Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors CÔNG TY CỔ PHẦN LAM SƠN are as follows:
You need to Login or Sign up to view all informations.
- Participated in 100 bidding packages, of which 77 were won, 20 were lost, 3 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 82.47% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.16% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Gia Lai (52), Đắk Lắk (4), Kon Tum (3), Quảng Bình (2), Đà Nẵng (1), Bình Định (1), Bình Phước (1), Đắk Nông (1), Undefined (36)
- Has relationships with 39 Bid Solicitors
- Has competed against 67 contractors in 41 bidding packages, won 20 packages, lost 18 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 30 contractors in 23 bidding packages, won 22 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: Công ty cổ phần Lam Sơn
- Construction capacity certificate code: 00007761
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Gia Lai
- Field:
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: giao thông đường bộ
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 2 | 2.6% |
Lower by 5% to 10% | 2 | 2.6% |
Lower by 1% to 5% | 11 | 14.3% |
Lower by 0% to 1% | 58 | 75.3% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 1 | 1.3% |
Higher by 10% or more | 3 | 3.9% |
Unknown | 0 | 0% |
Total | 77 | 100% |
CÔNG TY CỔ PHẦN LAM SƠN lost the bidding for the XD-09: Construction of water supply system Version 14; Khe Sung village; Institutional residential area package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG TỔNG HỢP TIẾN MINH through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
23/10/2024 16:36
CÔNG TY CỔ PHẦN LAM SƠN join for the Package XD-08: Construction and upgrading of roads from the intersection of Team 3 residential area to Team 3 production area and to the e720 training field; Branch road into Team 2 production area and into Reservoir No. 3 Team 2/e720 package, which was invited for bidding by the Binh đoàn 16 through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN LAM SƠN. Three other contractors also participated.
22/10/2024 08:00
CÔNG TY CỔ PHẦN LAM SƠN join for the XD-07: Construction of National Highway 9B to Ban Bach Dan package, which was invited for bidding by the CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG TỔNG HỢP TIẾN MINH through an Open bidding as an independent entity. Seven other contractors also participated.
27/09/2024 08:00
CÔNG TY CỔ PHẦN LAM SƠN Won the bidding for the Civil Works package, which was invited for bidding by the Ủy ban nhân dân phường Ia Kring through an Competitive Offer as an independent entity.
- Result: Won
15/09/2024 14:10
CÔNG TY CỔ PHẦN LAM SƠN Won the bidding for the Civil Works package, which was invited for bidding by the Phòng lao động thương binh và xã hội huyện Ia Grai through an Competitive Offer as an independent entity.
- Result: Won
11/09/2024 07:53
CÔNG TY CỔ PHẦN LAM SƠN lost the bidding for the Civil Works package, which was invited for bidding by the Ủy ban nhân dân phường Ia Kring through an Competitive Offer as an independent entity.
- Result: Lost
17/07/2024 13:22
CÔNG TY CỔ PHẦN LAM SƠN Won the bidding for the Package XD-01: Construction of clean water system for production team and e719 military and civil medical clinic package, which was invited for bidding by the Binh đoàn 16 through an Open bidding as an independent entity.
- Result: Won
08/07/2024 10:38
CÔNG TY CỔ PHẦN LAM SƠN lost the bidding for the Package XL-01: Investment in construction of union works, transportation, irrigation, and support for production development package, which was invited for bidding by the Đoàn Kinh tế Quốc phòng 737 through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
01/07/2024 10:18
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY CỔ PHẦN LAM SƠN participated in 100 package, of which 77 package was won, failed 20 packages, 3 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN LAM SƠN is related to 39 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CỔ PHẦN LAM SƠN competed with 67 contractors in 41 package, won 20 package, lost 18 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY CỔ PHẦN LAM SƠN once entered into a partnership with 30 contractors in 23 package, won bid 22 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY CỔ PHẦN LAM SƠN participated in bidding in 8 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code