Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 are as follows:
You need to Login or Sign up to view all informations.
- Participated in 65 bidding packages, of which 53 were won, 11 were lost, 1 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 85.12% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.45% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (31), Hậu Giang (7), Long An (2), An Giang (2), TP.Hồ Chí Minh (2), Kiên Giang (1), Đồng Tháp (1), Cần Thơ (1), Bến Tre (1), Bình Dương (1), Nationwide (1), Undefined (15)
- Has relationships with 13 Bid Solicitors
- Has competed against 26 contractors in 31 bidding packages, won 16 packages, lost 10 packages, 5 are pending results, and 0 were canceled.
- Has collaborated with 11 contractors in 19 bidding packages, won 16 packages, lost 2 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 2 | 3.8% |
Lower by 10% to 20% | 2 | 3.8% |
Lower by 5% to 10% | 8 | 15.1% |
Lower by 1% to 5% | 6 | 11.3% |
Lower by 0% to 1% | 29 | 54.7% |
0% | 2 | 3.8% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 1 | 1.9% |
Higher by 5% to 10% | 1 | 1.9% |
Higher by 10% or more | 2 | 3.8% |
Unknown | 0 | 0% |
Total | 53 | 100% |
INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 lost the bidding for the Package No. 19: Ensuring water traffic safety package, which was invited for bidding by the ONECONS CONSTRUCTION CONSULTANCY CO., LTD through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
16/10/2024 16:46
INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 Won the bidding for the TTBH-MB01: replace signals on Kinh Thay, Kinh Mon, Lai Vu, Mao Khe, Thai Binh rivers (section from N3 Mia to N3 Lau Khe), Van Uc - Gua (section from N3 Cua Dua to N3 Mui Guom ), Cau Xe - Cane; Replacing signals on the Han - Cam, Phi Liet - Da Bach, Ruot Lon, Dao Ha Ly, Lach Tray, Van Uc - Gua rivers (section from Van Uc estuary to N3 Cua Dua), Khe and Thai Binh canals ( section from Thai Binh gate to Quy Cao) package, which was invited for bidding by the Vietnam Inland Waterway Administration through an Open bidding as master consortium of CÔNG TY CỔ PHẦN QUẢN LÝ BẢO TRÌ ĐƯỜNG THỦY NỘI ĐỊA SỐ 13. One other contractors also participated.
- Result: Won
19/09/2024 09:42
INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 Won the bidding for the XL.TTBHMN-02: Construction and replacement of signs in MN 02 area - 2024 package, which was invited for bidding by the Vietnam Inland Waterway Administration through an Open bidding as an independent entity.
- Result: Won
13/09/2024 16:06
INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 Won the bidding for the Construction package, which was invited for bidding by the HOANG QUAN CONSTRUCTION DEVELOPMENT CONSULTING COMPANY LIMITED through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN CÔNG TRÌNH GIAO THÔNG SÀI GÒN.
- Result: Won
30/08/2024 15:59
INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 Won the bidding for the Package No. 05: Survey and map the construction area package, which was invited for bidding by the AN GIANG POWER AND WATER SUPPLY JOINT STOCK COMPANY through an assign shorthand as an independent entity.
- Result: Won
24/08/2024 09:09
INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 Won the bidding for the SCPN. Maintaining and repairing mooring buoys for boats to avoid storms and floods in the Central region in 2024 package, which was invited for bidding by the Vietnam Inland Waterway Administration through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
19/08/2024 11:31
INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 Won the bidding for the Construction package, which was invited for bidding by the Sở Giao thông vận tải tỉnh Hậu Giang through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
14/08/2024 16:33
INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 lost the bidding for the Construction package, which was invited for bidding by the GENERAL CONSTRUCTION CONSUTANT LIMITED COMPANY TIN DUC through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
06/06/2024 14:03
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 participated in 65 package, of which 53 package was won, failed 11 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 is related to 13 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 competed with 26 contractors in 31 package, won 16 package, lost 10 package, 5 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 once entered into a partnership with 11 contractors in 19 package, won bid 16 package, lost 2 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO 13 participated in bidding in 10 provinces/cities, 1 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,772 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code