Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:33 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
Data analysis results of DauThau.info software for contractors G&P BAC A INVESTMENT JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 40 bidding packages, of which 5 were won, 32 were lost, 3 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 42.61% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 65.28% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (10), TP.Hồ Chí Minh (4), Đồng Tháp (3), Đà Nẵng (3), Bắc Ninh (3), Gia Lai (3), Phú Thọ (2), Lâm Đồng (2), Quảng Ninh (1), Lạng Sơn (1), Cà Mau (1), Điện Biên (1), Đắk Lắk (1), Ninh Bình (1), Vĩnh Long (1), Quảng Trị (1), Thái Nguyên (1), Lào Cai (1)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (10), TP.Hồ Chí Minh (4), Đà Nẵng (3), Bắc Ninh (3), Bình Định (3), Đồng Tháp (2), Vĩnh Phúc (2), Lâm Đồng (2), Quảng Ninh (1), Lạng Sơn (1), Cà Mau (1), Điện Biên (1), Phú Yên (1), Tiền Giang (1), Ninh Bình (1), Vĩnh Long (1), Quảng Trị (1), Thái Nguyên (1), Lào Cai (1)
- Has relationships with 35 Bid Solicitors
- Has competed against 112 contractors in 39 bidding packages, won 5 packages, lost 31 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 80% |
| Lower by 10% to 20% | 1 | 20% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 0 | 0% |
| Lower by 0% to 1% | 0 | 0% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 5 | 100% |
G&P BAC A INVESTMENT JOINT STOCK COMPANY lost the bidding for the buy 70 degree alcohol to prevent and control Covid-19 epidemic for the 4th time package, which was invited for bidding by the Trung tâm Y tế thành phố Sa Đéc through an Chào hàng cạnh tranh trong nước as an independent entity. Six other contractors also participated.
- Result: Lost
29/07/2022 07:58
G&P BAC A INVESTMENT JOINT STOCK COMPANY lost the bidding for the Buy non-woven bags for the program to reduce the use of single-use plastic products and non-degradable plastic bags at markets in Lao Cai province in 2021 package, which was invited for bidding by the Lao Cai Environment Protection Fund through an Chào hàng cạnh tranh rút gọn trong nước as an independent entity. Ten other contractors also participated.
- Result: Lost
21/07/2022 16:26
G&P BAC A INVESTMENT JOINT STOCK COMPANY join for the Buy non-woven bags for the program to reduce the use of single-use plastic products and non-degradable plastic bags at markets in Lao Cai province in 2021 package, which was invited for bidding by the Lao Cai Environment Protection Fund through an Chào hàng cạnh tranh rút gọn trong nước as an independent entity. Ten other contractors also participated.
- Result: Tender opening completed
17/06/2022 17:48
G&P BAC A INVESTMENT JOINT STOCK COMPANY lost the bidding for the Package No. 2: N95 mask package, which was invited for bidding by the Traditional medicine Ministry of public security through an Chào hàng cạnh tranh rút gọn trong nước as an independent entity. Four other contractors also participated.
- Result: Lost
17/06/2022 14:56
G&P BAC A INVESTMENT JOINT STOCK COMPANY lost the bidding for the Providing T-shirts and canvas bags as communication and promotional items for Vietnam Internet Center package, which was invited for bidding by the Viet Nam Internet Network Information Center through an Đấu thầu rộng rãi trong nước as an independent entity. Four other contractors also participated.
- Result: Lost
14/06/2022 16:20
G&P BAC A INVESTMENT JOINT STOCK COMPANY lost the bidding for the Package 02: Protective equipment, including 02 items package, which was invited for bidding by the Trung tâm Y tế khu vực Đà Lạt through an Đấu thầu rộng rãi trong nước as an independent entity. Seven other contractors also participated.
- Result: Lost
31/05/2022 09:48
G&P BAC A INVESTMENT JOINT STOCK COMPANY join for the Providing T-shirts and canvas bags as communication and promotional items for Vietnam Internet Center package, which was invited for bidding by the Viet Nam Internet Network Information Center through an Đấu thầu rộng rãi trong nước as an independent entity. Four other contractors also participated.
- Result: Tender opening completed
27/05/2022 16:11
G&P BAC A INVESTMENT JOINT STOCK COMPANY lost the bidding for the Buy personal protective equipment in 2022 from Vinh Phuc Provincial General Hospital package, which was invited for bidding by the Vinh Phuc General Hospital through an Đấu thầu rộng rãi trong nước as an independent entity. Seven other contractors also participated.
- Result: Lost
07/05/2022 08:47
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder G&P BAC A INVESTMENT JOINT STOCK COMPANY participated in 40 package, of which 5 package was won, failed 32 packages, 3 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor G&P BAC A INVESTMENT JOINT STOCK COMPANY is related to 35 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor G&P BAC A INVESTMENT JOINT STOCK COMPANY competed with 112 contractors in 39 package, won 5 package, lost 31 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor G&P BAC A INVESTMENT JOINT STOCK COMPANY participated in bidding in 18 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor G&P BAC A INVESTMENT JOINT STOCK COMPANY participated in bidding in 19 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor