History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
10:41 PM 10/15/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:39 AM 11/03/2022 |
Active |
At the request of QTHT |
|
1:59 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:31 AM 09/12/2023 |
Active |
At the request of QTHT |
|
6:35 AM 04/01/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
8:32 AM 04/03/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 67 bidding packages, of which 64 were won, 3 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 19.42% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.27% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (61), Undefined (6)
- Provinces before the merger where the contractor has participated in bidding : Bà Rịa - Vũng Tàu (44), TP.Hồ Chí Minh (7), Undefined (16)
- Has relationships with 16 Bid Solicitors
- Has relationships with 20 Bid Investors
- Has competed against 15 contractors in 9 bidding packages, won 6 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 5 bidding packages, won 3 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 85 bidding packages with 12 roles.
- Published contractor selection plan of 38 project with a total of 208 of bidding packages.
- Invitation to bid 45 package (with 46 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 19 packages announced, canceled bids 0 packages (among the packages above).
- There are 5 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY are as follows:
- As the investor of 2 investment and development projects.
- As the investor of 1 Contractor Selection Plan, including 1 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 5 bidding package in which the package is self-inviting 5, with 0 the package is owned by the unit. other bidding.
- Building organization name: Công ty Cổ phần Tư vấn xây dựng Bình Minh
- Construction capacity certificate code: 00002724
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Bà Rịa - Vũng Tàu
- Field:
⚬ Khảo sát xây dựng: Địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Đường bộ
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Giao thông Đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thủy lợi
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật Trừ công trình xử lý chất thải rắn
⚬ Giám sát thi công xây dựng công trình: Thủy lợi
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật Trừ công trình xử lý chất thải rắn
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 4 | 6.3% |
| Lower by 10% to 20% | 1 | 1.6% |
| Lower by 5% to 10% | 4 | 6.3% |
| Lower by 1% to 5% | 12 | 18.8% |
| Lower by 0% to 1% | 4 | 6.3% |
| 0% | 25 | 39.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 14 | 21.9% |
| Unknown | 0 | 0% |
| Total | 64 | 100% |
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Package No. 05 (Construction supervision consultancy) package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng xã Long Điền through an assign shorthand as an independent entity.
- Result: Won
22/08/2026 14:43
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Consulting on evaluation of Bidding Documents and evaluation of construction and construction results package, which was invited for bidding by the Ban Quản lý dự án Đầu tư xây dựng xã Châu Pha through an assign shorthand as an independent entity.
- Result: Won
09/08/2026 05:20
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Consultancy on appraisal of documents and results of LCNT package, which was invited for bidding by the Ban Quản lý dự án Đầu tư xây dựng xã Châu Pha through an assign shorthand as an independent entity.
- Result: Won
06/08/2026 22:40
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Survey supervision consulting package, which was invited for bidding by the Ban Quản lý dự án Đầu tư xây dựng xã Châu Pha through an assign shorthand as an independent entity.
- Result: Won
16/06/2026 07:59
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Consulting on supervision of topographic survey and preparation of feasibility study report package, which was invited for bidding by the Ban Quản lý dự án Đầu tư xây dựng xã Châu Pha through an assign shorthand as an independent entity.
- Result: Won
11/06/2026 09:17
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Consulting on survey supervision and preparation of Feasibility Study Report package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG PHƯỜNG BÀ RỊA through an assign shorthand as an independent entity.
- Result: Won
08/06/2026 17:34
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Consulting on construction design and construction design after basic design and construction estimate (package 05) package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG PHƯỜNG TÂN PHƯỚC through an assign shorthand as an independent entity.
- Result: Won
11/05/2026 14:59
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Consulting on topographic survey and feasibility study report preparation (package no. 03) package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG PHƯỜNG TÂN THÀNH through an assign shorthand as an independent entity.
- Result: Won
13/04/2026 17:45
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Construction supervision consultant package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN ĐẦU TƯ XÂY DỰNG PHƯỜNG BÀ RỊA through an assign shorthand as an independent entity.
- Result: Won
31/03/2026 09:30
BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY Won the bidding for the Consulting on preparing a report proposing project investment policies package, which was invited for bidding by the phòng Kinh tế, Hạ tầng và Đô thị phường Bà Rịa through an assign shorthand as an independent entity.
- Result: Won
10/02/2026 15:00
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY participated in 67 package, of which 64 package was won, failed 3 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY is related to 16 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY has a relationship with 20 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY competed with 15 contractors in 9 package, won 6 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY once entered into a partnership with 2 contractors in 5 package, won bid 3 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH CONSTRUCTION CONSULTANTS JOINT STOCK COMPANY participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor