Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn5801371051 |
CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ TOÀN HẢO |
3.448.734.735 VND | 3.448.734.735 VND | 60 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn5801221232 | CÔNG TY TNHH TÚ THỌ LỘC | Criteria 1.A; 3.a; 4.A; 4.D and 5.A of the contractor do not respond: 1.A. The contractor has no proposal to the overall construction plan according to the main items: (1) Construction of the road; (2) Construction of the road surface; (3) Construction of round sewers; (4) Traffic safety; (5) Ditch knitting with bearing force; (6) Construction of vertical and assembled ditches + No explanation of detailed construction solutions for each work item including ((1) construction of roads; (2) construction of the road surface; (3) constructing circular sewers; (4) Traffic safety construction; (5) Ditch with bearing force; (6) construction of vertical and assembled ditches;) 3.A. There is no explanation to clearly show the contractor's project management system 4.A. There is no explanation of the way and measures to ensure quality during the construction process for the main items including: (2) Construction of the road surface; (3) Construction of round sewers; (4) Traffic safety; (5) Ditch knitting with bearing force; (6) Construction of vertical and assembled ditches. 4.D. There is no measure to ensure labor safety and safety equipment for each main item including: (2) Construction of the road surface; (3) Construction of round sewers; (4) Traffic safety; (5) Ditch knitting with bearing force; (6) Construction of vertical and assembled ditches. 5.A. There is no commitment or explanation for equipment that manufacturers or suppliers ... have regulations on warranty period, the warranty period for such equipment must be dark as the warranty period of manufacturers and suppliers. |