Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:42 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:47 AM 11/11/2022 |
Active |
At the request of QTHT |
|
1:01 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:20 AM 07/19/2024 |
Active |
At the request of QTHT |
|
1:43 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
5:32 PM 06/02/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors Bach Khai Construction Investment Joint stock Company are as follows:
You need to Login or Sign up to view all informations.
- Participated in 50 bidding packages, of which 49 were won, 0 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 93.31% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.37% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (36), Undefined (14)
- Provinces before the merger where the contractor has participated in bidding : Hải Dương (21), Undefined (29)
- Has relationships with 13 Bid Solicitors
- Has competed against 4 contractors in 2 bidding packages, won 1 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 62 bidding packages with 15 roles.
- Published contractor selection plan of 16 project with a total of 50 of bidding packages.
- Invitation to bid 14 package (with 14 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 16 packages announced, canceled bids 0 packages (among the packages above).
- There are 5 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors Bach Khai Construction Investment Joint stock Company are as follows:
- As the investor of 1 investment and development projects.
- As the investor of 3 Contractor Selection Plan, including 3 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 7 bidding package in which the package is self-inviting 5, with 2 the package is owned by the unit. other bidding.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 1 | 2% |
| Lower by 1% to 5% | 3 | 6.1% |
| Lower by 0% to 1% | 1 | 2% |
| 0% | 43 | 87.8% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 2% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 49 | 100% |
Bach Khai Construction Investment Joint stock Company Won the bidding for the Package 03: Construction project management consulting package, which was invited for bidding by the VĂN PHÒNG HỘI ĐỒNG NHÂN DÂN VÀ ỦY BAN NHÂN DÂN XÃ TRƯỜNG TÂN through an assign shorthand as an independent entity.
- Result: Won
31/12/2025 20:35
Bach Khai Construction Investment Joint stock Company Won the bidding for the Package 03: Construction project management consulting package, which was invited for bidding by the VĂN PHÒNG HỘI ĐỒNG NHÂN DÂN VÀ ỦY BAN NHÂN DÂN XÃ TRƯỜNG TÂN through an assign shorthand as an independent entity.
- Result: Won
23/12/2025 17:35
Bach Khai Construction Investment Joint stock Company Won the bidding for the Project management consulting: Repairing kitchens for officials, replacing police office doors in Yet Kieu commune, Hai Phong city package, which was invited for bidding by the Văn phòng HĐND - UBND xã Yết Kiêu through an assign shorthand as an independent entity.
- Result: Won
23/12/2025 10:30
Bach Khai Construction Investment Joint stock Company Won the bidding for the Project management consulting + Construction supervision consulting: Repainting the exterior walls of the 2-story 8-room classroom, boarding kitchen and guard house of Pham Tran Kindergarten package, which was invited for bidding by the Trường Mầm non Phạm Trấn through an assign shorthand as an independent entity.
- Result: Won
11/12/2025 11:04
Bach Khai Construction Investment Joint stock Company Won the bidding for the Project management consulting + Construction supervision consulting: Repainting the exterior walls, re-flooring the classroom on the 2nd floor of the 2-story, 8-room classroom building No. 4A Dong Quang Kindergarten package, which was invited for bidding by the Trường mầm non Đồng Quang through an assign shorthand as an independent entity.
- Result: Won
11/12/2025 08:53
Bach Khai Construction Investment Joint stock Company Won the bidding for the Bidding package number 03:
Project management consulting package, which was invited for bidding by the Trường Mầm Non Lê Lợi through an assign shorthand as an independent entity.
- Result: Won
04/12/2025 09:31
Bach Khai Construction Investment Joint stock Company Won the bidding for the Bidding package number 04:
Construction supervision consulting package, which was invited for bidding by the Trường Mầm Non Lê Lợi through an assign shorthand as an independent entity.
- Result: Won
04/12/2025 09:29
Bach Khai Construction Investment Joint stock Company Won the bidding for the Project management consultancy package, which was invited for bidding by the TRƯỜNG TIỂU HỌC GIA LƯƠNG through an assign shorthand as an independent entity.
- Result: Won
03/12/2025 10:18
Bach Khai Construction Investment Joint stock Company Won the bidding for the Bidding package number 04:
Construction supervision consulting package, which was invited for bidding by the TRƯỜNG TIÊU HỌC QUANG MINH through an assign shorthand as an independent entity.
- Result: Won
03/12/2025 09:12
Bach Khai Construction Investment Joint stock Company Won the bidding for the Bidding package number 03:
Project management consulting package, which was invited for bidding by the TRƯỜNG TIÊU HỌC QUANG MINH through an assign shorthand as an independent entity.
- Result: Won
03/12/2025 09:10
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder Bach Khai Construction Investment Joint stock Company participated in 50 package, of which 49 package was won, failed 0 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Bach Khai Construction Investment Joint stock Company is related to 13 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Bach Khai Construction Investment Joint stock Company competed with 4 contractors in 2 package, won 1 package, lost 0 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Bach Khai Construction Investment Joint stock Company participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Bach Khai Construction Investment Joint stock Company participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,725 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor