| No | List of product/services | Quantity | Unit | Description | Location | Specification | Note | Feature |
|---|---|---|---|---|---|---|---|---|
1 |
Christmas-themed packaging/Packing |
1 |
Set |
Material for the insert fitting: P6315CL; Compatible with KOSO valve Model: 501T; Valve Serial No: V1RA35/36- 032; Valve Size: 2"x 2" DN50; KOSO Part Number: 11LBG30AA411 |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
2 |
Seal/Gasket |
1 |
Female |
Material: T1890-S. Compatible with KOSO valve: Model 501T; Serial No: V1RA35/36-032; Valve Size: 2"x 2" DN50; KOSO Part Number: 11LBG30AA411 |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
3 |
Christmas-themed packaging/Packing |
1 |
Set |
Materials: P #6710CH, P#6616CH; PN: 12; Valve size: DN 3” - Class 1500; Compatible valve: HRP Branch-L/R Blowdown valve; Drawing number: PFA-67409050-5; Part number: 11LBB10AA422 Okano |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
4 |
Seal/O-ring |
1 |
Female |
Material: INCONEL; Pressure Rating: 14 bar; Valve Size: DN 3" - Class 1500; Compatible Valves: HRP Branch-L/R Blowdown valve; Drawing Number: PFA-67409050-5; Part Number: 11LBB10AA422 Okano |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
5 |
Seal/Gasket |
1 |
Female |
Material: P#2600G; Pressure rating: 13 bar; Valve size: DN 3" - Class 1500; Compatible valve: HRP Branch-L/R Blowdown valve; Drawing number: PFA-67409050-5; Part number: 11LBB10AA422 Okano |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
6 |
Sealing ring / Gasket ring |
1 |
Female |
Material: JPI 7S-23 “D”; Pressure Rating: 06; Valve Size: DN 3” – Class 1500; Compatible Valves: HRP Branch-L/R Blowdown valve; Drawing Number: PFA-67409050-5; Part Number: 11LBB10AA422 Okano |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
7 |
The "Y" shaped input strainer for pumps |
2 |
Set |
- SUS 316 material, DN150, 10k pressure rating; - One filter set consisting of: one filter plus two bolts to connect the filter flanges to a DN150 flange, 10k pressure rating (made in China) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
8 |
Y-shaped arch |
1 |
Female |
Y Globe, Size DN80, Class 2500LBC, 20.2MPa/365°C, Model van: Y Globe PJ55Y-2500LBC-DN80; Manufacturer: Dalian |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
9 |
Y-shaped gate operated by an electric actuator (mechanical part) |
1 |
Female |
Y-shaped valve controlled by an electric actuator (mechanical part); Size: DN80, Class 1690, 20 MPa/365°C; BW SCH. 160; Valve Model: B10-8076Z-02TS- M; Valve length 257mm; valve stem diameter 32mm |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
10 |
DN80 drainage pipe |
0,5 |
Meter |
DN80 (ø88.9 x 11.1 mm), GB3R grade, A106C material, SCH.160, manufactured in Vietnam/China |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
11 |
90-degree angle |
1 |
Female |
90-degree elbow; DN80 (88.9 x 11.1 mm), GB3R class, A106C material, SCH.160, made in Vietnam/China |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
12 |
Protect the spacer |
2 |
Female |
Part number: JMF8280-14; Reference: 4 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
13 |
Disc case |
2 |
Set |
Part number: JMF8280-21; Reference: 5 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
14 |
Bolt driving |
16 |
Female |
Part number: JMF8280-31; Reference: 6 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
15 |
Bolt sleeve |
16 |
Female |
Part number: Ref. 7 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
16 |
Locking nut |
16 |
Female |
Part number: GB889; Reference: 8 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
17 |
Bolt |
32 |
Female |
Part number: JMF8280-41; Reference: 9 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
18 |
Spring washer |
32 |
Female |
Part number: GB93-76; Reference: 10 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
19 |
Screws |
8 |
Female |
Part number: JMF8280-51; Reference: 11 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
20 |
Shipping assistance |
16 |
Female |
Part number: JMF8280-52; Reference: 12 Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
21 |
M8 x 35 |
4 |
Female |
Part number: GB/T68-2000; Reference 13, Sincflex |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
22 |
Pillow case sealing gasket |
1 |
Set |
RTL Seal Kit; Part Number: 435004; (Howden; Fan Model: L4 2079.06.72 SBV6T; Shaft Bearing: 4-15/16") Howden |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
23 |
Gear oil |
10 |
Liter |
Mobil Glygoyle 220 (Mobil brand) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
24 |
The plug and assembly for the PCV valve |
1 |
Set |
The plug and assembly for the PCV valve from GE/MASONEILAN; Model van: **88-41435; Temperature: 482°C, Pressure: 21.67 MPa (including parts 01, 09, 12, 15, 19, and 20) as per the attached GE/MASONEILAN drawings |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
25 |
Tet wrapping / Packaging |
1 |
Female |
Detail number 06; PN: 005675793-932-0000 + 005675793-934-0000 Model van: **88-41435 GE/MASONEILAN** |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
26 |
Spacing washer/Packing spacer |
1 |
Female |
Spacing gasket/Packing spacer; Part number: 05; Valve model: **88-41435; Temperature: 482°C, Pressure: 21.67 MPa; GE/MASONEILAN** |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
27 |
Sealing ring / Body gasket |
1 |
Female |
Details: No. 10; Van type: **88-41435; Temperature: 482°C, Pressure: 21.67 MPa, GE/MASONEILAN** |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
28 |
Sealing ring / Gasket |
1 |
Female |
Sealing ring; part number 11, compatible with: Valve model: **88- 41435, Maximum temperature: 482°C, Pressure: 21.67 MPa GE/MASONEILAN** |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
29 |
Sealing ring / Seat ring gasket |
1 |
Female |
Item number: 14; Valve model: **88-41435; Temperature: 482°C, Pressure: 21.67 Mpa, GE/MASONEILAN** |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
30 |
Sealing gasket / Cage gasket |
1 |
Female |
Item number: 24; Valve model: **88-41435; Temperature: 482°C, Pressure: 21.67 MPa, GE/MASONEILAN** |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
31 |
Long den / Cage washer |
1 |
Female |
Long đen/Cage washer; Part number: 25; Valve model: **88-41435; Temperature: 482°C, Pressure: 21.67 MPa; Manufacturer: GE/MASONEILAN |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
32 |
Guide bush/bushing |
1 |
Female |
Item number: 22; Valve model: **88-41435; Temperature: 482°C, Pressure: 21.67 Mpa, GE/MASONEILAN** |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
33 |
Hydraulic chain conveyor roller |
2 |
Set |
Model LC3 3.25X15E, P/N 307X15E4NC: - The cylinder includes hydraulic fittings and hydraulic tubing connecting the cylinder to the hydraulic distributor, compatible with existing equipment; - The cylinder has a threaded connection for the piston shaft and a compatible actuator mechanism for Nopak equipment. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
34 |
Body of services for raw material input from MMF A (core part) |
1 |
Female |
RWT MMF: Service Inlet Automatic Valve; DN200; Valve Type: A-BFV; Model: 612XC; Body/Disc/Seat Material: FCD450/SCS14/EPDM; ANSI 150#. OKM |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
35 |
HCl output valve to the regeneration spray system |
1 |
Female |
DWT HCl EJECTOR, HCl OUTLET VALVE; DN20; Valve Type: DV; Model: T14; Materials (Body/Disc/Seat): PVC/PTFE; ANSI 150#/FF; Fluid: 4% HCl ASAHI |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
36 |
Raw water inlet valve body |
1 |
Set |
The set includes the following part numbers: 1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12; DW No: 1B0W-41E-DI-E-12 (appendix to drawings on page 3) ACHECH |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
37 |
Water inlet valve transmission box |
1 |
Female |
GEAR O.P (18GAC45 AA101); Number: 16; Material: Ductile Iron; DW No: 1B0W-41E-DI-E-12; (Appendix to drawing on page 3) ACHECH |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
38 |
The galvanized grating is secured with bolts. |
2 |
Female |
Recommended dimensions: 30x640x2500 mm (with two end supports, fixed mounting screws, and a fully reinforced V-shaped steel frame) - Vietnam |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
39 |
The galvanized grating is secured with bolts. |
2 |
Female |
Recommended dimensions: 30x940x2700 mm (with two end supports, fixed mounting screws, and a fully reinforced V-shaped steel frame) - Vietnam |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
40 |
The galvanized grating is secured with bolts. |
4 |
Female |
Recommended dimensions: 30x530x2500 mm (with two end supports, fixed mounting screws, and a fully reinforced V-shaped steel frame) - Vietnam |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
41 |
The galvanized grating is secured with bolts. |
2 |
Female |
Recommended dimensions: 30x990x2500 mm (with two end supports, fixed mounting screws, and a fully reinforced V-shaped steel frame). Made in Vietnam. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
42 |
The galvanized grating is secured with bolts. |
2 |
Female |
Recommended dimensions: 30x600x1770 mm (with two end supports, with screws for fixing, and a fully reinforced V-shaped steel frame around the perimeter). Made in Vietnam. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
43 |
The galvanized grating is secured with bolts. |
2 |
Female |
Recommended dimensions: 30x990x1770 mm (with two end supports, fixed mounting screws, and a fully reinforced V-shaped steel frame). Made in Vietnam. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
44 |
The galvanized grating is secured with bolts. |
2 |
Female |
Recommended dimensions: 30x990x3400 mm (with two end supports, fixed mounting bolts, and a fully reinforced V-shaped steel frame) - Vietnam |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
45 |
The galvanized grating is secured with bolts. |
4 |
Female |
Recommended dimensions: 30x1000x3350 mm (with two end supports, with screws for fixing, and a fully reinforced V-shaped steel frame around the perimeter). Made in Vietnam. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
46 |
The galvanized grating is secured with bolts. |
2 |
Female |
Recommended dimensions: 30x820x3350 mm (with two end supports, fixed mounting screws, and a fully reinforced V-shaped steel frame) - Vietnam |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
47 |
Galvanized steel pipe |
30 |
Meter |
Galvanized steel pipe, diameter 42.2mm x 2.3mm x 6000mm, made in Vietnam/China |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
48 |
Galvanized steel pipe |
22 |
Female |
Welded steel pipe, zinc-plated, diameter 42 mm, made in Vietnam/China |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
49 |
Interzinc 52 epoxy primer |
10 |
Set |
Interzinc 52 epoxy primer, light gray color. Manufacturer: AkzoNobel (International Paint). 5 liters per set (2 components). AkzoNobel |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
50 |
Epoxy primer, Interseal 670 HS |
10 |
Set |
Epoxy primer Interseal 670 HS, RAL 7035, Manufacturer: AkzoNobel (International Paint), 0.5 Liters per set (2-part system) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
51 |
Interthane 990 epoxy coating |
5 |
Set |
Epoxy paint Interthane 990, color RAL 7043, Manufacturer: AkzoNobel (International Paint), 0.5 liters per set (2 components) from AkzoNobel. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
52 |
Interthane 990 epoxy coating |
10 |
Set |
Epoxy paint Interthane 990, color PHB 000, Manufacturer: AkzoNobel (International Paint), 0.5 liter per kit (2 components) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
53 |
Thinner |
5 |
Can |
Thinner for GTA220 Manufacturer: AkzoNobel (International Paint) 5 Liters/can |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
54 |
Thinner |
5 |
Can |
Thinner GTA733 Manufacturer: AkzoNobel (International Paint) 5 Liters/can |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
55 |
ABS DN40 hand valve |
1 |
Female |
ABS DN40 handstop valve; Connection type: ANSI Class 150 end flange (China) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
56 |
Spring-loaded valve |
1 |
Roll |
Special PTFE fiber, manufacturer: Pillar, model 4505L, size 14x14x10000 mm |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
57 |
Y-shaped arch |
1 |
Female |
Y Globe, Size DN20, Class 2500LBP, 19.7MPa/365°C, Model van: Y Globe HJ65Y-2500LBP-DN20; Dr: 129285-1651G-007 Dalian |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
58 |
Cast steel pipes |
0,5 |
Meter |
Steel pipe dimensions: DN20, material A106B, thickness 5.56mm; SCH160 (made in Vietnam/China) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
59 |
Christmas-themed packaging/Packing |
1 |
Set |
Part Number: V368493 (SPX FLOW; 6" (150 mm), CL2500, WCB, BW, SD-1000-320 RA) SPX |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
60 |
Guide bushing |
1 |
Female |
Part Number: V373408 (SPX FLOW; Model: 6" (150mm), CL2500, WCB, BW, SD-1000-320 RA) SPX |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
61 |
Pipe joints |
1 |
Female |
C-55820-012 /10" LA NUV-STL CONN IS PIPE, HIGH TEMP (5.7.2.22) - Ash, Slag, UCC System |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
62 |
Pulley for the fan (fan sheave) |
1 |
Female |
Pulley (fan sheave): Manufacturer: New York Blower, Model: 2304A-2604A, New York Blower |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
63 |
Valve |
1 |
Female |
GLOBE VALVE; Part number: 22376467, Diameter: 9.53 SW Fluid/Medium: steam, water Piping: socket welding (9.53 SS tube), Pressure Ratings: 30.4 MPa (490°C); 24.5 MPa (574°C); 34.3 MPa (400°C) NIKKISO |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
64 |
High-pressure cable set |
1 |
Set |
A 20-meter long high-pressure cable, with a built-in anti-twist connector, for use with the Quadro 800 TST pump. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
65 |
Nozzle set for the Quadro 800 TST pump |
1 |
Set |
Nozzles for the Quadro 800 TST pump |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
66 |
Set of pliers with a handle |
1 |
Female |
Chinese MT4-B16 type spanner set with handle |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
67 |
Set of pliers with a handle |
1 |
Female |
Chinese MT3-B13 handle clamp set |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
68 |
Edge-bending machine guide rails |
1 |
Set |
PREP3 Tag edge beveling machine axis holders |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
69 |
Black hexagonal wrench |
1 |
Set |
BondHus 10992 Hex Key Set (1.5mm – 6mm): (Set of L-shaped hex keys with one flat end and one hexagonal end, Size: 1.5 - 6mm (7 pieces), Stainless steel material) BondHus |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
70 |
Nine-piece chrysanthemum arrangement |
1 |
Set |
Goodman 9-piece flower head set T6-T7-T8-T9-T10-T15-T20-T25-T27mm: (Goodman GM804-9 hexagonal flower head set, consisting of 9 heads: T6-T7-T8-T9-T10-T15-T20-T25-T27. Material: Corrosion-resistant chrome vanadium steel. Size: 75mm x 156mm x 12mm) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
71 |
Spanner wrench |
1 |
Female |
Ega Master 38111: 27mm Open-End Wrench – Stainless Steel 420 Material – Size: 27mm – Length: 290mm. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
72 |
Spanner wrench |
1 |
Female |
30mm Open-End Wrench: "Ega Master 38114 Stainless Steel Open-End Wrench - Material: 420 Stainless Steel - Size: 30mm - Length: 320mm" Ega Master |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
73 |
Adjustable wrench (2-in-1) |
1 |
Female |
Two-way open wrench, 5.5x 7mm: Sata 41-216 two-way open wrench - Size: 5.5 x 7mm - Length: 124.9mm - High-quality CR-V steel material from Sata |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
74 |
Adjustable wrench (2-in-1) |
1 |
Set |
Two-way adjustable wrench, 12 x 13mm: Sata 41-303 two-way open-end wrench - Size: 12 x 13mm - Length: 174.2mm - High-quality CR-V steel |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
75 |
Two-headed wrench |
2 |
Set |
6-32mm Cr-V two-way open-end wrench: Kingtony 1112MR - 6/7-30/32mm * Product dimensions: 6 x 7; 8 x 9; 10 x 11; 12 x 13; 14 x 15; 16 x 17; 18 x 19; 20 x 22; 21 x 23; 24 x 27; 25 x 28; 30 x 32. High-quality Kingtony Cr-V steel |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
76 |
Belt Wrench, 50mm diameter |
3 |
Female |
Fervi 0352: 50 mm chain wrench with a rubber-coated handle that is resistant to chemicals. This wrench is specifically designed for removing oil filters and plastic containers. The rubber-coated handle provides good grip on the palm. The wrench body is made of Chrome Vanadium steel, nickel-plated for corrosion resistance. The chain is made of synthetic fibers and has multiple layers. Chain length ≥ 610mm. Opening diameter ≥ 50 mm |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
77 |
12-inch claw hammer |
3 |
Female |
12-inch Pliers: 12-inch Ega Master 61113 Titacrom coated pliers. Length: 300mm. Jaw opening: 33mm. Made from special Ega Master steel. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
78 |
8-inch scraper |
1 |
Female |
8-inch Titacrom Ega Master 61111 Spanner: Length: 200 mm, Opening: 24 mm, Weight: 280 grams. The spanner body is made of robust forged and hardened steel. The spanner is coated with Titacrom to increase hardness and durability. A laser-engraved ruler is integrated into the handle. The spanner is manufactured from special Ega Master steel. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
79 |
Two-way cooking pot |
4 |
Female |
Two-way screwdriver: Model: 66204, SATA 66204 (6x100mm). Type: One flat head (-), one Phillips head (+). Size: 6x100mm. SATA |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
80 |
Set of two-headed screwdrivers |
1 |
Set |
Stanley 65-201 Two-Way Ratcheting Screwdriver Set: This set includes two ratcheting screwdrivers with a total length of 200mm (#8 x 7.8"). One screwdriver has a PH2 head (4"), while the other has a 6mm (1/4") flathead. Both screwdrivers have non-slip, ergonomic handles made from composite plastic. The blades are made of hardened chrome-plated steel. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
81 |
L-shaped block set |
1 |
Set |
L-shaped Allen wrench set (hex key) (1.5-10mm): A set of 9 CR-V steel hex keys with L-shaped heads. Item code: WP222011 - Brand: Workpro - Made in China - Specifications: L-shaped hex key set, 9 pieces, metric system (1.5, 2, 2.5, 3, 4, 5, 6, 8, 10mm), CR-V alloy steel - Workpro CR-V alloy |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
82 |
A set of 13 hand tools |
2 |
Set |
The Kingtony 13-Piece Multi-Purpose Hand Tool Set includes: - 5 hex keys ranging from 2 to 5mm - 3 screwdriver heads - 1 Phillips head screwdriver - 1 flathead screwdriver - 1 combination wrench (8, 10, 15 mm) Dimensions: 9cm x 5cm x 3cm. Material: High-strength stainless steel. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
83 |
Set of 2 automatic lenses |
2 |
Set |
Set of 2 Self-Adjusting Wrenches – Automatic Reversing & Shaking Function – C-Mart T001, High Quality – Material: Hard CR-V Steel – 2-Tooth Ratchet Mechanism with 12 Teeth per Rotation, Compatible with Various Sizes – Model: T0011-A – Includes 5 Separate Hexagonal Heads (8 - 10 - 12 - 13 - 17mm) – C-Mart |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
84 |
12mm hexagonal nut |
3 |
Female |
12mm Hexagon "L" Head Screw, Ega Master 65307
Size: 12 mm
Material: CR-V
European Standard Compliant: DIN ISO 2936/DIN 911
Hardness: 52 HRc
Two-ended hexagon screw
Length: 135mm |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
85 |
Hexagonal pattern |
2 |
Female |
COLOR-CODED, LONG-HEADED, 10MM HEX KEY, PB SWISS TOOLS 627140 (PB 212.L 10 BL)
10mm Hex Key: Overall dimensions: 230x46mm; Surface: Electroplated; Material: Special alloy from PB Swiss Tools; Long-headed type. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
86 |
Multi-purpose wrench |
2 |
Female |
Product Name: Universal 8-Position Rotating Wrench, 360 Degree Rotation, Super Durable, 52 in 1 • Material: High-quality CRV steel (Chrome-Vanadium) • U-shaped wrench head sizes: 8mm, 10mm, 11mm, 13mm, 14mm, 16mm, 17mm, 19mm • Wrench length: 25cm Vietnam |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
87 |
Open-end wrench set |
2 |
Set |
Deli's 14-Piece High-Quality CR-V Open-End Wrench Set: Corrosion-Resistant, Versatile Tool Set
This set includes 14 high-quality CR-V open-end wrenches in sizes ranging from 6 to 24mm. The wrenches are chrome-plated for a bright finish and corrosion resistance, and are also very durable. Common sizes included (e.g., 6, 8, 10, 12, 14, 17, 19, 22, 24mm...) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
88 |
Spanner wrench |
2 |
Set |
Kingtony Open-End Wrench, 1060-30, 30mm – Specifications:
– Product Code: 1060-30
– Manufacturer: Kingtony
– Origin: Taiwan
– Material: Chrome Vanadium Alloy Steel
– Certifications: ISO 7738, DIN 3113
– Wrench Type: Open-end wrench, single head
– Size: 30x345mm |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
89 |
Spanner wrench |
2 |
Female |
Kingtony Open-End Wrench, 1060-32, 32mm – Specifications:
– Product Code: 1060-32
– Manufacturer: Kingtony
– Origin: Taiwan
– Material: Chrome Vanadium Alloy Steel
– Certifications: ISO 7738, DIN 3113
– Type: Open-end wrench, 1 head
– Size: 32x365mm |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
90 |
Spanner wrench |
2 |
Female |
Technical Specifications: Kingtony 1060-36 Open-End Wrench, 36mm Size: 36mm – Made from Chrome-Vanadium Alloy Steel – Type: Single Open End, Single Socket (Kingtony) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
91 |
Emergency eye wash kit |
1 |
Set |
Model: EPE-4/15 (China) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
92 |
12mm screw |
4 |
Female |
12mm Hexagon "L" Head Screw, Ega Master 65307
Size: 12 mm
Material: CR-V
European Standard Compliant: DIN ISO 2936/DIN 911
Hardness: 52 HRc
Two-ended hexagon screw
Length: 135mm |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
93 |
14mm lens |
4 |
Female |
L-shaped Hex Key, 14mm, Ega Master 65308. Size: 14mm. Material: CR-V. Meets European Standards: DIN ISO 2936/DIN 911. Hardness: 52 HRc. Two-ended hexagonal key. Length: 155mm. Ega Master |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
94 |
8-inch claw hammer |
4 |
Female |
8-inch Titacrom Ega Master 61111 Spanner: Length: 200 mm, Opening: 24 mm, Weight: 280 grams. The spanner body is made of robust forged and hardened steel. The spanner is coated with Titacrom to increase hardness and durability. A laser-engraved ruler is integrated into the handle. The spanner is manufactured from special Ega Master steel. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
95 |
10" wrench |
5 |
Female |
Ega Master 61942, 10-inch multi-purpose wrench with Titacrom coating. Wrench length: 250 mm. Jaw opening for bolts: 29 mm. Jaw opening for pipes: 1.1/4". Made from special Ega Master steel. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
96 |
12-inch claw hammer |
2 |
Female |
12-inch Titacrom Ega Master 61113 Claw Hammer: Length 300mm, Opening 33mm. Made from special Ega Master steel. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
97 |
Electric pliers |
4 |
Female |
Brand: C-MART - Model: B0054-08 - Size: 200mm - Pliers are made of high-strength CR-V steel - Handles are covered with premium plastic, providing a non-slip grip - Size: 8” (200mm) C-MART |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
98 |
Screwdriver set (2-sided + 4-sided) |
1 |
Set |
TOLSEN Insulated Screwdriver Set 38012: Material: CrV (Chrome Vanadium). Includes: 0.5x3x75mm, 0.8x4x100mm, 1.0x5.5x125mm, PH1x80mm, PH2x100mm. TOLSEN |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
99 |
AC/DC current measuring clamp meter |
1 |
Female |
Ampe kìm for measuring AC/DC current (FLUKE 374), with a capacity of 600A, TRUE RMS measurement.
DCA: 600A /0.1 A /2% ± 5 digits
ACV: 600V /0.1 V /1.5% ± 5 digits
DCV: 600V /0.1 mV /1% ± 5 digits
R: 60,000 Ω /0.1 Ω/1% ± 5 digits
F: 500 Hz /0.1 Hz /0.5% ± 5 digits
C: 1 µF to 1000 µF /1 µF /1% ± 4 digits |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
100 |
Insulation resistance meter |
1 |
Female |
HIOKI IR4056-21 Insulation Resistance Meter: Test Voltages: 50V/125V/250V/500V/1000VDC, Resistance: 100MΩ/250MΩ/500MΩ/2000 MΩ/4000MΩ. Features include circuit testing, automatic discharge, AC/DC detection, comparison function, and automatic power-off. Power source: LR6 (AA) x 4 |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
101 |
Lance tube |
1 |
Female |
Material: BW6330 Diameter: 102mm Length: 13590mm; Used for the IK545 dust blowing nozzle from Clyde Bergemann DPMH. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
102 |
Feed tube |
1 |
Female |
Part No: 310635-1137; Inner Diameter: 60mm; Material: 321 SST, Compatible with IK-545 dust extraction nozzles. Clyde Bergemann DPMH |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
103 |
Column support for HGT dust blower nozzles |
3 |
Female |
Part number 343444-1121, Clyde Bergemann DPMH |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
104 |
Seal |
3 |
Female |
Part number 907920-0061, Clyde Bergemann DPMH |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
105 |
Seal |
3 |
Female |
Part number 907920-0052, Clyde Bergemann DPMH |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
106 |
Gear-type oil pump |
6 |
Female |
Model: PGP511A0140CL6H2N E6E5B1B1 Parker Siemens |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
107 |
Valve |
1 |
Set |
Globe valve, NPS 1 ½'' (DN40), Class 2500, Design operating pressure: 19.65 MPa / 365°C, Figure number: W07-4105Y-02TS-M, Used as a replacement for the continuous discharge valve for steam jackets. Velan |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
108 |
Cast steel pipe |
1 |
Meter |
A106B cast steel pipe, 48.4 x 10.5 x 1000 mm, DN40, SCH XXS, Class AA3R, Made in Vietnam/China |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
109 |
Non-corrosive slag deflector plate for furnaces |
14 |
Female |
Non-corrosive bottom furnace grate, part number 492519-1, Flight-max SFC, materials A38 & A500 (made in Vietnam) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
110 |
Bottom slag deflector with a corrosion-resistant electrode |
24 |
Female |
Electric-powered slag removal bar, type with corrosion-resistant electrodes, part number 492519-4, Flight-max SFC, materials A38 & A500 (Vietnam) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
111 |
Drill bit shank |
2 |
Female |
46.0mm drill bit shank, Model 602-466; Material: HSS Nachi |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
112 |
Set of Taro Ren needles for transplanting |
2 |
Set |
RE-HT M56x5.5 ISO2 2P Yamawa threaded nose cone |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
113 |
Output signal from the MMF turbidity meter |
1 |
Female |
RWT MMF OUTLET TURBIDITY CONTROL VALVE; DN25; Valve Type: NV; Material: Body/Disc/Seat: PVC/EPDM; ANSI 150#/FF; Fluid: Filtered Water, ASAHI |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
114 |
Y-shaped arch |
1 |
Female |
Y Globe, Size DN80, Class 2500LBC, 20.2MPa/365°C, Model van: Y Globe PJ55Y-2500LBC-DN80; Dr: 129285-1651G-028 Dalian |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
115 |
Drain pipe |
0,5 |
Meter |
DN80 discharge pipe (88.9mm x 11.1mm), GB3R standard, A106C material, SCH.160, manufactured in Vietnam/China. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
116 |
Chain-linked ship bottom |
6 |
Female |
Chain link anchor for slag bottom: - PN 492525-2 - 38 links per set, - Model: Pewag hero friction welded chain; - Size: 26x100 (diameter x width), 100mm pitch - Chain length 167mm. Pewag |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
117 |
Dry ship shaft bearing assembly |
4 |
Set |
The dry ship slag shaft bearing set (including: 1 bearing + 1 spacer) is installed on the dry ship slag shaft (PN: 2-492076). The bearing set (including: 1 bearing + 1 spacer) is compatible with PN references 405104-3 & 405104-4, dw 5-4920-29, manufacturer: UCC |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
118 |
Gearbox housing |
1 |
Female |
Gear case, part number 17, compatible with model: CM-22R-VV46-A40-ZO44, Tohkemy |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
119 |
First planetary gear |
6 |
Female |
First planetary gear, detail number 5; compatible with model: CM-22R-VV46-A40-ZO44 from Tohkemy |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
120 |
Second planetary gear |
6 |
Female |
Second planetary gear, part number 6; compatible with model: CM-22R-VV46-A40-ZO44 from Tohkemy |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
121 |
Bearings |
1 |
Female |
NSK 629, (part number 8), or an equivalent NSK part |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
122 |
Bearings |
1 |
Female |
NSK 6303, (part number 13), or an equivalent NSK part |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
123 |
Support brackets and rollers for the IK545 dust blower |
1 |
Set |
Accessories and rollers for the IK545 dust blower: includes parts from 01 to 34; Pre-assembled according to specifications; (refer to attached drawings) IK545 LANCE AND FEED TUBE AUXILIARY SUPPORT ASSY PN: 349801-0044 Clyde Bergemann DPMH |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
124 |
Vacuum pump isolation method 2AB |
2 |
Set |
Vacuum isolation valve 2AB. – Manufacturer: Intervalve, size 300, ACT + MO model: PD500+Moil, UCC (I) part no 55820-01-233 - The valve includes: Valve body, integrated control and drive mechanism attached to the valve, ASME B16.5 #150 two-flanged end connections. Intervalve |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
125 |
Pump for coal pulverization system |
2 |
Female |
Barrel pump for coal pulverization system (including the suction inlet filter and two threaded connections to the new pump design). Model F302 Bijur delimon |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
126 |
Lance tube |
1 |
Female |
Item: 6; Part No: 347139-0041; Model: IK-525; Contract: 1502003; Travel: 5.46m; Speed: 3.6 m/min; Used for Clyde Bergemann DPMH Dust Blow Nozzle |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
127 |
Feed tube |
1 |
Female |
D60xL6000mm; Model: IK-525; Contract: 1502003; Travel: 5.46m; Speed: 3.6 m/min; Used for Clyde Bergemann IK525 Dust Blowers |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
128 |
Rubber support strap for TT6 vibrating funnel |
18 |
Meter |
Outer diameter of 32 mm x Inner diameter of 13 mm, with a central groove approximately 3 mm wide. Material: Vietnam-made NBR rubber. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
129 |
Square |
6 |
Female |
Dimensions: 200x200 mm, suitable for rubber tubing used in the TT6 vibrating funnel; Outer diameter: 32 mm x Inner diameter: 13 mm, with a single vertical groove approximately 3 mm wide. Material: Vietnam-made NBR rubber. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
130 |
The letter "Y" |
1 |
Female |
Y-GLOBE, Size DN40, Class 1690 LTD, 19650kPa/382.2oC, Model: W07-8076Z-02TS-M; Dr: P011-890065-007 Velan |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
131 |
Coal division |
27 |
Female |
Material: XAR500. Used for the double cyclone burner of the Foster Wheeler brand. Detailed specifications are available in the attached drawings from Vietnam. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
132 |
Protective cover for the ash separator box |
48 |
Sheet |
Dimensions: 457 x 575 x 10mm, Material: BW450 (made in Vietnam) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
133 |
Coal splitter with a central support |
15 |
Sheet |
Dimensions: 457 x 127 x 20. Material: SA36 (Vietnamese standard) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
134 |
Coal dust separator gasket |
27 |
Female |
Outer dimensions: 620 x 563 mm, inner dimensions: 486 x 484 mm. Thickness: 3mm. 26 holes with a diameter of 17mm. Material: Garlock Grap-Lock 3125SS (made in Vietnam) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
135 |
M16 magazine |
420 |
Female |
M16 8.8 (Vietnam) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
136 |
Oil sprayer |
48 |
Set |
Including two components: - Mixing chamber: OD35; material TP310S ASTM A312. - Chemical injection nozzle: Material 35NiCrMoV12-5 EN 10060. (Components as per attached drawings) Vietnam |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
137 |
Hydraulic chain tensioner for barges |
1 |
Set |
A408-129-A06 hydraulic chain tensioner kit, including: control unit, hydraulic splitter, operating handle, pressure gauge, oil lines, fittings, and accessories that connect to the cylinder, and the hydraulic pump for the system controlling the chain tensioning cylinder. Sun Hydraulics |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
138 |
The ash intake pipe |
1 |
Female |
55820-1812-13-1010101-01-2000 / INTAKE-FA, 12" X 10", SRP, RH, AC (SP 5.5.7) Ash, Slag, UCC system |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
139 |
HCl output valve to the regeneration spray system |
1 |
Female |
DWT HCl EJECTOR, HCl OUTLET VALVE; DN20; Valve type: DV; Model: T4; Body/Disc/Seat Material: PVC/PTFE; ANSI 150#/FF; Fluid: 4% HCl; Manufacturer: PRAHER or equivalent. Appendix with drawings included. PRAHER |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
140 |
Vacuum pump |
3 |
Female |
Pully vacuum pump, manufacturer: Kakati, model: KVL 900, size: V-pulley, 1000 PCD x5 SPC, Dw: KKI/KV900/ 22 41 15. - The pulley is compatible for installation with the pump on site and includes all necessary pulleys and mounting bolts. Kakati |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
141 |
Engine pump drive pulley |
3 |
Female |
Engine drive pump pulley, manufacturer: Kakati, model: KVL 900, size: V-pulley, 350 PCD x5 SPC, Dw: KKI/KV900/ 22 41 15. - Pulley compatible for installation with the engine on site, including all Kakati mounting pulleys and bolts. |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
142 |
Pressure-compensated air bladder control system |
1 |
Female |
Bladder, Part Number: 2, Material: Synthetic Rubber, Compatible with: Model: NF-N21MP-L60-AAC; Manufacturer: NACOL (Nippon Accumulator - Japan) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
143 |
O-ring |
1 |
Female |
JIS B2401 O-ring, Material: Synthetic rubber, Part Number: 11, Compatible with: Model: NF-N21MP-L60-AAC; Manufacturer: NACOL (Nippon Accumulator - Japan) NACOL |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
144 |
O-ring |
1 |
Female |
O-ring, AS56BA 009, Material: Synthetic rubber, Part Number: 12, Compatible with: Model: NF-N21MP-L60-AAC; Manufacturer: NACOL (Nippon Accumulator - Japan) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
|
145 |
O-ring |
1 |
Female |
JIS B2401 G75 O-ring, Material: Synthetic rubber, Part Number: 61, Compatible with: Model: NF-N21MP-L60-AAC; Manufacturer: NACOL (Nippon Accumulator - Japan) |
Thai Binh Thermal Power Plant – Address: Thai My Village, Dong Tai Commune, Ninh Giang District, Hung Yen Province. |
According to the manufacturer's regulations |
- All products are 100% new and manufactured from 2025 onwards. - The warranty period for the products is at least 18 months from the date of delivery. - The contractor must be present on site within 24 hours of being notified of a defect in the product, to work with the client to determine the cause and propose a solution. - Once the defect has been confirmed, the contractor is responsible for repairing or replacing all defective products within 10 days of receiving notification from the client. The contractor will be fully responsible for all costs associated with correcting the defect, including but not limited to: labor costs, material preparation, equipment for transportation, dismantling, installation, testing, calibration, and other incidental expenses. During the warranty period, if any product is damaged, fails to meet quality standards, or does not meet technical requirements, the contractor must repair or replace it according to the client's request. For items/parts that have been repaired or replaced, the warranty period will be recalculated from the date the replacement/repair was made and put into use, but no less than 18 months from the original delivery/acceptance date. |
Select columns to display
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Similar goods purchased by Investor THAI BINH THERMAL POWER COMPANY:
No similar goods purchased by the Investor were found.
Similar goods purchased by other Investor excluding THAI BINH THERMAL POWER COMPANY:
No similar goods have been found that other Investor have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.