Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors BIM GENERAL JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 35 bidding packages, of which 27 were won, 5 were lost, 1 are pending results, and 2 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 97.98% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.26% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Lào Cai (10), Hà Nội (9), Lạng Sơn (6), Bắc Cạn (1), Hải Dương (1), Nghệ An (1), Thái Bình (1), Yên Bái (1), Undefined (5)
- Has relationships with 16 Bid Solicitors
- Has competed against 9 contractors in 10 bidding packages, won 5 packages, lost 5 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 6 contractors in 5 bidding packages, won 5 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 8 | 29.6% |
Lower by 0% to 1% | 14 | 51.9% |
0% | 0 | 0% |
Higher by 0% to 1% | 2 | 7.4% |
Higher by 1% to 5% | 2 | 7.4% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 1 | 3.7% |
Unknown | 0 | 0% |
Total | 27 | 100% |
BIM GENERAL JOINT STOCK COMPANY Won the bidding for the Package 03: All construction and traffic safety assurance package, which was invited for bidding by the Ban Duy tu các công trình hạ tầng giao thông through an Open bidding as an independent entity.
- Result: Won
21/10/2024 14:21
BIM GENERAL JOINT STOCK COMPANY Won the bidding for the Package 03: All construction and traffic safety assurance package, which was invited for bidding by the Ban Duy tu các công trình hạ tầng giao thông through an Open bidding as an independent entity.
- Result: Won
14/08/2024 09:55
BIM GENERAL JOINT STOCK COMPANY lost the bidding for the Package No. 01: Construction works (Repair of Ban Chuc bridge Km196+806, Khuoi Lu bridge Km200+449, Na Tan bridge Km228+028 National Highway 279, Lang Son province) package, which was invited for bidding by the Sở Giao thông vận tải tỉnh Lạng Sơn through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
17/04/2024 10:26
BIM GENERAL JOINT STOCK COMPANY Won the bidding for the Package No. 3: Construction of works under the Ban Ban Bridge project in Na Ang A village, Na Hoi commune, Bac Ha district package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng huyện Bắc Hà through an Open bidding as an independent entity.
- Result: Won
22/02/2024 16:07
BIM GENERAL JOINT STOCK COMPANY Won the bidding for the Package No. 03: Construction of works under the Bridge project in Di Thang - Ly Chu Phin village, Na Hoi commune, Bac Ha district package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng huyện Bắc Hà through an Open bidding as an independent entity.
- Result: Won
22/11/2023 15:51
BIM GENERAL JOINT STOCK COMPANY Won the bidding for the Package 03: All construction and traffic safety assurance package, which was invited for bidding by the Ban Duy tu các công trình hạ tầng giao thông through an Open bidding as an independent entity.
- Result: Won
08/11/2023 17:02
BIM GENERAL JOINT STOCK COMPANY Won the bidding for the Package 03: All construction and traffic safety assurance package, which was invited for bidding by the Ban Duy tu các công trình hạ tầng giao thông through an Open bidding as an independent entity.
- Result: Won
08/11/2023 16:15
BIM GENERAL JOINT STOCK COMPANY Won the bidding for the Package 07: Construction of works (item: 18m reinforced concrete bridge + stream improvement + bridgehead road + environmental protection fee for bridge part) under the project Road to Bac Ha district general hospital package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng huyện Bắc Hà through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN XÂY DỰNG VŨ HẢI.
- Result: Won
09/08/2023 09:54
BIM GENERAL JOINT STOCK COMPANY Won the bidding for the Construction and repair of drainage works at Km20+625, Khanh Hoa - Minh Xuan street (DT.171), Yen Bai province package, which was invited for bidding by the Ban Quản lý bảo trì đường bộ tỉnh Yên Bái through an Open bidding as master consortium of CÔNG TY CỔ PHẦN TỔNG HỢP BIM. One other contractors also participated.
- Result: Won
22/07/2023 08:48
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder BIM GENERAL JOINT STOCK COMPANY participated in 35 package, of which 27 package was won, failed 5 packages, 1 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BIM GENERAL JOINT STOCK COMPANY is related to 16 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BIM GENERAL JOINT STOCK COMPANY competed with 9 contractors in 10 package, won 5 package, lost 5 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor BIM GENERAL JOINT STOCK COMPANY once entered into a partnership with 6 contractors in 5 package, won bid 5 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor BIM GENERAL JOINT STOCK COMPANY participated in bidding in 8 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,772 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code