Data analysis results of DauThau.info software for contractors Hydraulic Construction Joint Stock Company N° 01. are as follows:
You need to Login or Sign up to view all informations.
- Participated in 41 bidding packages, of which 15 were won, 24 were lost, 2 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 72.27% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 86.31% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Quảng Ninh (7), Bắc Ninh (1), Hà Nội (1), Bình Định (1), Undefined (31)
- Has relationships with 25 Bid Solicitors
- Has competed against 76 contractors in 26 bidding packages, won 1 packages, lost 23 packages, 2 are pending results, and 0 were canceled.
- Has collaborated with 11 contractors in 13 bidding packages, won 8 packages, lost 5 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: Công ty cổ phần xây dựng Thủy lợi 1
- Construction capacity certificate code: 00017579
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Bắc Ninh
- Field:
⚬ Thi công xây dựng công trình: Nông nghiệp & PTNT
- Lab name: Materials laboratory and construction quality inspection
- Laboratory code: LAS-XD 553
- Certifications:
⚬ Certificate 763/GCN-BXD.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 4 | 26.7% |
Lower by 10% to 20% | 1 | 6.7% |
Lower by 5% to 10% | 1 | 6.7% |
Lower by 1% to 5% | 1 | 6.7% |
Lower by 0% to 1% | 6 | 40% |
0% | 1 | 6.7% |
Higher by 0% to 1% | 1 | 6.7% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 15 | 100% |
Hydraulic Construction Joint Stock Company N° 01. Won the bidding for the Repair and maintenance of wheel loader 4 package, which was invited for bidding by the DONG TRIEU THERMAL POWER COMPANY - BRANCH OF VINACOMIN - POWER HOLDING CORPORATION through an assign shorthand as an independent entity.
- Result: Won
13/03/2023 16:31
Hydraulic Construction Joint Stock Company N° 01. lost the bidding for the Package 12: Construction work package, which was invited for bidding by the Sở Nông nghiệp và phát triển nông thôn tỉnh Cao Bằng through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
28/12/2022 15:59
Hydraulic Construction Joint Stock Company N° 01. lost the bidding for the Package 04: Construction + construction equipment package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN D VÀ A through an widely bid as sub-joint of CÔNG TY CỔ PHẦN SẢN XUẤT CÔNG NGHIỆP XÂY LẮP 3.
- Result: Lost
08/12/2022 00:00
Hydraulic Construction Joint Stock Company N° 01. Won the bidding for the Package 4: Supply of materials, equipment and repair services for excavators No. 1 and No. 5 Mao Khe Thermal Power Plant package, which was invited for bidding by the CÔNG TY NHIỆT ĐIỆN ĐÔNG TRIỀU - TKV - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC TKV - CTCP through an Chào hàng cạnh tranh trong nước as an independent entity.
- Result: Won
06/04/2022 16:16
Hydraulic Construction Joint Stock Company N° 01. lost the bidding for the Package 4: Supply of materials, equipment and repair services for excavators No. 1 and No. 5 Mao Khe Thermal Power Plant package, which was invited for bidding by the CÔNG TY NHIỆT ĐIỆN ĐÔNG TRIỀU - TKV - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC TKV - CTCP through an Chào hàng cạnh tranh trong nước as an independent entity. One other contractors also participated.
- Result: Lost
14/01/2022 10:00
Hydraulic Construction Joint Stock Company N° 01. lost the bidding for the The entire volume of construction work package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình nông nghiệp và phát triển nông thôn tỉnh Bình Định through an Đấu thầu rộng rãi trong nước as an independent entity. Two other contractors also participated.
- Result: Lost
16/06/2021 10:41
Hydraulic Construction Joint Stock Company N° 01. lost the bidding for the No. 23 (C1-BD-GD2W4) : Construction of two reservoirs Ho Trinh and Cay Ta package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình nông nghiệp và phát triển nông thôn tỉnh Bình Định through an Đấu thầu rộng rãi as an independent entity. Five other contractors also participated.
- Result: Lost
26/05/2021 17:18
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder Hydraulic Construction Joint Stock Company N° 01. participated in 41 package, of which 15 package was won, failed 24 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Hydraulic Construction Joint Stock Company N° 01. is related to 25 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor Hydraulic Construction Joint Stock Company N° 01. competed with 76 contractors in 26 package, won 1 package, lost 23 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor Hydraulic Construction Joint Stock Company N° 01. once entered into a partnership with 11 contractors in 13 package, won bid 8 package, lost 5 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor Hydraulic Construction Joint Stock Company N° 01. participated in bidding in 4 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code