Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
3:14 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
4:48 PM 10/18/2022 |
Active |
At the request of QTHT |
|
1:14 AM 11/25/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
3:56 PM 02/10/2023 |
Active |
At the request of QTHT |
|
3:58 PM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:18 AM 06/08/2023 |
Active |
At the request of QTHT |
|
1:57 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:22 PM 07/05/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors ARRA 79 INVESTMENT CORPORATION are as follows:
You need to Login or Sign up to view all informations.
- Participated in 33 bidding packages, of which 31 were won, 0 were lost, 2 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 84.45% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.24% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Lào Cai (25), Hà Nội (7), Hưng Yên (1)
- Provinces before the merger where the contractor has participated in bidding : Lào Cai (14), Hà Nội (7), Hưng Yên (1), Undefined (11)
- Has relationships with 8 Bid Solicitors
- Has relationships with 12 Bid Investors
- Has competed against 11 contractors in 12 bidding packages, won 12 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 12 contractors in 18 bidding packages, won 18 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 19 bidding packages with 4 roles.
- Building organization name: CÔNG TY CỔ PHẦN ĐẦU TƯ A.R.R.A 79
- Construction capacity certificate code: 00027915
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Lập quy hoạch xây dựng: Lập quy hoạch xây dựng
⚬ Khảo sát xây dựng: Địa chất
⚬ Lập quy hoạch xây dựng: Lập quy hoạch xây dựng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng Tu bổ và tôn tạo di tích
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Công nghiệp nhẹ
⚬ Lập quy hoạch xây dựng:
⚬ Khảo sát xây dựng: Khảo sát địa hình.
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng công trình công nghiệp (nhẹ).
⚬ Quản lý dự án đầu tư xây dựng: Quản lý dự án đầu tư xây dựng công trình: dân dụng; giao thông; thủy lợi; hạ tầng kỹ thuật.
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình dân dụng.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 3 | 9.7% |
| Lower by 5% to 10% | 6 | 19.4% |
| Lower by 1% to 5% | 9 | 29% |
| Lower by 0% to 1% | 8 | 25.8% |
| 0% | 5 | 16.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 31 | 100% |
ARRA 79 INVESTMENT CORPORATION Won the bidding for the Bidding package No. 03: Consulting on surveys and planning projects package, which was invited for bidding by the Phòng Kinh tế xã Bảo hà through an Open bidding as master consortium of LIÊN DANH CÔNG TY CỔ PHẦN ĐẦU TƯ A.R.R.A 79 VÀ CÔNG TY CỔ PHẦN KHẢO SÁT XÂY DỰNG HÀ NỘI. Three other contractors also participated.
- Result: Won
18/06/2026 21:23
ARRA 79 INVESTMENT CORPORATION Won the bidding for the Package No. 04: Consulting on planning planning projects, preparing planning documents according to GIS package, which was invited for bidding by the Phòng Kinh tế xã Bảo Yên through an Open bidding as an independent entity.
- Result: Won
10/06/2026 15:28
ARRA 79 INVESTMENT CORPORATION join for the Bidding package No. 03: Consulting on surveys and planning projects package, which was invited for bidding by the Phòng Kinh tế xã Bảo hà through an Open bidding as master consortium of CÔNG TY CỔ PHẦN ĐẦU TƯ A.R.R.A 79. Three other contractors also participated.
- Result: Tender opening completed
10/06/2026 09:19
ARRA 79 INVESTMENT CORPORATION join for the Package No. 04: Consulting on planning planning projects, preparing planning documents according to GIS package, which was invited for bidding by the Phòng Kinh tế xã Bảo Yên through an Open bidding as an independent entity.
- Result: Tender opening completed
06/06/2026 08:56
ARRA 79 INVESTMENT CORPORATION Won the bidding for the Package No. 01: Consulting on making technical economic reports package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng khu vực Bắc Hà through an assign shorthand as an independent entity.
- Result: Won
30/03/2026 20:30
ARRA 79 INVESTMENT CORPORATION Won the bidding for the Package 01: Consultancy on preparation of feasibility study report package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Đông Anh through an Open bidding as master consortium of LIÊN DANH CÔNG TY CỔ PHẦN ĐẦU TƯ A.R.R.A 79 VÀ CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI PCCC VIỆT NHẬT VÀ CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG TUẤN NHẬT. Five other contractors also participated.
- Result: Won
20/03/2026 18:10
ARRA 79 INVESTMENT CORPORATION Won the bidding for the Package No. 3: Consulting on survey and planning package, which was invited for bidding by the UBND xã Võ Lao through an Open bidding as an independent entity.
- Result: Won
17/03/2026 19:10
ARRA 79 INVESTMENT CORPORATION Won the bidding for the Bidding package No. 06: Consulting on surveying, preparing design of financial protection - estimates package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng tỉnh Lào Cai through an assign shorthand as master consortium of Liên danh Công ty cổ phần đầu tư A.R.R.A.79, Công ty TNHH tư vấn công nghiệp Lào Cai và Công ty TNHH tư vấn kiến trúc xây dựng Bảo Long.
- Result: Won
10/03/2026 14:26
ARRA 79 INVESTMENT CORPORATION Won the bidding for the Bidding package No. 06: Consulting on surveying, preparing design of financial protection - estimates. package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng tỉnh Lào Cai through an assign shorthand as master consortium of Liên danh Công ty cổ phần đầu tư A.R.R.A79, Công ty TNHH tư vấn công nghiệp Lào Cai và Công ty TNHH tư vấn kiến trúc xây dựng Bảo Long.
- Result: Won
10/03/2026 14:11
ARRA 79 INVESTMENT CORPORATION join for the Package 01: Consultancy on preparation of feasibility study report package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng xã Đông Anh through an Open bidding as master consortium of CÔNG TY CỔ PHẦN ĐẦU TƯ A.R.R.A 79. Five other contractors also participated.
- Result: Tender opening completed
09/03/2026 09:33
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder ARRA 79 INVESTMENT CORPORATION participated in 33 package, of which 31 package was won, failed 0 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ARRA 79 INVESTMENT CORPORATION is related to 8 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ARRA 79 INVESTMENT CORPORATION has a relationship with 12 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ARRA 79 INVESTMENT CORPORATION competed with 11 contractors in 12 package, won 12 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor ARRA 79 INVESTMENT CORPORATION once entered into a partnership with 12 contractors in 18 package, won bid 18 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor ARRA 79 INVESTMENT CORPORATION participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ARRA 79 INVESTMENT CORPORATION participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,054 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor