Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 45 bidding packages, of which 42 were won, 2 were lost, 1 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 92.63% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.06% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Vĩnh Phúc (9), Hà Nội (7), Phú Thọ (3), Thanh Hoá (2), Hà Nam (2), Hưng Yên (2), Bắc Ninh (1), Bắc Giang (1), Nghệ An (1), Thái Nguyên (1), Cao Bằng (1), Khánh Hòa (1), Undefined (14)
- Has relationships with 29 Bid Solicitors
- Has competed against 28 contractors in 29 bidding packages, won 24 packages, lost 2 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 25 contractors in 32 bidding packages, won 31 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN VÀ THIẾT BỊ CÔNG NGHIỆP
- Construction capacity certificate code: 00030009
- Issuing Authority: Sở kế hoạch đầu tư Thành phố Hà Nội
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Đường dây và TBA
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Công nghiệp Đường dây và TBA
⚬ Giám sát thi công xây dựng công trình: NN&PTNT Cơ điện
⚬ Thi công xây dựng công trình: Công nghiệp nhẹ Đường dây và TBA
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: NN&PTNT
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 4 | 9.5% |
Lower by 10% to 20% | 5 | 11.9% |
Lower by 5% to 10% | 7 | 16.7% |
Lower by 1% to 5% | 12 | 28.6% |
Lower by 0% to 1% | 6 | 14.3% |
0% | 5 | 11.9% |
Higher by 0% to 1% | 1 | 2.4% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 2 | 4.8% |
Unknown | 0 | 0% |
Total | 42 | 100% |
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Construction supervision package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông tỉnh Vĩnh Phúc through an assign shorthand as an independent entity.
- Result: Won
25/10/2024 09:10
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Package 01: Consulting survey, design construction drawings package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Văn Giang through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH MIỀN BẮC. Four other contractors also participated.
- Result: Won
24/10/2024 10:32
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Package No. 23: Consulting on verifying design documents and estimating construction drawing design steps package, which was invited for bidding by the Ban Quản lý dự án hạ tầng Khu kinh tế và Khu công nghiệp through an Open bidding as sub-joint of Viện Khoa học và Công nghệ Giao thông vận tải. One other contractors also participated.
- Result: Won
25/09/2024 11:21
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY lost the bidding for the Package 02: Construction supervision consultancy, equipment installation package, which was invited for bidding by the Cao Bang City Investment and Construction Project Management Unit through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN VÀ THIẾT BỊ CÔNG NGHIỆP. Five other contractors also participated.
- Result: Lost
16/07/2024 11:03
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Package No. 5: Survey, prepare construction drawing design - estimate package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Chương Mỹ, thành phố Hà Nội through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG THUỶ LỢI THUỶ ĐIỆN THĂNG LONG.
- Result: Won
11/07/2024 17:57
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Consultancy on surveying, preparing design of financial protection design and project estimates package, which was invited for bidding by the VIETNAM TECHNICAL CONSTRUCTION AND PLANNING CONSULTANT JOINT STOCK COMPANY through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN QUỐC TẾ GIAO THÔNG VẬN TẢI.
- Result: Won
08/07/2024 15:15
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Survey consulting; BVTC design package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng công trình huyện Vĩnh Tường through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN GIAO THÔNG VĨNH PHÚC. One other contractors also participated.
- Result: Won
01/07/2024 14:15
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY Won the bidding for the TV3: Prepare feasibility study report; Prepare construction drawing designs and total construction estimates package, which was invited for bidding by the HOUSING DEVELOPMENT INVESTMENT JOINT STOCK COMPANY HUD2 through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ QUY HOẠCH HẠ TẦNG VIỆT NAM. One other contractors also participated.
- Result: Won
25/06/2024 08:35
POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Package No. 01: Survey and prepare an economic-technical report for the project: Replacing the electrical cabinet system of Nhu Trac pumping station package, which was invited for bidding by the NORTHERN NAM HA IRRGATIONAL PROJECT EXPLOTATION COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
21/06/2024 09:04
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY participated in 45 package, of which 42 package was won, failed 2 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY is related to 29 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY competed with 28 contractors in 29 package, won 24 package, lost 2 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY once entered into a partnership with 25 contractors in 32 package, won bid 31 package, lost 0 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor POWER CONSTRUCTION CONSULTANCY AND INDUSTRIAL EQUIPMENT JOINT STOCK COMPANY participated in bidding in 12 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code