Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors \ are as follows:
You need to Login or Sign up to view all informations.
- Participated in 46 bidding packages, of which 43 were won, 2 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 97.77% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 103.32% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (41), Undefined (5)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (41), Undefined (7)
- Has relationships with 17 Bid Solicitors
- Has competed against 19 contractors in 16 bidding packages, won 13 packages, lost 2 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 17 contractors in 22 bidding packages, won 21 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 1 | 2.3% |
| Lower by 0% to 1% | 41 | 95.3% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 2.3% |
| Unknown | 0 | 0% |
| Total | 43 | 100% |
\ Won the bidding for the Tender package No 03: Construction package, which was invited for bidding by the Ban Quản lý dự án Đầu tư - Hạ tầng xã Hồng Sơn through an Open bidding as an independent entity.
- Result: Won
29/12/2025 11:50
\ Won the bidding for the Package 02: Construction cost package, which was invited for bidding by the Ủy ban nhân dân xã Mỹ Đức through an Open bidding as an independent entity.
- Result: Won
23/12/2025 15:44
\ join for the Tender package No 03: Construction package, which was invited for bidding by the through an Open bidding as an independent entity.
- Result: Tender opening completed
21/12/2025 09:07
\ join for the Package 02: Construction cost package, which was invited for bidding by the through an Open bidding as an independent entity.
- Result: Tender opening completed
11/12/2025 09:06
\ Won the bidding for the Package 02: Construction cost package, which was invited for bidding by the Ủy ban nhân dân xã Hương Sơn through an Open bidding as sub-joint of Liên danh Minh Hoàng - Đức Long.
- Result: Won
30/06/2025 08:01
\ Won the bidding for the Package 02: Construction cost package, which was invited for bidding by the Ủy ban nhân dân xã Hương Sơn through an Open bidding as sub-joint of Liên danh Minh Hoàng - Đức Long.
- Result: Won
30/06/2025 08:00
\ Won the bidding for the Package 02: Construction cost package, which was invited for bidding by the Ủy ban nhân dân xã Hương Sơn through an Open bidding as sub-joint of Liên danh Minh Hoàng - Đức Long.
- Result: Won
24/06/2025 14:42
\ Won the bidding for the Bid package No. 04: Construction costs package, which was invited for bidding by the ban quản lý dự án đầu tư xây dựng huyện mỹ đức through an Open bidding as master consortium of Liên danh Công ty TNHH Đức Long - Công ty cổ phần tư vấn xây dựng và dịch vụ thương mại Thành Hưng. One other contractors also participated.
- Result: Won
04/06/2025 18:03
\ Won the bidding for the Package 02: Construction cost package, which was invited for bidding by the Ủy ban nhân dân xã Hương Sơn through an Open bidding as an independent entity.
- Result: Won
04/06/2025 09:56
\ Won the bidding for the Package 02: Construction cost package, which was invited for bidding by the UBND xã Vạn Tín through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
29/05/2025 15:18
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder \ participated in 46 package, of which 43 package was won, failed 2 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor \ is related to 17 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor \ competed with 19 contractors in 16 package, won 13 package, lost 2 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor \ once entered into a partnership with 17 contractors in 22 package, won bid 21 package, lost 0 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor \ participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor \ participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor