Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC are as follows:
You need to Login or Sign up to view all informations.
- Participated in 31 bidding packages, of which 19 were won, 8 were lost, 1 are pending results, and 3 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 91.71% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.64% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Lào Cai (30), Undefined (1)
- Has relationships with 6 Bid Solicitors
- Has competed against 24 contractors in 16 bidding packages, won 3 packages, lost 6 packages, 6 are pending results, and 1 were canceled.
- Has collaborated with 4 contractors in 5 bidding packages, won 5 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: Công ty CP đầu tư xây dựng và thương mại HLC
- Construction capacity certificate code: 00037449
- Issuing Authority: Sở Kế hoạch và Đầu tư tinh Lào Cai
- Field:
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 2 | 10.5% |
Lower by 1% to 5% | 4 | 21.1% |
Lower by 0% to 1% | 12 | 63.2% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 1 | 5.3% |
Unknown | 0 | 0% |
Total | 19 | 100% |
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC join for the Construction and installation of Sin Quyen copper mine weighing station package, which was invited for bidding by the Chi nhánh Mỏ tuyển đồng Sin Quyền, Lào Cai - Vimico through an Competitive Offer as master consortium of CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC. Three other contractors also participated.
26/10/2024 14:05
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC Won the bidding for the Construction and implementation of environmental criteria in areas of open-pit mining, transportation, and auxiliary workshops package, which was invited for bidding by the Chi nhánh Mỏ tuyển đồng Sin Quyền, Lào Cai - Vimico through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
23/10/2024 11:26
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC Won the bidding for the Construction and repair of architectural works of auxiliary transportation workshops, material warehouses and M&E workshops package, which was invited for bidding by the Chi nhánh Mỏ tuyển đồng Sin Quyền, Lào Cai - Vimico through an Open bidding as master consortium of CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC.
- Result: Won
11/10/2024 16:41
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC Won the bidding for the Construction, repair and restoration of beam frame of magnetic sorting machine system 1 package, which was invited for bidding by the Chi nhánh Mỏ tuyển đồng Sin Quyền, Lào Cai - Vimico through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
07/10/2024 17:46
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC Won the bidding for the Package 4: Construction of the project: Renovating and upgrading the road surrounding Goc Mit market, Kim Tan ward, Lao Cai city package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng thành phố Lào Cai through an Open bidding as sub-joint of CÔNG TY TNHH MTV XÂY DỰNG NGỌC HƯNG .
- Result: Won
02/10/2024 11:29
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC lost the bidding for the Construction of collective house renovation package, which was invited for bidding by the TỔNG CÔNG TY KHOÁNG SẢN TKV-CTCP-CHI NHÁNH LUYỆN ĐỒNG LÀO CAI-VIMICO through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
17/09/2024 09:56
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC Won the bidding for the Construction and installation of raw ore weighing station at ground area +168 of Vi Kem mine package, which was invited for bidding by the Chi nhánh Mỏ tuyển đồng Sin Quyền, Lào Cai - Vimico through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
21/08/2024 08:22
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC lost the bidding for the Construction of embankment to prevent landslides package, which was invited for bidding by the Chi nhánh Mỏ tuyển đồng Sin Quyền, Lào Cai - Vimico through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
15/08/2024 14:14
CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC lost the bidding for the Construction and repair of houses, preparation of materials 301 package, which was invited for bidding by the TỔNG CÔNG TY KHOÁNG SẢN TKV-CTCP-CHI NHÁNH LUYỆN ĐỒNG LÀO CAI-VIMICO through an Competitive Offer as an independent entity. Three other contractors also participated.
- Result: Lost
11/07/2024 16:07
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC participated in 31 package, of which 19 package was won, failed 8 packages, 1 packages with no results, 3 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC is related to 6 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC competed with 24 contractors in 16 package, won 3 package, lost 6 package, 6 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC once entered into a partnership with 4 contractors in 5 package, won bid 5 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI HLC participated in bidding in 1 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,772 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code