Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Bid price | Technical score | Winning price | Delivery time (days) | Contract date |
|---|---|---|---|---|---|---|---|---|
| 1 | vn1200578664 |
CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG BÁCH KHOA |
8.986.591.673 VND | 8.986.000.000 VND | 180 day |
| Number | Business Registration ID ( on new Public Procuring System) | Consortium Name | Contractor's name | Reason for failure |
|---|---|---|---|---|
| 1 | vn1200939670 | CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XÂY DỰNG MINH THÁI | Ranking II | |
| 2 | vn1200472883 | CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI THÁI BẢO | Invalid bidding guarantee letter: not the right name of the package and the name of the beneficiary unit, does not meet the requirements of E-HSMT | |
| 3 | vn1200359782 | CÔNG TY TRÁCH NHIỆM HỮU HẠN THUẬN PHÚ | - Measures for construction of the road yard (p. 94.95- Thuyet Minh Ky That.PDF) Contractor of the explanation is not reasonable, not suitable for the scale and nature of the bidding package according to the approved design dossier (Terrazzo tiled road yard does not have technical requirements such as explanations), does not meet the requirements of E-HSMT in Section 1.2.3. CONSTRUCTION MEASURES, SECRETS 3.2. Evaluation according to the method of achieving/failing, Section 3. Technical evaluation criteria - Chapter III. E-HSDT evaluation criteria of E-HSMT. - Drawings of typical road construction measures (page 33- BPTC Xuan Dieu.PDF) Contractor for the construction of construction measures that are not suitable to the technical requirements of E-HSMT, specifically: The contractor arranges the construction machine construction machine including the equipment: excavators, trucks, 25T vibrating cars, bulldozers; unreasonable, not suitable for the scale and nature of the approved design records (Terrazzo tiled road yard, there is no requirement to use excavators, dump trucks, 25T vibrating rollers, bulldozers) in section 1.2.3. CONSTRUCTION MEASURES, SECRETS 3.2. Evaluation according to the method of achieving/failing, Section 3. Technical evaluation criteria - Chapter III. E-HSDT evaluation criteria of E-HSMT. - Chart of mobilizing motorbikes and construction equipment: The contractor mobilizes excavators and bulldozers to execute the road items that are not suitable for the scale and nature of the approved design documents (Terrazzo tiled road yard) at Section 2 of the construction progress, Section 3.2. Evaluation according to the method of achieving/failing, Section 3. Technical evaluation criteria - Chapter III. E-HSDT evaluation criteria of E-HSMT. |