Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 08/10/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:17 AM 08/10/2024 |
Active |
At the request of QTHT |
|
12:06 AM 12/03/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
1:28 AM 12/03/2024 |
Active |
At the request of QTHT |
|
12:05 AM 02/04/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:33 AM 02/04/2025 |
Active |
At the request of QTHT |
|
12:05 AM 03/03/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:40 AM 03/03/2025 |
Active |
At the request of QTHT |
|
12:05 AM 07/08/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:22 AM 07/08/2025 |
Active |
At the request of QTHT |
|
12:05 AM 09/02/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
6:16 PM 09/02/2025 |
Active |
At the request of QTHT |
|
12:05 AM 11/20/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:04 AM 11/20/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 342 bidding packages, of which 162 were won, 163 were lost, 13 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 30.9% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 86.52% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (183), Ninh Bình (19), Hưng Yên (11), Hải Phòng (9), Đà Nẵng (8), Phú Thọ (6), Gia Lai (5), Đồng Nai (4), Khánh Hòa (4), Huế (4), Quảng Ninh (4), Lào Cai (3), Thái Nguyên (2), Tuyên Quang (2), Nghệ An (2), Thanh Hoá (2), Cao Bằng (1), Lâm Đồng (1), Bắc Ninh (1), Cần Thơ (1), Đắk Lắk (1), TP.Hồ Chí Minh (1), Undefined (68)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (183), Hà Nam (9), Hưng Yên (9), Bình Định (5), Hải Dương (5), Đồng Nai (4), Đà Nẵng (4), Vĩnh Phúc (4), Huế (4), Quảng Ninh (4), Khánh Hòa (3), Ninh Bình (3), Nam Định (3), Thái Bình (2), Thái Nguyên (2), Lào Cai (2), Phú Thọ (2), Nghệ An (2), Hải Phòng (2), Thanh Hoá (2), Yên Bái (1), Cao Bằng (1), Lâm Đồng (1), Tuyên Quang (1), Bắc Ninh (1), Cần Thơ (1), Quảng Nam (1), Hà Giang (1), Ninh Thuận (1), Undefined (87)
- Has relationships with 207 Bid Solicitors
- Has competed against 257 contractors in 234 bidding packages, won 53 packages, lost 158 packages, 19 are pending results, and 4 were canceled.
- Has collaborated with 21 contractors in 29 bidding packages, won 13 packages, lost 12 packages, 1 are pending results, and 3 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 24 bidding packages with 10 roles.
- Building organization name: CÔNG TY CỔ PHẦN TƯ VẤN QUẢN LÝ DỰ ÁN XÂY DỰNG CMAXX
- Construction capacity certificate code: 00010937
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Lắp đặt thiết bị công nghệ thông tin
⚬ Khảo sát xây dựng: Địa hình
⚬ Khảo sát xây dựng: Địa chất công trình
⚬ Giám sát thi công xây dựng công trình: Dân dụng, Công nghiệp
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thẩm tra thiết kế công trình Dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Dân dụng
- Lab name: CMAXX Construction Experiment Center
- Laboratory code: LAS-XD 704
- Certifications:
⚬ Certificate 68/GCN-BXD
⚬ Certificate 758/GCN-BXD.
⚬ Certificate 699/GCN-BXD
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 40 | 24.7% |
| Lower by 10% to 20% | 8 | 4.9% |
| Lower by 5% to 10% | 23 | 14.2% |
| Lower by 1% to 5% | 32 | 19.8% |
| Lower by 0% to 1% | 34 | 21% |
| 0% | 17 | 10.5% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 4 | 2.5% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 4 | 2.5% |
| Unknown | 0 | 0% |
| Total | 162 | 100% |
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY join for the Project management consultancy package, which was invited for bidding by the through an Open bidding as an independent entity.
13/01/2026 09:41
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY Won the bidding for the Package No. 08: Supervision of construction and equipment installation; Demolition of the status quo; Static compression test package, which was invited for bidding by the Ban Quản Lý dự án đầu tư xây dựng through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
12/01/2026 17:27
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY join for the Construction supervision consultancy and equipment installation package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
12/01/2026 16:09
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY Won the bidding for the Package No. 2: Construction supervision and equipment installation package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Phúc Thịnh through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
06/01/2026 16:29
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY lost the bidding for the TV-14: Project management advice package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
31/12/2025 10:57
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY lost the bidding for the Package No. 04: Construction supervision + Equipment installation package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
28/12/2025 14:58
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY Won the bidding for the Package No. 9: Consulting on construction supervision of all project items package, which was invited for bidding by the Investment Project Management Board - Infrastructure of Bo De Ward through an assign bid as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ QUẢN LÝ DỰ ÁN LÂM GIANG -CÔNG TY CỔ PHẦN TƯ VẤN QUẢN LÝ DỰ ÁN XÂY DỰNG CMAXX.
- Result: Won
26/12/2025 18:31
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY Won the bidding for the Package No. 5: Supervision of construction works package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng công trình dân dụng và hạ tầng Hải Phòng through an Open bidding as an independent entity.
- Result: Won
25/12/2025 16:55
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY join for the Package No. 2: Construction supervision and equipment installation package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Phúc Thịnh through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Tender opening completed
23/12/2025 10:12
CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY Won the bidding for the Construction supervision consultancy and construction equipment installation package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng Nam Định through an Open bidding as an independent entity.
- Result: Won
22/12/2025 17:21
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY participated in 342 package, of which 162 package was won, failed 163 packages, 13 packages with no results, 4 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY is related to 207 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY competed with 257 contractors in 234 package, won 53 package, lost 158 package, 19 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY once entered into a partnership with 21 contractors in 29 package, won bid 13 package, lost 12 package, 1 bidding package has no results, 3 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY participated in bidding in 22 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CMAXX CONSTRUCTION PROJECT MANAGEMENT CONSULTANT JOINT STOCK COMPANY participated in bidding in 29 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor