Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn0300403987 |
NATIONAL GENERAL CONSTRUCTION CONSULTING JOINT STOCK COMPANY |
1.080.000.000 VND | 92.3 | 1.080.000.000 VND | 36 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn0300422884 | ARCHITECTURE AND CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY | Through review, the contractor provided documents but did not meet the E-HSMT, so the Procuring Entity sent Official Dispatch No. 2713/DDCN-KHDT dated October 15, 2024 on clarifying the E-HSDKT. On October 16, 2024, the Contractor sent a clarifying response letter No. 205/2024/CV-ACCCO and attached documents via the National Bidding Network System. After evaluation, the Contractor had a total technical score of 64.5 points < 70 minimum required points, in addition, the contractor did not reach the minimum required score for the content of Solution and methodology. | |
| 2 | vn0310829703 | DSPCONS MANAGEMENT VIETNAM LIMITED COMPANY | Through review, the contractor provided documents but did not meet the E-HSMT, so the Procuring Entity sent Official Dispatch No. 2712/DDCN-KHDT dated September 16, 2024 on clarifying the E-HSD. At the end of the clarification period, DSPCons Vietnam Management Company Limited did not respond to clarify. After evaluation, the Contractor had a total technical score of 71.25 points, however the contractor did not reach the minimum required score for the content of Solution and methodology. |