Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:10 AM 11/25/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:29 AM 11/25/2022 |
Active |
At the request of QTHT |
|
12:01 AM 03/07/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
10:24 AM 03/09/2023 |
Active |
At the request of QTHT |
|
11:38 PM 12/21/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
5:23 AM 12/22/2023 |
Active |
At the request of QTHT |
|
12:06 AM 09/04/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
2:18 PM 09/04/2024 |
Active |
At the request of QTHT |
|
12:06 AM 09/21/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:06 AM 09/23/2024 |
Active |
At the request of QTHT |
|
12:06 AM 11/08/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:53 AM 11/08/2024 |
Active |
At the request of QTHT |
|
12:05 AM 03/04/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
4:53 PM 03/06/2025 |
Active |
At the request of QTHT |
|
12:05 AM 05/30/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
11:30 AM 05/30/2025 |
Active |
At the request of QTHT |
|
12:05 AM 08/02/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
3:21 PM 08/04/2025 |
Active |
At the request of QTHT |
|
12:05 AM 09/02/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:28 AM 09/03/2025 |
Active |
At the request of QTHT |
|
12:05 AM 11/07/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:36 AM 11/07/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 214 bidding packages, of which 82 were won, 116 were lost, 7 are pending results, and 9 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 39.8% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.2% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (90), Đà Nẵng (42), Đắk Lắk (12), Quảng Ngãi (11), Gia Lai (10), Đồng Nai (8), Tây Ninh (8), Lâm Đồng (7), Khánh Hòa (6), Hà Nội (6), Cần Thơ (4), Vĩnh Long (3), Quảng Ninh (3), Đồng Tháp (2), Huế (2), Quảng Trị (2), An Giang (1), Hải Phòng (1), Hưng Yên (1), Nationwide (1), Undefined (3)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (59), Đà Nẵng (36), Bình Dương (8), Đồng Nai (8), Long An (6), Bà Rịa - Vũng Tàu (6), Hà Nội (6), Đắk Lắk (6), Quảng Ngãi (6), Kon Tum (4), Bình Định (4), Gia Lai (4), Bình Thuận (4), Khánh Hòa (3), Quảng Ninh (3), Đồng Tháp (2), Hậu Giang (2), Cần Thơ (2), Vĩnh Long (2), Huế (2), Ninh Thuận (2), Tây Ninh (1), Trà Vinh (1), Phú Yên (1), Đắk Nông (1), Kiên Giang (1), Hải Dương (1), Thái Bình (1), Undefined (43)
- Has relationships with 89 Bid Solicitors
- Has competed against 190 contractors in 195 bidding packages, won 60 packages, lost 111 packages, 17 are pending results, and 7 were canceled.
- Has collaborated with 5 contractors in 9 bidding packages, won 3 packages, lost 4 packages, 2 are pending results, and 0 were canceled.
- Received 1 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 4.9% |
| Lower by 10% to 20% | 11 | 13.4% |
| Lower by 5% to 10% | 29 | 35.4% |
| Lower by 1% to 5% | 29 | 35.4% |
| Lower by 0% to 1% | 5 | 6.1% |
| 0% | 2 | 2.4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 1 | 1.2% |
| Higher by 10% or more | 1 | 1.2% |
| Unknown | 0 | 0% |
| Total | 82 | 100% |
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY Won the bidding for the Maintenance and technical support services for switchboard and information technology systems package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - TRUNG TÂM CHĂM SÓC KHÁCH HÀNG through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Won
12/01/2026 15:03
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY Won the bidding for the Package No. 2: Supply, installation and installation of equipment for project OT systemInvestment in building IT & VTDR system in 2026 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC GIA LAI through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
12/01/2026 08:32
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY lost the bidding for the Package No. 1: Supply, installation and installation of equipment for project IT system: Investment in building IT system & VTDR in 2026 package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
06/01/2026 16:53
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY Won the bidding for the Package No. 01/CNTT TTDK 26: Supply of VTTB and installation package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC ĐẮK LẮK - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN TRUNG through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Won
06/01/2026 14:25
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY join for the Maintenance and technical support services for switchboard and information technology systems package, which was invited for bidding by the through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Tender opening completed
05/01/2026 09:02
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY lost the bidding for the Extending warranty and genuine technical support services for EVNSPC's HP and Fujitsu server systems in 2025 package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
30/12/2025 14:53
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY Won the bidding for the Subscription renewal for 02 Acunetix security vulnerability scanning software and Beyontrust privileged account management software package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - TRUNG TÂM CHĂM SÓC KHÁCH HÀNG through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
24/12/2025 10:19
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY join for the Subscription renewal for 02 Acunetix security vulnerability scanning software and Beyontrust privileged account management software package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
22/12/2025 09:20
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY lost the bidding for the Equipping application code weakness scanning system for EVNSPC package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH - CÔNG TY CÔNG NGHỆ THÔNG TIN ĐIỆN LỰC MIỀN NAM through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
17/12/2025 00:57
POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY Won the bidding for the Package 01-HH-FW: Supply and installation of firewall system package, which was invited for bidding by the CÔNG TY DỊCH VỤ ĐIỆN LỰC MIỀN TRUNG - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN TRUNG through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
13/12/2025 15:38
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY participated in 214 package, of which 82 package was won, failed 116 packages, 7 packages with no results, 9 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY is related to 89 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY competed with 190 contractors in 195 package, won 60 package, lost 111 package, 17 bidding package has no results, 7 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY once entered into a partnership with 5 contractors in 9 package, won bid 3 package, lost 4 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY participated in bidding in 19 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER OF PASSION TECHNOLOGY SOLUTIONS JOINT STOCK COMPANY participated in bidding in 28 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,723 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor