Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Click to view DauThau.info's analysis (you will be deducted 2 points).
To view full information, please Login or Register
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Adjusted bid price after excess deviation correction | Bid package execution period | Contract Period | Contract date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | vn3901243483 | 3901243483 |
CÔNG TY TNHH XÂY DỰNG - CẦU ĐƯỜNG NAM PHÁT |
3.781.493.354 VND | 3.781.493.354 VND | 3.781.493.354 VND | 120 day | 120 days |
| Number | Business Registration ID ( on new Public Procuring System) | Tax ID | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|---|
| 1 | vn3901261355 | 3901261355 | CÔNG TY TRÁCH NHIỆM HỮU HẠN THI CÔNG XÂY DỰNG LÊ PHÁT | *Technical solutions for construction work according to the technical and economic report, involving both construction and excavation: - Explanation of unsuitable methods such as clearing with heavy machinery, removing trees by digging up roots - Excavation work: not excavating drainage ditches or foundations - Drainage: After completing the foundation pit excavation, pouring concrete for the foundation but the design does not include pouring concrete for the foundation, instead using a gravel foundation layer. - Incompatible drawings: Equipment drawings do not meet the requirements of E-HSMT. - Construction progress: A 120-day construction schedule (excluding time for relocating power poles) |