hoi 2 Street (from Mr. Cuong's house to Mr. Thuong's house; from Mr. Dinh's house to Mrs. The's house). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
26/05/2025 22:08
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Plan for selecting construction contractors: Upgrading branch roads in Phu Hoi 3. of the investor Ủy ban nhân dân xã Vạn Thắng with 2 bidding package.
02/04/2025 21:36
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Upgrading branch roads in Phu Hoi 3. of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
02/04/2025 21:32
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
Works: The electricity system lights from the gate of Suoi Co village to the overflow dam (phase 1). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
31/03/2025 19:59
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: The electricity system lights from the gate of Suoi Co village to the overflow dam (phase 1). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
31/03/2025 19:51
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
Works: Solar lighting system of Phu Hoi 2 village (from Nguyen Hue junction to the sea). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
31/03/2025 19:38
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Solar lighting system of Phu Hoi 2 village (from Nguyen Hue junction to the sea). of the investor Ủy ban nhân dân xã Vạn Thắng with 3 bidding package.
31/03/2025 19:32
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Plan for selecting construction contractors: Building militia houses, repairing fence gates and warehouses of the commune committee. of the investor Ủy ban nhân dân xã Vạn Thắng with 2 bidding package.
31/03/2025 19:19
The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted the request Contractor selection plan
(Consulting packages are implemented before the approved investment project)
Works: Building militia houses, repairing fence gates and warehouses of the commune committee. of the investor Ủy ban nhân dân xã Vạn Thắng with 2 bidding package.
31/03/2025 19:12
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Vạn Thắng has posted 34 of the contractor selection plan, which contains 93 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted 10 Tender Notices in 9 bidding packages. Among these, 4 Tender Notices were self-invited, and 6 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Vạn Thắng has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân xã Vạn Thắng has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects