Data analysis results of DauThau.info software for contractors CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN are as follows:
You need to Login or Sign up to view all informations.
- Participated in 20 bidding packages, of which 19 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 85.15% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.9% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (17), Đồng Nai (1), Quảng Ngãi (1), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (16), Đồng Nai (1), Kon Tum (1), Undefined (2)
- Has relationships with 8 Bid Solicitors
- Has competed against 12 contractors in 5 bidding packages, won 4 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 4 bidding packages with 4 roles.
- Building organization name: CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN
- Construction capacity certificate code: 00051243
- Issuing Authority: Sở Kế hoạch và Đầu tư Thành phố Hồ Chí Minh
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế; thẩm tra thiết kế xây dựng (kiến trúc; kết cấu; cơ - điện; cấp - thoát nước) công trình dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế; thẩm tra thiết kế xây dựng công trình hạ tầng kỹ thuật cấp nước; thoát nước
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Công nghiệp
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật cấp nước; thoát nước
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 1 | 5.3% |
| Lower by 5% to 10% | 3 | 15.8% |
| Lower by 1% to 5% | 5 | 26.3% |
| Lower by 0% to 1% | 7 | 36.8% |
| 0% | 3 | 15.8% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 19 | 100% |
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN Won the bidding for the Consultancy on verification of KTKT . reports package, which was invited for bidding by the NGÂN HÀNG NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN VIỆT NAM - CHI NHÁNH PHÚ NHUẬN through an assign shorthand as an independent entity.
- Result: Won
24/10/2025 17:41
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN Won the bidding for the Construction and installation of daily -life wastewater treatment system Se San 4 hydropower and solar power plant Se San 4 package, which was invited for bidding by the CÔNG TY PHÁT TRIỂN THỦY ĐIỆN SÊ SAN - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM through an Open bidding as an independent entity.
- Result: Won
26/07/2025 14:45
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN join for the Construction and installation of daily -life wastewater treatment system Se San 4 hydropower and solar power plant Se San 4 package, which was invited for bidding by the CÔNG TY PHÁT TRIỂN THỦY ĐIỆN SÊ SAN - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM through an Open bidding as an independent entity.
- Result: Tender opening completed
25/06/2025 18:26
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN Won the bidding for the Consultancy and verification of construction drawing design and total construction cost estimate package, which was invited for bidding by the ỦY BAN NHÂN DÂN THỊ TRẤN CẦN THẠNH through an assign shorthand as an independent entity.
- Result: Won
15/05/2025 16:31
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN Won the bidding for the Consultancy on contractor selection package, which was invited for bidding by the VIETNAM HELICOPTER CORPORATION through an assign shorthand as an independent entity.
- Result: Won
15/05/2025 10:01
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN Won the bidding for the Upgrading and renovating the wastewater treatment system with a capacity of 30m3/day at Le Dai Hanh transfer station to meet QCVN 40:2011/BTNMT, column A package, which was invited for bidding by the CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI DỊCH VỤ THIÊN LỘC GIA through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
15/11/2024 11:47
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN Won the bidding for the Repair and renovate the domestic wastewater treatment station at Binh Tay market package, which was invited for bidding by the BINH TAY MARKET MANAGEMENT through an assign shorthand as an independent entity.
- Result: Won
24/10/2024 10:09
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN Won the bidding for the "Upgrading and renovating the system
Wastewater treatment capacity of 15m3/day at Vo Thi Sau transfer station meets QCVN 40:2011/BTNMT, column A" package, which was invited for bidding by the HO CHI MINH CITY URBAN ENVIRONMENT COMPANY LIMITED through an assign bid as an independent entity.
- Result: Won
14/10/2024 08:55
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN Won the bidding for the Package No. 07: Procurement of Vasstar hot and cold water dispensers package, which was invited for bidding by the Institute for Tropical Technology through an assign shorthand as an independent entity.
- Result: Won
25/09/2024 11:34
CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN join for the Upgrading and renovating the wastewater treatment system with a capacity of 30m3/day at Le Dai Hanh transfer station to meet QCVN 40:2011/BTNMT, column A package, which was invited for bidding by the CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI DỊCH VỤ THIÊN LỘC GIA through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
23/09/2024 10:58
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN participated in 20 package, of which 19 package was won, failed 1 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN is related to 8 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN competed with 12 contractors in 5 package, won 4 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN CÔNG NGHỆ MÔI TRƯỜNG PHÚC NGUYÊN participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor