Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register
Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
---|---|---|---|---|---|---|---|---|
1 | vn0312426121 | Liên danh Công ty Cổ phần Khảo sát Thiết kế và Xây dựng Thịnh Hoàng Phát - Công ty TNHH Xây dựng Hạ tầng Kỳ Nam | THINH HOANG PHAT SURVEY DESIGN AND CONSTRUCTION CORPORATION |
1.746.500.000 VND | 79.6 | 1.746.500.000 VND | 45 day | |
2 | vn0314067492 | Liên danh Công ty Cổ phần Khảo sát Thiết kế và Xây dựng Thịnh Hoàng Phát - Công ty TNHH Xây dựng Hạ tầng Kỳ Nam | CÔNG TY TNHH XÂY DỰNG HẠ TẦNG KỲ NAM |
1.746.500.000 VND | 79.6 | 1.746.500.000 VND | 45 day |
Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for bid slip |
---|---|---|---|---|
1 | vn1100575758 | LONG AN HYDRAULIC ENGINEERING CONSULTING JOINT STOCK COMPANY | The contractor received a total technical score of 45 points < Minimum score: 75 points. At the same time, the contractor did not meet the minimum score in key personnel criteria: 16 points < Minimum score: 35 points. | |
2 | vn0315123076 | HOANG KIM CONSULTANT CONSTRUCTION CO.,LTD | The contractor received a total technical score of 5.6 points < Minimum score: 75 points. At the same time, the contractor does not meet the minimum score in the criteria of methodological solutions: The contractor is evaluated to pass: 5.6 points < Minimum score: 21 points and key personnel: The contractor is evaluated to pass : 0 points < Minimum score: 35 points. | |
3 | vn0316889635 | TRUNG NAM CUONG CONSULTANT CONSTRUCTION COMPANY LIMITED | The contractor received a total technical score of 16 points < Minimum score: 75 points. At the same time, the contractor does not meet the minimum score in the criteria of methodological solutions: The contractor is evaluated to pass: 16 points < Minimum score: 21 points and key personnel: The contractor is evaluated to pass: 0 score < Minimum score: 35 points. |
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.