Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG are as follows:
You need to Login or Sign up to view all informations.
- Participated in 39 bidding packages, of which 38 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 93.31% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.66% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Thái Bình (25), Undefined (14)
- Has relationships with 20 Bid Solicitors
- Has competed against 10 contractors in 12 bidding packages, won 11 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 7 contractors in 14 bidding packages, won 14 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: Công ty cổ phần xây dựng Minh Trung
- Construction capacity certificate code: 00005470
- Issuing Authority: Nơi cấp Sở Kế hoạch và đầu tư Thái Bình
- Field:
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: giao thông đường bộ
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 3 | 7.9% |
Lower by 0% to 1% | 33 | 86.8% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 2 | 5.3% |
Unknown | 0 | 0% |
Total | 38 | 100% |
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG Won the bidding for the Package No. 10: Construction and ensuring construction traffic safety package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP ĐỨC THÀNH through an Open bidding as an independent entity.
- Result: Won
01/10/2024 08:08
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG Won the bidding for the Package No. 09: Construction work package, which was invited for bidding by the Công ty TNHH thương mại dịch vụ và xây dựng Ngọc Sơn through an Open bidding as an independent entity.
- Result: Won
19/07/2024 20:37
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG lost the bidding for the Tender package No 04: Construction work package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP ĐỨC THÀNH through an Open bidding as master consortium of CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG. Three other contractors also participated.
- Result: Lost
07/06/2024 14:18
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG Won the bidding for the Package 08: Construction work package, which was invited for bidding by the Công ty TNHH thương mại dịch vụ và xây dựng Ngọc Sơn through an Open bidding as an independent entity.
- Result: Won
19/05/2024 08:53
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG Won the bidding for the Package 06: Construction work package, which was invited for bidding by the DONG PHONG TRADING AND INVESTMENT CONSULTANT CORPORATION through an Open bidding as an independent entity.
- Result: Won
17/11/2023 15:00
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG Won the bidding for the Package 06: Construction work package, which was invited for bidding by the TBCO CONSTRUCTIONS & TRADE COMPANY LIMITED through an Open bidding as master consortium of CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG. One other contractors also participated.
- Result: Won
22/05/2023 10:19
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG Won the bidding for the Package 12: Construction of Phase 1 works (Section 1 of the main line from Km0+00 to Km3+788.16) and ensure traffic safety package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP ĐỨC THÀNH through an Open bidding as master consortium of CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG. One other contractors also participated.
- Result: Won
17/05/2023 11:16
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG Won the bidding for the Package 17: Supply and installation of equipment for substations package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP ĐỨC THÀNH through an assign bid as an independent entity.
- Result: Won
26/04/2023 09:11
CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG Won the bidding for the Tender package No 04: Construction work package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP ĐỨC THÀNH through an Open bidding as master consortium of CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG. One other contractors also participated.
- Result: Won
09/03/2023 15:16
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG participated in 39 package, of which 38 package was won, failed 1 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG is related to 20 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG competed with 10 contractors in 12 package, won 11 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG once entered into a partnership with 7 contractors in 14 package, won bid 14 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY CỔ PHẦN XÂY DỰNG MINH TRUNG participated in bidding in 1 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code