Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 15 bidding packages, of which 11 were won, 0 were lost, 4 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 98.15% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 76.77% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (11), Ninh Bình (1), Undefined (3)
- Has relationships with 7 Bid Solicitors
- Has competed against 12 contractors in 12 bidding packages, won 7 packages, lost 0 packages, 5 are pending results, and 0 were canceled.
- Has collaborated with 8 contractors in 10 bidding packages, won 9 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 2 | 18.2% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 3 | 27.3% |
Lower by 0% to 1% | 3 | 27.3% |
0% | 1 | 9.1% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 2 | 18.2% |
Unknown | 0 | 0% |
Total | 11 | 100% |
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY join for the Tender package No 03: Consulting on construction design implementation after basic design - estimate package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Quốc Oai through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY LẮP HÒA THỊNH. One other contractors also participated.
25/10/2024 17:40
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY join for the Tender package No 03: Consulting on construction design implementation after basic design package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Quốc Oai through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY LẮP HÒA THỊNH. One other contractors also participated.
22/10/2024 11:10
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY Won the bidding for the Package No. 01: Construction and installation of fire protection equipment package, which was invited for bidding by the TRƯỜNG ĐẠI HỌC CÔNG NGHIỆP DỆT MAY HÀ NỘI through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
07/10/2024 16:40
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY join for the package, which was invited for bidding by the TRƯỜNG ĐẠI HỌC CÔNG NGHIỆP DỆT MAY HÀ NỘI through an Open bidding as an independent entity. Two other contractors also participated.
22/08/2024 10:16
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY Won the bidding for the Package No. 12: Construction (Excluding wastewater treatment station and power supply system) package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Chương Mỹ, thành phố Hà Nội through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN XÂY DỰNG GIAO THÔNG LONG THÀNH. One other contractors also participated.
- Result: Won
22/05/2024 15:30
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY Won the bidding for the Package 01: Consulting survey, making economic - technical reports package, which was invited for bidding by the Ban quản lý dự án đàu tư xây dựng huyện Yên Mô through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI NAM SÔNG HỒNG. Two other contractors also participated.
- Result: Won
25/07/2023 08:13
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY Won the bidding for the Procurement of fire fighting equipment in 2022 package, which was invited for bidding by the HỌC VIỆN CHÍNH TRỊ CÔNG AN NHÂN DÂN through an assign shorthand as an independent entity.
- Result: Won
03/01/2023 09:42
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY Won the bidding for the Package 04: Design consultancy BVTC -DT package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Ứng Hòa through an Đấu thầu rộng rãi trong nước as sub-joint of Liên danh Công ty TNHH tư vấn thiết kế và thi công xây dựng Hà Nội và Công ty cổ phần đầu tư và xây lắp Hòa Thịnh(0106753162 - Công ty TNHH tư vấn thiết kế và thi công xây dựng Hà Nội,0106718880 - CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY LẮP HÒA THỊNH). One other contractors also participated.
- Result: Won
02/08/2022 06:57
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY Won the bidding for the Package 03: BVTC design consultancy + cost estimate package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Ứng Hòa through an Đấu thầu rộng rãi trong nước as sub-joint of Liên danh Công ty cổ phần tư vấn thiết kế xây dựng tổng hợp Hà Nội và Công ty cổ phần đầu tư và xây lắp Hòa Thịnh(0500596214 - Công ty cổ phần tư vấn thiết kế xây dựng tổng hợp Hà Nội,0106718880 - CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY LẮP HÒA THỊNH). One other contractors also participated.
- Result: Won
11/07/2022 08:19
HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY Won the bidding for the Package 03: Design consultancy BVTC-DT package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Ứng Hòa through an Đấu thầu rộng rãi trong nước as sub-joint of Liên danh Công ty cổ phần tư vấn thiết kế xây dựng Tổng Hợp Hà Nội và Công ty cổ phần đầu tư và xây lắp Hòa Thịnh(0500596214 - Công ty cổ phần tư vấn thiết kế xây dựng tổng hợp Hà Nội,0106718880 - CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY LẮP HÒA THỊNH). One other contractors also participated.
- Result: Won
30/06/2022 08:13
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY participated in 15 package, of which 11 package was won, failed 0 packages, 4 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY is related to 7 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY competed with 12 contractors in 12 package, won 7 package, lost 0 package, 5 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY once entered into a partnership with 8 contractors in 10 package, won bid 9 package, lost 0 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HOA THINH INSTALLATION CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY participated in bidding in 2 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,772 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code