Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 12/10/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
10:47 AM 01/07/2023 |
Active |
At the request of QTHT |
|
3:23 PM 10/17/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:22 AM 10/18/2023 |
Active |
At the request of QTHT |
|
12:29 AM 11/07/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:08 AM 11/07/2023 |
Active |
At the request of QTHT |
|
12:06 AM 09/03/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:49 AM 09/04/2024 |
Active |
At the request of QTHT |
|
12:05 AM 11/10/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:38 AM 11/11/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors AI TECH CONSULTING JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 212 bidding packages, of which 195 were won, 10 were lost, 3 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 55.75% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.67% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (61), TP.Hồ Chí Minh (18), Hải Phòng (8), Huế (8), Phú Thọ (7), Tuyên Quang (7), Điện Biên (5), Lâm Đồng (4), Đồng Nai (3), Đắk Lắk (3), Lạng Sơn (2), Cần Thơ (2), Vĩnh Long (2), Đà Nẵng (1), Hà Tĩnh (1), An Giang (1), Nationwide (1), Bắc Ninh (1), Quảng Ninh (1), Undefined (76)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (61), TP.Hồ Chí Minh (16), Huế (8), Hải Phòng (7), Hòa Bình (5), Điện Biên (5), Tuyên Quang (4), Đồng Nai (3), Vĩnh Phúc (2), Bình Thuận (2), Lạng Sơn (2), Lâm Đồng (2), Trà Vinh (2), Đắk Lắk (2), Hà Giang (2), Quảng Nam (1), Hà Tĩnh (1), Kiên Giang (1), Hải Dương (1), Hậu Giang (1), Nationwide (1), Bắc Ninh (1), Phú Yên (1), Quảng Ninh (1), Undefined (81)
- Has relationships with 137 Bid Solicitors
- Has competed against 33 contractors in 22 bidding packages, won 11 packages, lost 9 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 11 contractors in 11 bidding packages, won 5 packages, lost 5 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 369 bidding packages with 63 roles.
- Published contractor selection plan of 56 project with a total of 175 of bidding packages.
- Invitation to bid 52 package (with 78 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 56 packages announced, canceled bids 0 packages (among the packages above).
- There are 7 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors AI TECH Consulting joint stock company are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 65 Contractor Selection Plan, including 60 self-published Contractor Selection Plan, 5 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 85 bidding package in which the package is self-inviting 78, with 7 the package is owned by the unit. other bidding.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 2.1% |
| Lower by 10% to 20% | 6 | 3.1% |
| Lower by 5% to 10% | 19 | 9.7% |
| Lower by 1% to 5% | 28 | 14.4% |
| Lower by 0% to 1% | 17 | 8.7% |
| 0% | 121 | 62.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 195 | 100% |
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Package 01: Project management consulting package, which was invited for bidding by the Cục Phát triển Doanh nghiệp tư nhân và kinh tế tập thể through an assign shorthand as an independent entity.
- Result: Won
25/12/2025 15:11
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Package 02: Consulting on detailed design and estimates package, which was invited for bidding by the Công an Thành phố Huế through an assign shorthand as an independent entity.
- Result: Won
07/11/2025 10:49
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Package No. 01: Detailed design and estimate package, which was invited for bidding by the Ban Quản Lý dự án đầu tư xây dựng through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
10/10/2025 15:35
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Advice on technical economic reports package, which was invited for bidding by the Công an Thành phố Huế through an assign shorthand as an independent entity.
- Result: Won
06/10/2025 14:34
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Consultancy on preparation and evaluation of tender documents package, which was invited for bidding by the Bệnh viện Đại học Y Dược - Cơ sở Linh Đàm through an assign shorthand as an independent entity.
- Result: Won
03/10/2025 16:03
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Consulting on Preparation of Finance and Technical Report package, which was invited for bidding by the Bệnh viện Đại học Y Dược - Cơ sở Linh Đàm through an assign shorthand as master consortium of Liên danh AITECH - Vạn Long.
- Result: Won
03/10/2025 10:13
AI TECH CONSULTING JOINT STOCK COMPANY join for the Package No. 01: Detailed design and estimate package, which was invited for bidding by the Ban Quản Lý dự án đầu tư xây dựng through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
29/09/2025 10:29
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Consultancy on preparation and evaluation of tender documents package, which was invited for bidding by the HA NOI ONCOLOGY HOSPITAL through an assign shorthand as an independent entity.
- Result: Won
17/09/2025 14:34
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Package 02: Project Management Consulting package, which was invited for bidding by the Công an Thành phố Huế through an assign shorthand as an independent entity.
- Result: Won
15/09/2025 17:11
AI TECH CONSULTING JOINT STOCK COMPANY Won the bidding for the Consultancy on making feasibility study report package, which was invited for bidding by the Công an Thành phố Huế through an assign shorthand as an independent entity.
- Result: Won
03/09/2025 15:55
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder AI TECH CONSULTING JOINT STOCK COMPANY participated in 212 package, of which 195 package was won, failed 10 packages, 3 packages with no results, 4 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AI TECH CONSULTING JOINT STOCK COMPANY is related to 137 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AI TECH CONSULTING JOINT STOCK COMPANY competed with 33 contractors in 22 package, won 11 package, lost 9 package, 1 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor AI TECH CONSULTING JOINT STOCK COMPANY once entered into a partnership with 11 contractors in 11 package, won bid 5 package, lost 5 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor AI TECH CONSULTING JOINT STOCK COMPANY participated in bidding in 18 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor AI TECH CONSULTING JOINT STOCK COMPANY participated in bidding in 23 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor