Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
| Company name | CÔNG TY ĐIỆN LỰC CÀ MAU |
|
||||||||||||||||||
| Views | 1172 | |||||||||||||||||||
| Business Tax ID | 0300942001025 | |||||||||||||||||||
| Head office address before merger | Số 288a Đường Trần Hưng Đạo Khóm 8, 5 Ward, Cà Mau City, Cà Mau | |||||||||||||||||||
| Head office address after merger | Cà Mau | |||||||||||||||||||
| Company Establishment Date | 23/03/2007 | |||||||||||||||||||
| The number of workers | 753 | |||||||||||||||||||
| Company Status | Active | |||||||||||||||||||
| Date of registration on the Public procurement system | 03/12/2017 | |||||||||||||||||||
| Payment Status |
Tài khoản chưa nộp phí duy trì. Sau ngày 31/03/2018 tài khoản sẽ hết hiệu lực.
According to Circular 06/2021, from March 3, 2022, investors and contractors will be stopped from trading if they do not pay fees for posting information, selecting contractors, investors on the national bidding network system. |
|||||||||||||||||||
Business industry of CÔNG TY ĐIỆN LỰC CÀ MAU |
||||||||||||||||||||
|
||||||||||||||||||||
History of active status changes
Data analysis results of DauThau.info software for contractors CÔNG TY ĐIỆN LỰC CÀ MAU are as follows:
You need to Login or Sign up to view all informations.
- Participated in 57 bidding packages, of which 57 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 16.89% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 86.69% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Cà Mau (12), Undefined (45)
- Provinces before the merger where the contractor has participated in bidding : Cà Mau (11), Bạc Liêu (1), Undefined (45)
- Has relationships with 8 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 348 bidding packages with 30 roles.
- Published contractor selection plan of 370 project with a total of 475 of bidding packages.
- Invitation to bid 515 package (with 540 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 330 packages announced, canceled bids 0 packages (among the packages above).
- There are 48 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors PC CAMAU are as follows:
- As the investor of 34 investment and development projects.
- As the investor of 490 Contractor Selection Plan, including 403 self-published Contractor Selection Plan, 87 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 391 bidding package in which the package is self-inviting 359, with 32 the package is owned by the unit. other bidding.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 12 | 21.1% |
| Lower by 10% to 20% | 16 | 28.1% |
| Lower by 5% to 10% | 7 | 12.3% |
| Lower by 1% to 5% | 5 | 8.8% |
| Lower by 0% to 1% | 2 | 3.5% |
| 0% | 15 | 26.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 57 | 100% |
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package No. 02: Making BCNCKT, TKBVTC and estimate package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
03/09/2025 09:05
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package No. 02: Making BCNCKT, TKBVTC and estimate package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
03/09/2025 08:18
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package 02: Making BCNCKT, MAKE TKBVTC and Estimation. Project: Investment in renovation, upgrading lower voltage grid from 1 phase to 3 phases and developing auxiliary grid in Thoi Binh district in 2026 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
29/08/2025 13:54
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package No. 02: Making BCNCKT, TKBVTC and estimate package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
29/08/2025 13:38
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package No. 02: Making BCNCKT, TKBVTC and estimate package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
29/08/2025 13:36
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package 02: Making BCNCKT, making TKBVTC and estimates. Investing in renovating and upgrading lower voltage central grids from 1 phase to 3 phases and developing the supporting grid in Tran Van Thoi district in 2026 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
29/08/2025 13:08
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package No. 02: Making BCNCKT, preparing TKBVTC and project estimates: Investing in renovating and upgrading lower voltage central grids from 1 phase to 3 phases and developing auxiliary and deleted grid in Dam Doi district in 2026. package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
27/08/2025 16:51
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package 02: Making BCNCKT, preparing TKBVTC and the project estimate: Investing in renovating and upgrading the voltage medium voltage grid from 1 phase to 3 phases and developing auxiliary grid in Ca Mau City in 2026. package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
27/08/2025 15:59
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package No. 01: Investigate, measure, collect data for the establishment package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
27/08/2025 10:34
CÔNG TY ĐIỆN LỰC CÀ MAU Won the bidding for the Package No. 01: Investigate, measure, collect data for the establishment package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC CÀ MAU through an do it yourself as an independent entity.
- Result: Won
27/08/2025 10:12
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY ĐIỆN LỰC CÀ MAU participated in 57 package, of which 57 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY ĐIỆN LỰC CÀ MAU is related to 8 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY ĐIỆN LỰC CÀ MAU participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY ĐIỆN LỰC CÀ MAU participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,725 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor