Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 51 bidding packages, of which 43 were won, 4 were lost, 3 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 98.91% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.3% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (42), Undefined (9)
- Has relationships with 18 Bid Solicitors
- Has competed against 18 contractors in 22 bidding packages, won 17 packages, lost 4 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 16 contractors in 20 bidding packages, won 19 packages, lost 0 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 1 | 2.3% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 1 | 2.3% |
Lower by 0% to 1% | 41 | 95.3% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 43 | 100% |
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY join for the Package 04: The whole construction part + ensure traffic safety package, which was invited for bidding by the Phòng quản lý đô thị huyện Ba Vì through an Open bidding as an independent entity.
30/10/2024 11:15
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package 03: The whole construction part + Ensuring traffic safety package, which was invited for bidding by the Phòng quản lý đô thị huyện Ba Vì through an Open bidding as an independent entity.
- Result: Won
24/10/2024 15:52
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package No. 03: Entire construction part + equipment costs package, which was invited for bidding by the Phòng Lao động - Thương binh và xã hội huyện Ba Vì through an Open bidding as sub-joint of CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG - DỊCH VỤ - THƯƠNG MẠI NGỌC CHÂU.
- Result: Won
23/09/2024 19:07
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package No. 05: Construction of works + equipment package, which was invited for bidding by the Phòng Dân tộc huyện Ba Vì through an Open bidding as an independent entity.
- Result: Won
23/07/2024 14:28
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package 02: The whole construction part package, which was invited for bidding by the Phòng giáo dục và đào tạo huyện Ba Vì through an Open bidding as an independent entity.
- Result: Won
20/07/2024 18:31
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package 03: The whole construction part + Ensure traffic safety package, which was invited for bidding by the Phòng quản lý đô thị huyện Ba Vì through an Open bidding as master consortium of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐỒNG TÂM.
- Result: Won
20/07/2024 15:07
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package No. 05: Construction of works + equipment package, which was invited for bidding by the Phòng Dân tộc huyện Ba Vì through an Open bidding as sub-joint of CÔNG TY TNHH THƯƠNG MẠI XÂY DỰNG VÀ DỊCH VỤ THĂNG LONG. Two other contractors also participated.
- Result: Won
05/07/2024 15:17
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package No. 03: Entire construction part + equipment costs package, which was invited for bidding by the Phòng Lao động - Thương binh và xã hội huyện Ba Vì through an Open bidding as an independent entity.
- Result: Won
03/07/2024 16:41
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package No. 03: Entire construction part + equipment costs package, which was invited for bidding by the Phòng Lao động - Thương binh và xã hội huyện Ba Vì through an Open bidding as master consortium of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐỒNG TÂM. One other contractors also participated.
- Result: Won
03/07/2024 16:17
DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY Won the bidding for the Package No. 06: Construction works and ensuring traffic safety package, which was invited for bidding by the BAN QLDA ĐẦU TƯ XÂY DỰNG HUYỆN BA VÌ through an Open bidding as master consortium of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐỒNG TÂM. One other contractors also participated.
- Result: Won
02/07/2024 09:37
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY participated in 51 package, of which 43 package was won, failed 4 packages, 3 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY is related to 18 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY competed with 18 contractors in 22 package, won 17 package, lost 4 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY once entered into a partnership with 16 contractors in 20 package, won bid 19 package, lost 0 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor DONG TAM CONSULTANT CONSTRUCTION AND TRADING JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,806 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Add contractor
Security Code