Package 03: Construction cost

        Watching
Tender ID
Views
8
Contractor selection plan ID
Bidding package name
Package 03: Construction cost
Bidding method
Online bidding
Tender value
3.470.734.733 VND
Publication date
11:33 26/06/2025
Contract Type
All in One
Domestic/ International
Domestic
Contractor Selection Method
Single Stage Single Envelope
Fields
Constructions
Approval ID
KQ2500280576_2506261119
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Decision-making agency
People's Committee of Da Quyn commune
Approval date
26/06/2025
Tendering result
There is a winning contractor
List of successful bidders
Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Bid price Technical score Winning price Delivery time (days) Contract date
1 vn5801371051

CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ TOÀN HẢO

3.448.734.735 VND 3.448.734.735 VND 60 day
List of unsuccessful bidders:
Number Business Registration ID ( on new Public Procuring System) Consortium Name Contractor's name Reason for failure
1 vn5801221232 CÔNG TY TNHH TÚ THỌ LỘC Criteria 1.A; 3.a; 4.A; 4.D and 5.A of the contractor do not respond: 1.A. The contractor has no proposal to the overall construction plan according to the main items: (1) Construction of the road; (2) Construction of the road surface; (3) Construction of round sewers; (4) Traffic safety; (5) Ditch knitting with bearing force; (6) Construction of vertical and assembled ditches + No explanation of detailed construction solutions for each work item including ((1) construction of roads; (2) construction of the road surface; (3) constructing circular sewers; (4) Traffic safety construction; (5) Ditch with bearing force; (6) construction of vertical and assembled ditches;) 3.A. There is no explanation to clearly show the contractor's project management system 4.A. There is no explanation of the way and measures to ensure quality during the construction process for the main items including: (2) Construction of the road surface; (3) Construction of round sewers; (4) Traffic safety; (5) Ditch knitting with bearing force; (6) Construction of vertical and assembled ditches. 4.D. There is no measure to ensure labor safety and safety equipment for each main item including: (2) Construction of the road surface; (3) Construction of round sewers; (4) Traffic safety; (5) Ditch knitting with bearing force; (6) Construction of vertical and assembled ditches. 5.A. There is no commitment or explanation for equipment that manufacturers or suppliers ... have regulations on warranty period, the warranty period for such equipment must be dark as the warranty period of manufacturers and suppliers.
You did not use the site, Click here to remain logged. Timeout: 60 second