Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 12/29/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:15 AM 12/30/2024 |
Active |
At the request of QTHT |
|
12:05 AM 02/04/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
2:33 PM 02/10/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors 469 CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 123 bidding packages, of which 68 were won, 52 were lost, 2 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 70.69% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.88% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Nghệ An (13), Đắk Lắk (13), Khánh Hòa (9), Gia Lai (8), Đà Nẵng (8), TP.Hồ Chí Minh (7), Quảng Ngãi (6), Lâm Đồng (5), Đồng Nai (4), Cà Mau (4), Hà Nội (3), Huế (3), Điện Biên (3), Cần Thơ (3), An Giang (3), Hà Tĩnh (2), Vĩnh Long (2), Lào Cai (2), Thái Nguyên (2), Quảng Ninh (1), Thanh Hoá (1), Tây Ninh (1), Phú Thọ (1), Đồng Tháp (1), Lai Châu (1), Sơn La (1), Quảng Trị (1), Hưng Yên (1), Undefined (16)
- Provinces before the merger where the contractor has participated in bidding : Nghệ An (13), Khánh Hòa (9), Đắk Lắk (6), Quảng Nam (6), TP.Hồ Chí Minh (6), Bình Định (5), Phú Yên (5), Kon Tum (4), Hà Nội (3), Huế (3), Lâm Đồng (3), Điện Biên (3), Gia Lai (2), Đà Nẵng (2), Hà Tĩnh (2), Đắk Nông (2), Quảng Ngãi (2), Hậu Giang (2), Trà Vinh (2), Lào Cai (2), Bình Phước (2), Quảng Ninh (1), Thanh Hoá (1), Tây Ninh (1), Phú Thọ (1), Đồng Tháp (1), Lai Châu (1), Sơn La (1), Quảng Trị (1), Thái Bình (1), Sóc Trăng (1), An Giang (1), Đồng Nai (1), Bà Rịa - Vũng Tàu (1), Bạc Liêu (1), Undefined (27)
- Has relationships with 65 Bid Solicitors
- Has competed against 299 contractors in 99 bidding packages, won 45 packages, lost 51 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 83 contractors in 91 bidding packages, won 54 packages, lost 36 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
- Building organization name: CÔNG TY CỔ PHẦN XÂY DỰNG 469
- Construction capacity certificate code: 00021602
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Nghệ An
- Field:
⚬ Thi công xây dựng công trình: Giao thông (đường bộ)
⚬ Thi công xây dựng công trình: Nông nghiệp và phát triển nông thôn (thủy lợi)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 2.9% |
| Lower by 10% to 20% | 8 | 11.8% |
| Lower by 5% to 10% | 4 | 5.9% |
| Lower by 1% to 5% | 22 | 32.4% |
| Lower by 0% to 1% | 25 | 36.8% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 2 | 2.9% |
| Higher by 1% to 5% | 2 | 2.9% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 3 | 4.4% |
| Unknown | 0 | 0% |
| Total | 68 | 100% |
469 CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 13: Construction and installation + Works to ensure traffic safety during the construction process package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CP XÂY DỰNG 469. Twelve other contractors also participated.
- Result: Lost
08/01/2026 08:35
469 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 3: Construction of section Km1281+100 - Km1281+500; Km1281+594 - Km1281+907; Km1289+700 – Km1290+100 (T); Km1289+700 - Km1290+700 (P); Km1302+00 - Km1302+700 package, which was invited for bidding by the Khu Quản lý đường bộ III through an Open bidding as sub-joint of Liên danh Công ty Tuấn Tú - 469. Four other contractors also participated.
- Result: Won
05/01/2026 08:19
469 CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 18: Entire construction and installation part of the project package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CP XÂY DỰNG 469. Nine other contractors also participated.
- Result: Lost
22/12/2025 09:47
469 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 2: Construction to serve urgent traffic road section Km1280+211 - Km1280+550; Km1282+498 - Km1282+748; Km1289+200 - Km1289+700 (T, P), Km1290+100 – Km1290+700 (T) package, which was invited for bidding by the Khu Quản lý đường bộ III through an Open bidding as sub-joint of Liên danh Công ty Tuấn Tú - 469.
- Result: Won
11/12/2025 15:22
469 CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package 08 (Construction and installation): Construction package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
11/12/2025 15:11
469 CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 14: Construction of Xeo Lon bridge. package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CP XÂY DỰNG 469. Five other contractors also participated.
- Result: Lost
11/12/2025 09:53
469 CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 17: Construction of Kenh Lo bridge package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CP XÂY DỰNG 469. Six other contractors also participated.
- Result: Lost
11/12/2025 09:51
469 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Construction package, which was invited for bidding by the Sở Xây dựng tỉnh Thái Nguyên through an Open bidding as an independent entity.
- Result: Won
09/12/2025 14:43
469 CONSTRUCTION JOINT STOCK COMPANY join for the Package No. 13: Construction and installation + Works to ensure traffic safety during the construction process package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CP XÂY DỰNG 469. Twelve other contractors also participated.
- Result: Tender opening completed
09/12/2025 09:01
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder 469 CONSTRUCTION JOINT STOCK COMPANY participated in 123 package, of which 68 package was won, failed 52 packages, 2 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 469 CONSTRUCTION JOINT STOCK COMPANY is related to 65 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 469 CONSTRUCTION JOINT STOCK COMPANY competed with 299 contractors in 99 package, won 45 package, lost 51 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor 469 CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 83 contractors in 91 package, won bid 54 package, lost 36 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor 469 CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 28 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 469 CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 35 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor