Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:08 AM 06/17/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
5:28 PM 05/09/2024 |
Active |
At the request of QTHT |
|
1:14 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
7:18 PM 07/16/2024 |
Active |
At the request of QTHT |
|
12:05 AM 08/04/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
1:58 PM 08/06/2024 |
Active |
At the request of QTHT |
|
12:05 AM 09/15/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:02 PM 11/06/2024 |
Active |
At the request of QTHT |
|
12:05 AM 12/27/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
7:56 AM 03/06/2025 |
Active |
At the request of QTHT |
|
12:44 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
1:50 PM 05/13/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors CHTT COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 12 bidding packages, of which 11 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 63.2% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 76.19% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Trị (12)
- Provinces before the merger where the contractor has participated in bidding : Quảng Trị (9), Undefined (3)
- Has relationships with 4 Bid Solicitors
- Has competed against 18 contractors in 5 bidding packages, won 4 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 1 bidding packages, won 0 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: CÔNG TY TNHH CHTT
- Construction capacity certificate code: 00070987
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Quảng Trị
- Field:
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình Dân dụng
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình HTKT cấp thoát nước
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 36.4% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 0 | 0% |
| Lower by 0% to 1% | 0 | 0% |
| 0% | 7 | 63.6% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 11 | 100% |
CHTT COMPANY LIMITED Won the bidding for the Processing partitions for 04 bathrooms at the HSTC-CD department package, which was invited for bidding by the Bệnh viện đa khoa tỉnh Quảng Trị through an assign shorthand as an independent entity.
- Result: Won
26/12/2025 14:54
CHTT COMPANY LIMITED Won the bidding for the Fabrication of partitions to create pathways for transporting dirty items at the PT-GMHS department and compartment frames for arranging EO machines at the Internal Control Department package, which was invited for bidding by the Bệnh viện đa khoa tỉnh Quảng Trị through an assign shorthand as an independent entity.
- Result: Won
04/12/2025 07:06
CHTT COMPANY LIMITED Won the bidding for the Repairing the outpatient hospital payment area in the house A package, which was invited for bidding by the Bệnh viện đa khoa tỉnh Quảng Trị through an assign shorthand as an independent entity.
- Result: Won
04/07/2025 00:59
CHTT COMPANY LIMITED Won the bidding for the Repair server room for electronic medical records at the hospital package, which was invited for bidding by the Bệnh viện đa khoa tỉnh Quảng Trị through an assign shorthand as an independent entity.
- Result: Won
02/07/2025 01:11
CHTT COMPANY LIMITED Won the bidding for the Tiles of plastic stone plastic sheet for outpatient examination area 1 house A package, which was invited for bidding by the Bệnh viện đa khoa tỉnh Quảng Trị through an assign shorthand as an independent entity.
- Result: Won
05/06/2025 16:39
CHTT COMPANY LIMITED Won the bidding for the Civil Works package, which was invited for bidding by the Bảo hiểm xã hội tỉnh Quảng Trị through an assign shorthand as an independent entity.
- Result: Won
20/05/2025 14:20
CHTT COMPANY LIMITED lost the bidding for the Construction package, which was invited for bidding by the TAN KHOI QUANG TRI COMPANY LIMITED through an Competitive Offer as sub-joint of CÔNG TY TNHH CHTT. Four other contractors also participated.
- Result: Lost
04/04/2025 08:27
CHTT COMPANY LIMITED join for the Construction package, which was invited for bidding by the TAN KHOI QUANG TRI COMPANY LIMITED through an Competitive Offer as sub-joint of CÔNG TY TNHH CHTT. Four other contractors also participated.
- Result: Tender opening completed
12/03/2025 08:01
CHTT COMPANY LIMITED Won the bidding for the Expanding the parking garage for staff on duty at the Hospital package, which was invited for bidding by the Bệnh viện đa khoa tỉnh Quảng Trị through an assign shorthand as an independent entity.
- Result: Won
31/12/2024 16:41
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CHTT COMPANY LIMITED participated in 12 package, of which 11 package was won, failed 1 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CHTT COMPANY LIMITED is related to 4 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CHTT COMPANY LIMITED competed with 18 contractors in 5 package, won 4 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CHTT COMPANY LIMITED once entered into a partnership with 2 contractors in 1 package, won bid 0 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CHTT COMPANY LIMITED participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CHTT COMPANY LIMITED participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor