History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
11:22 PM 10/15/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:48 AM 10/17/2022 |
Active |
At the request of QTHT |
|
10:04 AM 11/18/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
10:42 AM 11/21/2022 |
Active |
At the request of QTHT |
|
10:49 PM 12/27/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:14 AM 12/28/2022 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 980 bidding packages, of which 520 were won, 421 were lost, 21 are pending results, and 18 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 7% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 92.97% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (861), Hà Nội (5), Đồng Nai (4), Lâm Đồng (4), An Giang (3), Gia Lai (1), Vĩnh Long (1), Đồng Tháp (1), Hải Phòng (1), Hưng Yên (1), Lào Cai (1), Quảng Ninh (1), Lai Châu (1), Undefined (97)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (712), Hà Nội (5), Đồng Nai (4), Kiên Giang (3), Bình Dương (3), Gia Lai (1), Bến Tre (1), Bình Thuận (1), Đồng Tháp (1), Quảng Ninh (1), Lai Châu (1), Undefined (248)
- Has relationships with 72 Bid Solicitors
- Has relationships with 68 Bid Investors
- Has competed against 119 contractors in 712 bidding packages, won 263 packages, lost 419 packages, 22 are pending results, and 8 were canceled.
- Has collaborated with 13 contractors in 20 bidding packages, won 9 packages, lost 10 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 130 bidding packages with 19 roles.
- Building organization name: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH
- Construction capacity certificate code: 00004351
- Issuing Authority: Sở Kế hoạch và Đầu tư Thành phố Hồ Chí Minh
- Field:
⚬ Khảo sát xây dựng: Địa hình
⚬ Giám sát thi công xây dựng công trình: Công nghiệp (đường dây và trạm biến áp)
⚬ Thi công xây dựng công trình: Công nghiệp (đường dây và trạm biến áp)
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế; thẩm tra thiết kế xây dựng (kiến trúc; kết cấu; điện - cơ điện; cấp - thoát nước) công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế; thẩm tra thiết kế xây dựng (kiến trúc; kết cấu; điện - cơ điện; cấp - thoát nước) công trình: Công nghiệp
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế; thẩm tra thiết kế xây dựng công trình hạ tầng kỹ thuật cấp nước; thoát nước; cống cáp; hào kỹ thuật
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật cấp nước; thoát nước; cống cáp; hào kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Công nghiệp
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật cấp nước; thoát nước
⚬ Khảo sát xây dựng: Khảo sát địa chất công trình: Hạng II./.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 163 | 31.3% |
| Lower by 10% to 20% | 156 | 30% |
| Lower by 5% to 10% | 106 | 20.4% |
| Lower by 1% to 5% | 53 | 10.2% |
| Lower by 0% to 1% | 15 | 2.9% |
| 0% | 16 | 3.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 1 | 0.2% |
| Higher by 5% to 10% | 1 | 0.2% |
| Higher by 10% or more | 9 | 1.7% |
| Unknown | 0 | 0% |
| Total | 520 | 100% |
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY Won the bidding for the Consultancy on making feasibility study report package, which was invited for bidding by the Project Investment Management Authority for Civil and Industry through an assign shorthand as an independent entity.
- Result: Won
27/08/2026 17:49
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY Won the bidding for the Topographic survey consulting package, which was invited for bidding by the Project Investment Management Authority for Civil and Industry through an assign shorthand as an independent entity.
- Result: Won
27/08/2026 17:25
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY join for the Consulting on surveying, preparing F/S report and TKBVTC-DT for the project "Renovating and upgrading Mui Doi cutting station - Binh Duong Electricity Company" package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - BAN QUẢN LÝ DỰ ÁN LƯỚI ĐIỆN PHÂN PHỐI THÀNH PHỐ HỒ CHÍ MINH through an Open bidding as an independent entity. One other contractors also participated.
27/08/2026 10:18
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY Won the bidding for the Construction supervision consultancy for the project "Renovating the power grid in the area of Tran Binh Trong Street, Vuon Lai Ward, Ho Chi Minh City" package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC SÀI GÒN through an Open bidding as an independent entity.
- Result: Won
27/08/2026 09:55
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY lost the bidding for the Consulting on construction supervision of electrical parts (including supervision of construction of head boxes, medium voltage underground cable junction boxes), non-electrical parts and electric telecommunications parts for the project: "Undergrounding of medium and low voltage power grid on Kha Van Can street (section from Thu Duc intersection to Pham Van Dong street), Thu Duc City" package, which was invited for bidding by the hochiminh city power corporation through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
25/08/2026 16:31
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY join for the Consulting on survey and project design "Upgrading and developing stations and low voltage grids in Ban Co, Cau Kieu, Duc Nhuan, Vuon Lai, Dien Hong, Tan Son Nhat Wards - Year 2027" package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC SÀI GÒN through an Open bidding as an independent entity. One other contractors also participated.
24/08/2026 15:01
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY Won the bidding for the Consulting on surveys, preparing support documents, and compensating for power grid technical infrastructure package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông through an assign shorthand as an independent entity.
- Result: Won
23/08/2026 13:17
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY join for the Consulting on surveying and designing projects to upgrade and develop public low voltage stations and grids in Tan Dinh Ward, Ben Thanh, Ong Lanh Bridge, Nhieu Loc, Tan Binh - 2027. package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC SÀI GÒN through an Open bidding as an independent entity. One other contractors also participated.
23/08/2026 10:11
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY join for the Tender package No 07 - Consulting on surveying, preparing F/S and TKBVTC-DT for the project "New construction and upgrading of medium and low voltage power grids and substations from 1P to 3P in the communes of Ho Tram, Hoa Hiep, Binh Chau, Bau Lam, Hoa Hoi, Xuyen Moc". package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC ĐẤT ĐỎ through an Open bidding as an independent entity. Three other contractors also participated.
22/08/2026 10:09
HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY join for the Project survey and design consulting: Upgrading and developing stations and low voltage grids in Xuan Hoa Ward, Saigon, Phu Nhuan, Hoa Hung, Bay Hien - 2027 package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC SÀI GÒN through an Open bidding as an independent entity. One other contractors also participated.
21/08/2026 11:06
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY participated in 980 package, of which 520 package was won, failed 421 packages, 21 packages with no results, 18 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY is related to 72 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY has a relationship with 68 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY competed with 119 contractors in 712 package, won 263 package, lost 419 package, 22 bidding package has no results, 8 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY once entered into a partnership with 13 contractors in 20 package, won bid 9 package, lost 10 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY participated in bidding in 13 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor HO CHI MINH CITY POWER ENGINEERING CONSTRUCTION CONSULTING JOINT STOCK COMPANY participated in bidding in 11 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor