Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 108 bidding packages, of which 101 were won, 4 were lost, 2 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 76.66% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.97% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (84), Quảng Ninh (3), Lạng Sơn (2), An Giang (1), Lào Cai (1), Nghệ An (1), Bắc Ninh (1), Undefined (15)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (84), Quảng Ninh (3), Lạng Sơn (2), Kiên Giang (1), Yên Bái (1), Nghệ An (1), Bắc Ninh (1), Undefined (22)
- Has relationships with 47 Bid Solicitors
- Has competed against 65 contractors in 84 bidding packages, won 77 packages, lost 4 packages, 2 are pending results, and 1 were canceled.
- Has collaborated with 70 contractors in 102 bidding packages, won 95 packages, lost 4 packages, 2 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 25 bidding packages with 7 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 2% |
| Lower by 10% to 20% | 3 | 3% |
| Lower by 5% to 10% | 12 | 11.9% |
| Lower by 1% to 5% | 57 | 56.4% |
| Lower by 0% to 1% | 18 | 17.8% |
| 0% | 5 | 5% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 2 | 2% |
| Higher by 5% to 10% | 1 | 1% |
| Higher by 10% or more | 1 | 1% |
| Unknown | 0 | 0% |
| Total | 101 | 100% |
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Maintenance and maintenance of fire protection system package, which was invited for bidding by the Trung tâm Kỹ thuật quan trắc khí tượng thủy văn through an assign bid as an independent entity.
- Result: Won
20/10/2025 16:23
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Bidding package No. 01: BVTC Design Consulting - Estimation package, which was invited for bidding by the Ban quản lý dự án đầu tư - hạ tầng xã Thư Lâm through an Open bidding as sub-joint of LIÊN DANH VIỆN KIẾN TRÚC NHIỆT ĐỚI - CÔNG TY CỔ PHẦN XÂY DỰNG VÀ CƠ ĐIỆN AA. One other contractors also participated.
- Result: Won
10/10/2025 18:53
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Bidding package 1: Design consultancy BVTC - Estimation package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Đông Anh through an Open bidding as sub-joint of Liên danh VPTV-Tuấn Nhật-Cơ điện AA.
- Result: Won
03/10/2025 16:46
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package 3: Consulting on designing BVTC - DT design package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Phúc Thịnh through an Open bidding as sub-joint of Liên danh nhà thầu Công ty Cổ phần Tư vấn, Đầu tư và Xây dựng CDCC – Công ty Cổ phần Xây dựng và Cơ điện AA – Công ty Cổ phần Đầu tư Xây dựng Năng lượng Đông Á. Two other contractors also participated.
- Result: Won
30/09/2025 10:19
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package 3: Consulting on designing BVTC - DT design package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Phúc Thịnh through an Open bidding as sub-joint of Liên danh nhà thầu VIAR – AA - ĐA.
- Result: Won
30/09/2025 10:11
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY join for the Bidding package No. 01: BVTC Design Consulting - Estimation package, which was invited for bidding by the Ban quản lý dự án đầu tư - hạ tầng xã Thư Lâm through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN XÂY DỰNG VÀ CƠ ĐIỆN AA. One other contractors also participated.
- Result: Tender opening completed
29/09/2025 10:12
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Bidding package 7: CONSTRUCTION CONSULTING CONSTRUCTION DESIGN AND CONSTRUCTION package, which was invited for bidding by the Ban Quản lý dự án đầu tư - hạ tầng xã Vĩnh Thanh through an Open bidding as sub-joint of Liên danh NBM - AA.
- Result: Won
23/09/2025 10:03
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package 10: Consulting on designing construction drawings, construction cost estimates package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng khu vực I tỉnh Quảng Ninh through an Open bidding as sub-joint of Liên danh VCC-CNHN- CIC-AA-XLĐQN.
- Result: Won
18/09/2025 15:54
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Bidding package 07: BVTC Design Consulting - Estimation package, which was invited for bidding by the Ban Quản lý dự án đầu tư - hạ tầng xã Thiên Lộc through an Open bidding as sub-joint of LIÊN DANH VIỆN KIẾN TRÚC NHIỆT ĐỚI - CÔNG TY CƠ ĐIỆN AA - CÔNG TY ĐÔNG Á.
- Result: Won
12/09/2025 09:53
AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY join for the Package 3: Consulting on designing BVTC - DT design package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Phúc Thịnh through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN XÂY DỰNG VÀ CƠ ĐIỆN AA. Two other contractors also participated.
- Result: Tender opening completed
05/09/2025 14:12
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY participated in 108 package, of which 101 package was won, failed 4 packages, 2 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY is related to 47 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY competed with 65 contractors in 84 package, won 77 package, lost 4 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 70 contractors in 102 package, won bid 95 package, lost 4 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 7 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 7 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor